This project will plan improvements to the access road, docks, piers, mooring capacity, and Harbormaster office at the Saint Paul Harbor.
Activities to be performed
The project includes the following sequential planning and pre-construction activities to prepare for a future construction phase.
Component 1: Planning and Public Involvement
Develop and implement a plan for outreach and engagement with the community, stakeholders, and transportation system users.
The plan will include data collection and analysis, surveys, and public meetings.
Component 2: Harbor Road Design and Preconstruction Project Management
Topographic survey, geotechnical investigation, define/determine right of way requirements, complete an environmental assessment in preparation for construction and permitting.
Evaluate and design 35 percent, 65 percent, 95 percent, and final design sets.
The following measures to improve visibility along the Harbor Road:
Installation of signage, traffic calming measures, and warning systems.
Realignment away from harbor operations where heavy equipment and workers are present.
Installation of proper drainage infrastructure to efficiently collect and divert surface water away from the road.
Develop benefit-cost analysis.
Develop construction bid documents including procurement strategy, preparation of requests for proposal documents soliciting bids from contractors.
Component 3: City North Dock and Piers Design and Preconstruction Project Management
Topographic survey, geotechnical investigation, evaluate and design 35 percent, 65 percent, 95 percent, and final design sets.
The necessary repairs and improvements, additional equipment, utilities, and infrastructure to safely and efficiently accommodate all vessels.
Permitting Clean Water Act Section 10 and 404.
Complete an environmental assessment in preparation for construction and permitting.
Develop benefit-cost analysis.
Develop construction bid documents including procurement strategy, preparation of requests for proposal documents soliciting bids from contractors.
Component 4: City South Dock Design and Preconstruction Project Management
Design 35 percent, 65 percent, 95 percent, and final design sets for the installation and expansion of water, electric, and sewer utilities.
Component 5: Harbormaster's Office Project Management
Topographic survey, geotechnical investigation, NEPA environmental review and permitting.
Design a new and relocated Harbormaster office 35 percent, 65 percent, 95 percent, and final design plan sets.
Develop benefit-cost analysis.
Develop construction bid documents including procurement strategy, preparation of requests for proposal documents soliciting bids from contractors.
Deliverables
Expected outcomes: as a planning project, there are no performance measures.
Intended beneficiary: City of Saint Paul.
Subrecipient activities: none.
This project will plan improvements to the access road, docks, piers, mooring capacity, and Harbormaster office at the Saint Paul Harbor.
Activities to be performed
The project includes the following sequential planning and pre-construction activities to prepare for a future construction phase.
Component 1: Planning and Public Involvement
Develop and implement a plan for outreach and engagement with the community, stakeholders, and transportation system users.
The plan will include data collection and analysis, surveys, and public meetings.
Component 2: Harbor Road Design and Preconstruction Project Management
Topographic survey, geotechnical investigation, define/determine right of way requirements, complete an environmental assessment in preparation for construction and permitting.
Evaluate and design 35 percent, 65 percent, 95 percent, and final design sets.
The following measures to improve visibility along the Harbor Road:
Installation of signage, traffic calming measures, and warning systems.
Realignment away from harbor operations where heavy equipment and workers are present.
Installation of proper drainage infrastructure to efficiently collect and divert surface water away from the road.
Develop benefit-cost analysis.
Develop construction bid documents including procurement strategy, preparation of requests for proposal documents soliciting bids from contractors.
Component 3: City North Dock and Piers Design and Preconstruction Project Management
Topographic survey, geotechnical investigation, evaluate and design 35 percent, 65 percent, 95 percent, and final design sets.
The necessary repairs and improvements, additional equipment, utilities, and infrastructure to safely and efficiently accommodate all vessels.
Permitting Clean Water Act Section 10 and 404.
Complete an environmental assessment in preparation for construction and permitting.
Develop benefit-cost analysis.
Develop construction bid documents including procurement strategy, preparation of requests for proposal documents soliciting bids from contractors.
Component 4: City South Dock Design and Preconstruction Project Management
Design 35 percent, 65 percent, 95 percent, and final design sets for the installation and expansion of water, electric, and sewer utilities.
Component 5: Harbormaster's Office Project Management
Topographic survey, geotechnical investigation, NEPA environmental review and permitting.
Design a new and relocated Harbormaster office 35 percent, 65 percent, 95 percent, and final design plan sets.
Develop benefit-cost analysis.
Develop construction bid documents including procurement strategy, preparation of requests for proposal documents soliciting bids from contractors.
Deliverables
Expected outcomes: as a planning project, there are no performance measures.
Intended beneficiary: City of Saint Paul.
Subrecipient activities: none.
Awardee
Funding Goals
ASSIST IN FUNDING ELIGIBLE PROJECTS FOR THE PURPOSE OF IMPROVING THE SAFETY EFFICIENCY OR RELIABILITY OF THE MOVEMENT OF GOODS THROUGH PORTS AND INTERMODAL CONNECTIONS TO PORTS.
Grant Program (CFDA)
Awarding / Funding Agency
Place of Performance
Saint Paul Island,
Alaska
99660-0901
United States
Geographic Scope
Single Zip Code
Related Opportunity
City Of Saint Paul was awarded
Saint Paul Harbor Infrastructure Improvement Project
Project Grant 693JF72540049
worth $4,052,760
from Maritime Administration in February 2026 with work to be completed primarily in Saint Paul Island Alaska United States.
The grant
has a duration of 4 years 5 months and
was awarded through assistance program 20.933 National Infrastructure Investments.
$258,715 (6.0%) of this Project Grant was funded by non-federal sources.
The Project Grant was awarded through grant opportunity 2023 Port Infrastructure Development Program Grants.
Status
(Ongoing)
Last Modified 4/13/26
Period of Performance
2/25/26
Start Date
7/31/30
End Date
Funding Split
$4.1M
Federal Obligation
$258.7K
Non-Federal Obligation
$4.3M
Total Obligated
Activity Timeline
Additional Detail
Award ID FAIN
693JF72540049
SAI Number
None
Award ID URI
SAI NOT APPLICABLE
Awardee Classifications
State Government
Awarding Office
69A334 MARITIME ADMINISTRATION
Funding Office
69A334 MARITIME ADMINISTRATION
Awardee UEI
F9NRLCANGSE4
Awardee CAGE
1MSG1
Performance District
AK-00
Senators
Lisa Murkowski
Dan Sullivan
Dan Sullivan
Modified: 4/13/26