Search Prime Grants

693JF72540011

Project Grant

Overview

Grant Description
AWARD PURPOSE THE PROJECT INCLUDES THE PURCHASE OF TWO TIER 4 DIESEL REACH STACKERS 12 HYBRID PICK UP TRUCKS 14 TIER 4 YARD TRUCKS 11 TIER4 DIESEL TOP HANDLERS ONE WITH OVER HEIGHT SPREADER ONE TIER 4 DIESEL TOP HANDLER WITH LIMITED CAPACITY FOR HANDLING EMPTY CONTAINERS ONE TIER 4 FORKLIFT 12 5 TON CAPACITY 25 LIQUEFIED PETROLEUM GAS LPG TERMINAL TRACTORS REEFER RACKS TOTALING 192 SLOTS TWO HYBRID RUBBER TIRED GANTRY RTG CRANES WITH TWO SPARE SPREADERS AND ONE SPREADER TESTING BENCH. THE PROJECT ALSO INCLUDES PORT AND MARITIME MODERNIZATION PLANS ELECTRICAL SYSTEM UPGRADES AND ASSOCIATED CIVIL WORKS TO SUPPORT INCREASED TERMINAL POWER DEMAND HIGH MAST LIGHTING, OPTICAL CHARACTER RECOGNITION OCR AT THE CROWLEY TERMINAL GATE TWO CONCRETE RTG RUNS ONE MAINTENANCE SAFETY EQUIPMENT AND WASH STATION AND TWO PLUG IN STATIONS FOR THE HYBRID RTGS WHILE AT REST AT THE PORT EVERGLADES TERMINAL PET. ACTIVITIES TO BE PERFORMED COMPONENT 1 CROWLEY PROJECT ADMINISTRATION GRANT ADMINISTRATION AND FEES THROUGHOUT PROJECT LIFE CYCLE PORT AND MARITIME MODERNIZATION PLAN EQUIPMENT PURCHASE 2 REACH STACKERS TIER4 DIESEL 12 HYBRID PICK UP TRUCKS 14 TIER 4 YARD TRUCKS 4 TIER 4 DIESEL TOP HANDLERS CONSTRUCTION AND CIVIL WORK REEFER RACK CONSTRUCTION CONSTRUCT REEFER RACKS SUPPORTING 192 PLUGS TOTAL. ELECTRICAL UPGRADES ELECTRICAL SYSTEM UPGRADES SUCH AS NEW ELECTRIC UTILITY SUBSTATION CONSTRUCTION 24 HIGH MAST LIGHTING 2 OPTICAL CHARACTER RECOGNITION OCR PORTALS INFRASTRUCTURE WILL INCLUDE THE PORTAL STRUCTURE FOUNDATION AND CONNECTION TO TERMINAL ELECTRIC AND DATA SYSTEMS. COMPONENT 2 PORT EVERGLADES TERMINAL PROJECT ADMINISTRATION GRANT ADMINISTRATION AND FEES THROUGHOUT PROJECT LIFE CYCLE PORT AND MARITIME MODERNIZATION PLAN EQUIPMENT PURCHASE 7 TIER 4 STAGE 5 TOP HANDLERS ONE WITH OVER HEIGHT SPREADER 1 TIER 4 STAGE 5 TOP HANDLER WITH LIMITED CAPACITY FOR HANDLING EMPTY CONTAINERS 1 TIER4 DIESEL FORKLIFT 12 5 TON CAPACITY2 5 LIQUEFIED PETROLEUM GAS LPG TERMINAL TRACTORS2 DELIVERABLES EXPECTED OUTCOMES FROM SCHEDULE G PAGE 12 OF THE GRANT AGREEMENT MEASURE CARGO VOLUME. CATEGORY AND DESCRIPTION ECONOMIC COMPETITIVENESS AND OPPORTUNITY TOTAL TONS OF CARGO MOVED PER YEAR TEUS OR SHORT TONS. CARGO VOLUME MEASURES THE MOVEMENT OF FREIGHT THROUGH THE PROJECT STUDY AREA. WHEN APPLICABLE, REPORT THE TOTAL CARGO VOLUME AND THE VOLUME DISAGGREGATED BY TYPE OF FREIGHT IE CONTAINERS IN TEU AND BULK IN TONS OR TYPE OF INTERMODAL TRANSPORT (TRUCK OR RAIL. FREQUENCY QUARTERLY. MEASURE REPORTABLE EVENTS. CATEGORY AND DESCRIPTION SAFETY QUALITY OF LIFE TOTAL NUMBER OF REPORTABLE EVENTS PER YEAR. A REPORTABLE EVENT IS DEFINED AS A SAFETY OR SECURITY EVENT OCCURRING IN THE PROJECT STUDY AREA TERMINAL BERTH ETC THAT RESULTS IN ONE OR MORE OF THE FOLLOWING CONDITIONS A FATALITY CONFIRMED WITHIN 30 DAYS OF THE EVENT AN INJURY REQUIRING IMMEDIATE MEDICAL ATTENTION AWAY FROM THE SCENE FOR ONE OR MORE PERSON PROPERTY DAMAGE EQUAL TO OR EXCEEDING 25000 COLLISIONS INVOLVING VEHICLES OR VESSELS AN EVACUATION FOR LIFE SAFETY REASONS. FREQUENCY QUARTERLY. INTENDED BENEFICIARY BROWARD COUNTY OF SUBRECIPIENT ACTIVITIES NONE. INTENDED BENEFICIARY BROWARD COUNTY OF SUBRECIPIENT ACTIVITIES NONE.
Funding Goals
PROGRAM FUNDS PROJECTS THAT IMPROVE THE SAFETY EFFICIENCY OR RELIABILITY OF THE MOVEMENT OF GOODS THROUGH PORTS OR INTERMODAL CONNECTIONS TO PORTS.
Awarding / Funding Agency
Place of Performance
Fort Lauderdale, Florida 33301-1817 United States
Geographic Scope
Single Zip Code
County Of Broward was awarded Port Modernization : Equipment Purchase Infrastructure Upgrades Project Grant 693JF72540011 worth $53,357,402 from Maritime Administration in May 2026 with work to be completed primarily in Fort Lauderdale Florida United States. The grant has a duration of 5 years 6 months and was awarded through assistance program 20.823 Port Infrastructure Development Program. $24,992,001 (32.0%) of this Project Grant was funded by non-federal sources. The Project Grant was awarded through grant opportunity Port Infrastructure Development Program.

Status
(Ongoing)

Last Modified 5/14/26

Period of Performance
5/13/26
Start Date
11/30/31
End Date
0% Complete

Funding Split
$53.4M
Federal Obligation
$25.0M
Non-Federal Obligation
$78.3M
Total Obligated
68.0% Federal Funding
32.0% Non-Federal Funding

Activity Timeline

Interactive chart of timeline of amendments to 693JF72540011

Additional Detail

Award ID FAIN
693JF72540011
SAI Number
None
Award ID URI
SAI NOT APPLICABLE
Awardee Classifications
State Government
Awarding Office
69A334 MARITIME ADMINISTRATION
Funding Office
69A334 MARITIME ADMINISTRATION
Awardee UEI
P62KF2SJJ237
Awardee CAGE
34CV0
Performance District
FL-23
Senators
Marco Rubio
Rick Scott
Modified: 5/14/26