693JF72444073

Project Grant

Overview

Grant Description
Award purpose

The project includes construction of a new approximately 48,000 square foot cross dock warehouse and related site improvements on a roughly 10 acre site.

Activities to be performed

The project consists of the following two components.

Component 1: Engineering design, bidding and construction management, site investigations, geotechnical surveys, topographic surveys.

Engineering design: Preliminary through final design plans and specifications.

Bid document development: Advertising, evaluation and award.

Engineering support during construction: Third party materials testing, HVAC testing and balancing.

Punch list item review and reconciliation.

Project closeout.

Component 2: Cross dock facility construction.

General conditions such as providing and maintaining an office trailer on site, contractors work area security, electric power during construction, site maintenance and dust control.

Bonds and insurance.

Warehouse building: Construct an approximately 48,000 square foot warehouse that will include three chilled storage bays approximately 12,000 square feet each with storage racks, motorized overhead doors for personnel and equipment traverse between the bays with approximately 10 truck docks per chilled bay.

Each truck dock shall be equipped with a motorized overhead door, a dock leveler, a dock seal, a refrigerated container trailer, electrical connection and loading dock signaling.

A workshop office area of approximately 4,000 square feet with men's and women's restrooms, enclosed office spaces for workstations, truck check-in and quality control.

Breakrooms, training rooms, LAN room, forklift charging stations and 2-4 truck docks, each truck dock equipped with a motorized overhead door, dock leveler, a dock seal, a refrigerated container trailer, electrical connection and loading dock signaling.

An agricultural inspection center of approximately 8,000 square feet with men's and women's restrooms, enclosed office spaces for workstations, LAN room, agricultural lab, agricultural disposal room, breakroom, forklift charging stations and 5-6 truck docks, each truck dock equipped with a motorized overhead door, dock leveler, a dock seal, a refrigerated container trailer, electrical connection and loading dock signaling.

Site improvements: Site preparation including grading improvements and drainage, underground storm piping on an approximately 10 acre site.

Additional improvements including irrigation, signage, fencing, paving, sewer and electrical utilities, area lighting, striping for truck circulation and parking improvements.

Deliverables expected outcomes

Performance measure table from Schedule G, page 13 of the grant agreement.

Measure category and description:

Measurement frequency:

Vessel calls: Economic competitiveness and opportunity.

Total vessel calls per year calling to the area defined in the project study area.

Reported in total and disaggregated by any of the following where applicable: vessel type (e.g., CCONTAINER, BULK, RORO, LNG), freight capacity, vessel length or other.

Quarterly.

Cargo volume TEUs: Economic competitiveness and opportunity.

The total number of TEUs moved per year in the area defined by the project study area.

Quarterly.

Intended beneficiary: Port Freeport.

Subrecipient activities: None.
Awardee
Funding Goals
ASSIST IN FUNDING ELIGIBLE PROJECTS FOR THE PURPOSE OF IMPROVING THE SAFETY EFFICIENCY OR RELIABILITY OF THE MOVEMENT OF GOODS THROUGH PORTS AND INTERMODAL CONNECTIONS TO PORTS.
Awarding / Funding Agency
Place of Performance
Freeport, Texas 77541-5520 United States
Geographic Scope
Single Zip Code
Port Freeport was awarded Cross Dock Warehouse Construction for Port Freeport Project Grant 693JF72444073 worth $22,481,425 from Maritime Administration in May 2025 with work to be completed primarily in Freeport Texas United States. The grant has a duration of 4 years 2 months and was awarded through assistance program 20.823 Port Infrastructure Development Program. $8,709,858 (28.0%) of this Project Grant was funded by non-federal sources. The Project Grant was awarded through grant opportunity 2023 Port Infrastructure Development Program Grants.

Status
(Ongoing)

Last Modified 7/24/25

Period of Performance
5/30/25
Start Date
7/30/29
End Date
9.0% Complete

Funding Split
$22.5M
Federal Obligation
$8.7M
Non-Federal Obligation
$31.2M
Total Obligated
72.0% Federal Funding
28.0% Non-Federal Funding

Activity Timeline

Interactive chart of timeline of amendments to 693JF72444073

Additional Detail

Award ID FAIN
693JF72444073
SAI Number
None
Award ID URI
SAI NOT APPLICABLE
Awardee Classifications
State Government
Awarding Office
69A334 MARITIME ADMINISTRATION
Funding Office
69A334 MARITIME ADMINISTRATION
Awardee UEI
X71WK49AGQ69
Awardee CAGE
32BG0
Performance District
TX-14
Senators
John Cornyn
Ted Cruz
Modified: 7/24/25