AWARD PURPOSE THIS PLANNING PROJECT WILL ADVANCE ENVIRONMENTAL REVIEW PERMITTING AND PRELIMINARY ENGINEERING AND DESIGN FOR THE INTERMODAL TERMINAL COMPONENT OF THE LARGER PCIP PROJECT INCLUDING THE RAILYARD CONTAINER YARD WHARF AND BERTHS. ACTIVITIES TO BE PERFORMED COMPONENT 1 PRELIMINARY ENGINEERING AND DESIGN OBJECTIVES GEOTECHNICAL AND BASIS OF DESIGN 30 PERCENT DESIGN 60PERCENT DESIGN. SPECIFIC SCOPE ITEMS WILL INCLUDE CIVIL ENGINEERING GRADING AND YARD DESIGN FIRE DESIGN RAIL DESIGN MODELING, COMPRESSED AIR DESIGN STORMWATER DESIGN AND REPORT WATER DESIGN SEWER DESIGN LIFT STATION DESIGN ANALYSIS DESIGN DUNE RISK COASTAL ENGINEERING DREDGING SLOPE PROTECTION ETC. COMPONENT 2 ENVIRONMENTAL AND PERMITTING OBJECTIVES ENVIRONMENTAL STUDIES NEPA PERMITTING SPECIFIC SCOPE ITEMS WILL INCLUDE ENVIRONMENTAL NEPA NEPA PROJECT MANAGEMENT AIR QUALITY BASELINE EMISSIONS GREENHOUSE GAS GHG EVALUATION AMBIENT NOISE IN AIR AND IN WATER NOISE SURFICIAL SOILS AND DUNES HABITAT CHARACTERIZATION AND MAPPING TERRESTRIAL WETLAND TIDAL SUBTIDAL WILDLIFE SURVEYS BALD EAGLE NESTS WADING BIRD ROOKERIES ETC HAZARDOUS TOXIC AND RADIOACTIVE WASTE CHARACTERIZATION PHASE I AND LEAD REMEDIATION PLAN AND SAMPLING HISTORICAL ARCHEOLOGICAL PLANETOLOGICAL TRIBAL STUDIES LAND USE OWNERSHIP RECREATIONAL USE SOCIOECONOMICS SCENIC AESTHETIC BASELINE INCLUDING LIGHT SOURCE ANALYSIS TRANSPORTATION BASELINE WORKER VEHICLE TRUCK TRAINS ON NORTH SPIT. COMPONENT 3 PROJECT ADMINISTRATION AND MANAGEMENT CONTRACT MANAGEMENT PROCUREMENT FUNDING ADMINISTRATION AND COMPLIANCE STAKEHOLDER ENGAGEMENT AND DAY TO DAY PROJECT MANAGEMENT TO ENSURE ALL SCOPES ARE MOVING FORWARD IN A TIMELY AND EFFICIENT MANNER. DELIVERABLES EXPECTED OUTCOMES FROM SCHEDULE G PAGE 11 OF THE GRANT AGREEMENT MEASURE JOBS CREATED WITHIN 5 YEARS OF DESIGN NEPA COMPLETION. CATEGORY AND DESCRIPTION ECONOMIC IMPACT TRACKS DIRECT INDIRECT AND INDUCED JOBS GENERATED BY THE PROJECT INCLUDING CONSTRUCTION JOBS PERMANENT TERMINAL OPERATIONS JOBS, AND INDUCED JOBS IN LOGISTICS AND SUPPLY CHAIN SECTORS. MEASUREMENT FREQUENCY ANNUAL. MEASURE TERMINAL CONSTRUCTION COMPLETION WITHIN 5 YEARS OF DESIGN NEPA COMPLETION. CATEGORY AND DESCRIPTION PROJECT DELIVERY AND INFRASTRUCTURE READINESS CONFIRMS SUBSTANTIAL COMPLETION OF TERMINAL CONSTRUCTION AND FULL OPERATIONAL READINESS WITHIN 5 YEARS OF DESIGN NEPA COMPLETION ENSURING TIMELY DELIVERY OF PROJECT BENEFITS. MEASUREMENT FREQUENCY ANNUAL. INTENDED BENEFICIARY OREGON INTERNATIONAL PORT OF COOS BAY. SUBRECIPIENT ACTIVITIES NONE.
Awardee
Funding Goals
BUILD GRANTS ARE TO BE AWARDED ON A COMPETITIVE BASIS FOR SURFACE TRANSPORTATION INFRASTRUCTURE PROJECTS WITH A SIGNIFICANT LOCAL OR REGIONAL IMPACT.
Grant Program (CFDA)
Awarding / Funding Agency
Place of Performance
Haines,
Alaska
99827-0490
United States
Geographic Scope
Single Zip Code
Related Opportunity
693JF72540001
Analysis Notes
Amendment Since initial award the End Date has been extended from 12/15/27 to 04/30/29 and the total obligations have increased 6% from $50,037,500 to $52,860,274.
Chilkoot Indian Association was awarded
Intermodal Terminal Planning Project Oregon International Port of Coos Bay
Project Grant 693JF72540001
worth $27,841,524
from Maritime Administration in February 2026 with work to be completed primarily in Haines Alaska United States.
The grant
has a duration of 3 years 2 months and
was awarded through assistance program 20.933 National Infrastructure Investments.
$25,018,750 (47.0%) of this Project Grant was funded by non-federal sources.
Status
(Ongoing)
Last Modified 6/30/26
Period of Performance
2/3/26
Start Date
4/30/29
End Date
Funding Split
$27.8M
Federal Obligation
$25.0M
Non-Federal Obligation
$52.9M
Total Obligated
Activity Timeline
Transaction History
Modifications to 693JF72540001
Additional Detail
Award ID FAIN
693JF72540001
SAI Number
None
Award ID URI
SAI NOT APPLICABLE
Awardee Classifications
For-Profit Organization (Other Than Small Business)
Awarding Office
69A334 MARITIME ADMINISTRATION
Funding Office
69A334 MARITIME ADMINISTRATION
Awardee UEI
S8TSEKJLX277
Awardee CAGE
39ZU6
Performance District
AK-00
Senators
Lisa Murkowski
Dan Sullivan
Dan Sullivan