The project will establish a new port at a site along the Missouri River.
The project will consist of constructing a new commodity handling facility storage for liquid commodities, receiving and handling equipment, conveyors, elevating legs, and additional infrastructure development such as internal road construction and site leveling to accommodate use of the southern side of the property for heavy industrial use.
Activities to be performed
Component 1: Construct a new commodity storage building
New storage and handling facility that is approximately 150-180 feet wide by 150-350 feet long and able to stage at least 9,000 tons of product with additional flexible capacity.
Component 2: Purchase receiving and handling equipment
Tripper conveyor approximately 388 feet in length with approximately 600 tons per hour capacity including support platform, 36-inch winch base, spout support, spouting, and accessories.
Tripper conveyor support catwalk (walkway on one side existing building receiving system).
Receiving leg steel enclosed drag conveyor approximately 42 feet in length with approximately 250 tons per hour capacity.
Elevator leg with an approximately 36-inch stainless steel fertilizer bucket elevator with a 65-foot discharge height and approximately 800 tons per hour capacity including spouting and accessories.
Elevator leg support tower with stairs.
Bare front excavator clamshell for excavator, extended stick boom for excavator, endloader, skid loader, additional jump transfer conveyors, a set of three conveyors approximately 36 inches by 70 feet in dimensions with the approximate capacity of 800 short tons per hour.
Barge loading hoppers and conveyors.
Component 3: Construct a new liquid storage facility
That will consist of an approximately 500,000-gallon liquid storage tank capable of offloading liquid from a barge or load liquid to a barge.
Component 4: Site planning and dirt work
Dirt work for the liquid facility construction and commodity storage building that will be based on the soil boring results for the soil.
Such work may include removal of topsoil and replacement with suitable material that would support the building structure and any additional road or driveway construction needed to comply with any state or federal regulations.
Component 5: Engineering as required for project construction and equipment purchase activities.
Component 6: Grant management, compliance, and administrative support activities
To include monitoring progress, maintaining accurate documentation, submitting required reports, and ensuring compliance with MARAD and other regulatory standards.
Component 7: Electrical upgrades
Component 8: Internal road construction and site leveling
To accommodate use of an area on the south side of the subject property for heavy industrial offloading.
Deliverables expected outcomes from Schedule G page 11 of the grant agreement
Measure cargo volume.
Category and description: Total tons of cargo moved per year, TEUs or short tons.
Cargo volume measures the movement of freight through the project study area.
When applicable, report the total cargo volume and the volume disaggregated by type of freight i.e., containers in TEU and bulk in tons or type of intermodal transport truck or rail.
Measurement frequency: Quarterly.
Measure vessel calls.
Category and description: Total vessel calls per year measures the number of vessels calling to the project study area.
Must be reported in total and disaggregated by any of the following where applicable: vessel type e.g., container, bulk, RO-RO, LNG freight capacity, vessel length, or other.
Measurement frequency: Quarterly.
Intended beneficiary: County of Monona.
Subrecipient activities: None.
The project will establish a new port at a site along the Missouri River.
The project will consist of constructing a new commodity handling facility storage for liquid commodities, receiving and handling equipment, conveyors, elevating legs, and additional infrastructure development such as internal road construction and site leveling to accommodate use of the southern side of the property for heavy industrial use.
Activities to be performed
Component 1: Construct a new commodity storage building
New storage and handling facility that is approximately 150-180 feet wide by 150-350 feet long and able to stage at least 9,000 tons of product with additional flexible capacity.
Component 2: Purchase receiving and handling equipment
Tripper conveyor approximately 388 feet in length with approximately 600 tons per hour capacity including support platform, 36-inch winch base, spout support, spouting, and accessories.
Tripper conveyor support catwalk (walkway on one side existing building receiving system).
Receiving leg steel enclosed drag conveyor approximately 42 feet in length with approximately 250 tons per hour capacity.
Elevator leg with an approximately 36-inch stainless steel fertilizer bucket elevator with a 65-foot discharge height and approximately 800 tons per hour capacity including spouting and accessories.
Elevator leg support tower with stairs.
Bare front excavator clamshell for excavator, extended stick boom for excavator, endloader, skid loader, additional jump transfer conveyors, a set of three conveyors approximately 36 inches by 70 feet in dimensions with the approximate capacity of 800 short tons per hour.
Barge loading hoppers and conveyors.
Component 3: Construct a new liquid storage facility
That will consist of an approximately 500,000-gallon liquid storage tank capable of offloading liquid from a barge or load liquid to a barge.
Component 4: Site planning and dirt work
Dirt work for the liquid facility construction and commodity storage building that will be based on the soil boring results for the soil.
Such work may include removal of topsoil and replacement with suitable material that would support the building structure and any additional road or driveway construction needed to comply with any state or federal regulations.
Component 5: Engineering as required for project construction and equipment purchase activities.
Component 6: Grant management, compliance, and administrative support activities
To include monitoring progress, maintaining accurate documentation, submitting required reports, and ensuring compliance with MARAD and other regulatory standards.
Component 7: Electrical upgrades
Component 8: Internal road construction and site leveling
To accommodate use of an area on the south side of the subject property for heavy industrial offloading.
Deliverables expected outcomes from Schedule G page 11 of the grant agreement
Measure cargo volume.
Category and description: Total tons of cargo moved per year, TEUs or short tons.
Cargo volume measures the movement of freight through the project study area.
When applicable, report the total cargo volume and the volume disaggregated by type of freight i.e., containers in TEU and bulk in tons or type of intermodal transport truck or rail.
Measurement frequency: Quarterly.
Measure vessel calls.
Category and description: Total vessel calls per year measures the number of vessels calling to the project study area.
Must be reported in total and disaggregated by any of the following where applicable: vessel type e.g., container, bulk, RO-RO, LNG freight capacity, vessel length, or other.
Measurement frequency: Quarterly.
Intended beneficiary: County of Monona.
Subrecipient activities: None.
Awardee
Funding Goals
ASSIST IN FUNDING ELIGIBLE PROJECTS FOR THE PURPOSE OF IMPROVING THE SAFETY EFFICIENCY OR RELIABILITY OF THE MOVEMENT OF GOODS THROUGH PORTS AND INTERMODAL CONNECTIONS TO PORTS.
Grant Program (CFDA)
Awarding / Funding Agency
Place of Performance
Onawa,
Iowa
51040-1626
United States
Geographic Scope
Single Zip Code
Related Opportunity
MAPID23001
County Of Monona was awarded
Missouri River Port Development Grant
Project Grant 693JF72444085
worth $10,262,240
from Maritime Administration in July 2026 with work to be completed primarily in Onawa Iowa United States.
The grant
has a duration of 3 years 3 months and
was awarded through assistance program 20.823 Port Infrastructure Development Program.
$2,565,560 (20.0%) of this Project Grant was funded by non-federal sources.
Status
(Ongoing)
Last Modified 7/22/26
Period of Performance
7/22/26
Start Date
10/31/29
End Date
Funding Split
$10.3M
Federal Obligation
$2.6M
Non-Federal Obligation
$12.8M
Total Obligated
Activity Timeline
Additional Detail
Award ID FAIN
693JF72444085
SAI Number
None
Award ID URI
SAI NOT APPLICABLE
Awardee Classifications
State Government
Awarding Office
69A334 MARITIME ADMINISTRATION
Funding Office
69A334 MARITIME ADMINISTRATION
Awardee UEI
CX4LS5GFCAJ5
Awardee CAGE
6FUC5
Performance District
IA-04
Senators
Charles Grassley
Joni Ernst
Joni Ernst
Modified: 7/22/26