693JJ22540000YP10PR0100014
Project Grant
Overview
Grant Description
Project title: Widening PR-100, from Int. PR-308 (KM 8.4) to PR-101 (KM 14.7) inc. Bicycle lane, Municipality of Cabo Rojo
Project description: The proposed works consist of the widening of existing highway PR-100 and the construction of bicycle lanes along both traffic directions of the road.
The proposed works include the construction of a pre cast box culvert, reinforced concrete retaining walls, MSE gabion wall, pipe and waterways drainage improvements, headwalls, cold milling, asphalt pavement preservation, sidewalks, rip rap, traffic delineators, erosion control measures, milled shoulder rumble strips (MSRS), signing and pavement markings, W-beam guard rail, traffic signal systems improvements, electrical utilities, maintenance and protection of traffic and other miscellaneous works as shown on plans.
Project description: The proposed works consist of the widening of existing highway PR-100 and the construction of bicycle lanes along both traffic directions of the road.
The proposed works include the construction of a pre cast box culvert, reinforced concrete retaining walls, MSE gabion wall, pipe and waterways drainage improvements, headwalls, cold milling, asphalt pavement preservation, sidewalks, rip rap, traffic delineators, erosion control measures, milled shoulder rumble strips (MSRS), signing and pavement markings, W-beam guard rail, traffic signal systems improvements, electrical utilities, maintenance and protection of traffic and other miscellaneous works as shown on plans.
Funding Goals
NOT APPLICABLE
Grant Program (CFDA)
Awarding / Funding Agency
Place of Performance
Puerto Rico
United States
Geographic Scope
State-Wide
Related Opportunity
NOT APPLICABLE
Puerto Rico Highway & Transportation Authority was awarded
Widening PR-100 Highway with Bicycle Lane Construction in Cabo Rojo
Project Grant 693JJ22540000YP10PR0100014
worth $5,423,463
from the FHWA Office of the Chief Financial Officer in March 2025 with work to be completed primarily in Puerto Rico United States.
The grant
has a duration of 5 years and
was awarded through assistance program 20.205 Highway Planning and Construction.
Status
(Ongoing)
Last Modified 10/3/25
Period of Performance
3/17/25
Start Date
2/17/30
End Date
Funding Split
$5.4M
Federal Obligation
$0.0
Non-Federal Obligation
$5.4M
Total Obligated
Activity Timeline
Additional Detail
Award ID FAIN
693JJ22540000YP10PR0100014
SAI Number
693JJ22540000YP10PR010001400199998
Award ID URI
SAI EXEMPT
Awardee Classifications
U.S. Territory Or Possession
Awarding Office
693JJ2 FHWA OFC OF THE CHIEF FIN OFFICER
Funding Office
693JJ2 FHWA OFC OF THE CHIEF FIN OFFICER
Awardee UEI
LLHHFKQLNAL4
Awardee CAGE
5PR34
Performance District
PR-98
Modified: 10/3/25