Grant Description
Project title: Bourne- Bridge replacement, B-17-005, (ARF) (SAGAMORE BRIDGE), US 6 over the Cape Cod Canal, Sandwich Road (Route 6A) and MCR/MBTA railroad, includes:
Project description: FHG(BIP1)-CAPS(025), FHG(MEGA1)-CAPS(025) - Bourne- Bridge replacement, B-17-005, (ARF) (SAGAMORE BRIDGE), US 6 over the Cape Cod Canal, Sandwich Road (Route 6A) and MCR/MBTA railroad, includes replacement of B-17-027 Route 3 over US 6 (Cape Cod Bridges Program Phase I).
Project description: FHG(BIP1)-CAPS(025), FHG(MEGA1)-CAPS(025) - Bourne- Bridge replacement, B-17-005, (ARF) (SAGAMORE BRIDGE), US 6 over the Cape Cod Canal, Sandwich Road (Route 6A) and MCR/MBTA railroad, includes replacement of B-17-027 Route 3 over US 6 (Cape Cod Bridges Program Phase I).
Funding Goals
THE GOALS OF THE BIP ARE: 1) TO IMPROVE THE SAFETY, EFFICIENCY, AND RELIABILITY OF THE MOVEMENT OF PEOPLE AND FREIGHT OVER BRIDGES; 2) TO IMPROVE THE CONDITION OF BRIDGES IN THE UNITED STATES BY A) REDUCING THE NUMBER OF BRIDGES IN POOR CONDITION OR IN FAIR CONDITION AND AT RISK OF FALLING INTO POOR CONDITION WITHIN THE NEXT 3 YEARS, B) REDUCING THE TOTAL PERSON MILES TRAVELED OVER BRIDGES IN POOR CONDITION, OR IN FAIR CONDITION AND AT RISK OF FALLING INTO POOR CONDITION WITHIN THE NEXT 3 YEARS, C) REDUCING THE NUMBER OF BRIDGES THAT DO NOT MEET CURRENT GEOMETRIC DESIGN STANDARDS, OR CANNOT MEET THE LOAD AND TRAFFIC REQUIREMENTS TYPICAL OF THE REGIONAL TRANSPORTATION NETWORK, AND D) REDUCING THE TOTAL PERSON MILES TRAVELED OVER BRIDGES THAT DO NOT MEET CURRENT GEOMETRIC DESIGN STANDARDS, OR CANNOT MEET THE LOAD AND TRAFFIC REQUIREMENTS TYPICAL OF THE REGIONAL TRANSPORTATION NETWORK; 3) TO PROVIDE FINANCIAL ASSISTANCE THAT LEVERAGES AND ENCOURAGES NON-FEDERAL CONTRIBUTIONS FROM SPONSORS AND STAKEHOLDERS INVOLVED IN THE PLANNING, DESIGN, AND CONSTRUCTION OF ELIGIBLE PROJECTS.
Grant Program (CFDA)
20.264
Awarding / Funding Agency
Place of Performance
Barnstable,
Massachusetts
United States
Geographic Scope
County-Wide
Massachusetts Executive Office Of Transportation was awarded
Bourne Bridge Replacement Project - US 6 Over Cape Cod Canal
Project Grant 693JJ22440004Y178MACAPS025BIPL
worth $146,282,325
from the FHWA Office of the Chief Financial Officer in January 2025 with work to be completed primarily in Massachusetts United States.
The grant
has a duration of 17 years 10 months and
was awarded through assistance program 20.264 .
$36,570,581 (20.0%) of this Project Grant was funded by non-federal sources.
The Project Grant was awarded through grant opportunity Fiscal Year (FY) 2023 – 2026 Bridge Investment Program, Large Bridge Project Grants.
Status
(Ongoing)
Last Modified 9/28/26
Period of Performance
1/17/25
Start Date
11/23/42
End Date
Funding Split
$146.3M
Federal Obligation
$36.6M
Non-Federal Obligation
$182.9M
Total Obligated
Activity Timeline
Additional Detail
Award ID FAIN
693JJ22440004Y178MACAPS025BIPL
SAI Number
693JJ22440004Y178MACAPS025BIPL00300109
Award ID URI
SAI EXEMPT
Awardee Classifications
State Government
Awarding Office
693JJ2 FHWA OFC OF THE CHIEF FIN OFFICER
Funding Office
693JJ2 FHWA OFC OF THE CHIEF FIN OFFICER
Awardee UEI
DZ2UJEKM1FH4
Awardee CAGE
615L7
Performance District
MA-09
Senators
Edward Markey
Elizabeth Warren
Elizabeth Warren
Modified: 9/28/26