The project will complete the Pier B on-dock rail support facility program by completing the North Rail Yard expansion and the South Rail Yard expansion.

The North Rail Yard expansion will construct two new mainline tracks, five new approximately 10,000-foot receiving and departure tracks extending from west of the Dominguez Channel to the Pico Avenue rail corridor, and 28 new storage tracks north of the existing Pier B yard.

It also includes active at-grade warning devices and railroad preemption with a new traffic signal at Pier B Street.

The South Rail Yard expansion will add seven new approximately 3,000-foot storage tracks, lengthen and rehabilitate seven existing approximately 3,000-foot storage tracks, construct two new tracks in the Pico Avenue rail corridor, reconfigure tracks near Pier D Street, and construct a new compressed air facility.

Activities to be performed

Element 1: Construction phase architectural and engineering (A and E).

Engineering during construction management, project management, and construction support during bid and award, construction, and closeout.

Element construction: Construct two new mainline tracks, five new approximately 10,000-foot receiving and departure tracks extending from west of the Dominguez Channel to the Pico Avenue rail corridor, 28 new storage tracks north of the existing Pier B yard, construct the roadway knuckle at Harbor Avenue and 11th Street, reconstruct the existing Pier B rail yard by adding seven new approximately 3,000-foot storage tracks, and lengthen and rehabilitate seven existing approximately 3,000-foot storage tracks.

Construct two new tracks in the Pico Avenue rail corridor, reconfigure Mead Yard ladder and lead track across Anaheim Way, and add active at-grade warning devices and railroad preemption with a new traffic signal at Pier B Street.

Reconfigure tracks near Pier D Street and construct a new compressed air facility with associated piping within the rail yard.

Approximate total project quantities include 175,000 feet of new track, 150 new items of special track work, and 150 remotely controlled power switch operators.

Deliverables

Expected outcomes from page 10, schedule G of the grant agreement intended beneficiary: City of Long Beach.

Subrecipient activities: None.

Measure: Freight movements.

Projected outcome: An increase in the total number of containers moved by on-dock rail.

Category and description: Economic competitiveness, a table that shows the total number of containers and the total number of containers moved by on-dock rail in the study area.

Measurement frequency: Annual.

Measure: Gross tons.

Projected outcome: An increase in cargo tonnage moved through marine terminals.

Category and description: Economic competitiveness, the total number of gross short tons that moved through the study area.

Measurement frequency: Annual.
Funding Goals
THE PROGRAM WILL PROVIDE GRANTS ON A COMPETITIVE BASIS TO SUPPORT MULTIJURISDICTIONAL OR REGIONAL PROJECTS OF SIGNIFICANCE THAT MAY ALSO CUT ACROSS MULTIPLE MODES OF TRANSPORTATION.
Awarding / Funding Agency
Place of Performance
Long Beach, California 90802-4511 United States
Geographic Scope
Single Zip Code
Related Opportunity
NIPA2324MEGA
City Of Long Beach was awarded Pier B On-Dock Rail Support Facility Expansion Project Project Grant 693JF72440006 worth $283,375,812 from Maritime Administration in June 2026 with work to be completed primarily in Long Beach California United States. The grant has a duration of 7 years 6 months and was awarded through assistance program 20.937 National Infrastructure Project Assistance (Mega Projects). $188,917,209 (40.0%) of this Project Grant was funded by non-federal sources.

Status
(Ongoing)

Last Modified 6/3/26

Period of Performance
6/2/26
Start Date
12/19/33
End Date
5.0% Complete

Funding Split
$283.4M
Federal Obligation
$188.9M
Non-Federal Obligation
$472.3M
Total Obligated
60.0% Federal Funding
40.0% Non-Federal Funding

Activity Timeline

Interactive chart of timeline of amendments to 693JF72440006

Additional Detail

Award ID FAIN
693JF72440006
SAI Number
None
Award ID URI
SAI NOT APPLICABLE
Awardee Classifications
State Government
Awarding Office
69A334 MARITIME ADMINISTRATION
Funding Office
69A334 MARITIME ADMINISTRATION
Awardee UEI
DBSHZ2LVFAE6
Awardee CAGE
3KGZ9
Performance District
CA-42
Senators
Dianne Feinstein
Alejandro Padilla
Modified: 6/3/26