693JF72344019
Project Grant
Overview
Grant Description
AWARD PURPOSE THE PROJECT FUNDS THE CONSTRUCTION OF AN EXPANDED PORT INLET AND A CONCRETE BARGE RAMP THAT WILL IMPROVE THE THROUGHPUT OF THE PORT BY PROVIDING ADDITIONAL WATERFRONT ACCESS FOR LOADING AND UNLOADING BULK COMMODITIES. THE NEW RAMP AT THE END OF THE INLET WILL ALLOW THE PORT TO SAFELY HANDLE EXTREMELY HEAVY CARGO. ACTIVITIES TO BE PERFORMED THE PROJECT WILL BE COMPLETED UNDER THE FOLLOWING COMPONENTS COMPONENT 1 PROFESSIONAL SERVICES THIS COMPONENT INCLUDES PROJECT MANAGEMENT AND ENGINEERINGRELATED ACTIVITIES. COMPONENT 2 CONSTRUCTION IN-WATER CONSTRUCTION WORK INCLUDING DREDGING AND ROCK BLASTING THE PROPOSED 300 BY 110 INLET TO THE DESIGN DEPTHS OF 30 AND 41. LANDSIDE CONSTRUCTION WORK INCLUDING CLEARING AND GRUBBING DRIVING OF SHEET PILING TO REINFORCE THE STEEP INLET SLOPES AND CONCRETE SLAB WORK INCLUDING BEHIND THE SHEET PILE WALL AND THE 110 WIDE AND 18 THICK RAMP AT THE END OF THE INLET. DELIVERABLES EXPECTED OUTCOMES PERFORMANCE MEASURE TABLE FROM SCHEDULE G PAGE 10 OF THE GRANT AGREEMENT MEASURE CATEGORY AND DESCRIPTION TOTAL TONS OF CARGO MOVED PER YEAR TEUS OR SHORT TONS CARGO VOLUME MEASURES THE MOVEMENT OF FREIGHT THROUGH THE PROJECT STUDY AREA. WHEN APPLICABLE REPORT THE TOTAL CARGO VOLUME AND THE VOLUME DISAGGREGATED BY TYPE OF FREIGHT IE CONTAINERS IN TEU AND BULK IN TONS OR TYPE OF INTERMODAL TRANSPORT TRUCK OR RAIL.CARGO VOLUME MEASUREMENT FREQUENCY QUARTERLY. MEASURE VESSEL CALLS CATEGORY AND DESCRIPTION TOTAL VESSEL CALLS PER YEAR MEASURES THE NUMBER OF VESSELS CALLING TO THE PROJECT STUDY AREA. MUST BE REPORTED IN TOTAL AND DISAGGREGATED BY ANY OF THE FOLLOWING WHERE APPLICABLE VESSEL TYPE EG CONTAINER BULK RO RO LNG FREIGHT CAPACITY VESSEL LENGTH OR OTHER. MEASUREMENT FREQUENCY QUARTERLY. INTENDED BENEFICIARY EDDYVILLE RIVERPORT AND INDUSTRIAL DEVELOPMENT AUTHORITY. SUBRECIPIENT ACTIVITIES NONE.
Funding Goals
ASSIST IN FUNDING ELIGIBLE PROJECTS FOR THE PURPOSE OF IMPROVING THE SAFETY EFFICIENCY OR RELIABILITY OF THE MOVEMENT OF GOODS THROUGH PORTS AND INTERMODAL CONNECTIONS TO PORTS.
Grant Program (CFDA)
Awarding / Funding Agency
Place of Performance
Eddyville,
Kentucky
42038-7337
United States
Geographic Scope
Single Zip Code
Related Opportunity
Eddyville Riverport And Industrial Development Authority was awarded
Port Expansion : Enhancing Waterfront Access Bulk Cargo Handling
Project Grant 693JF72344019
worth $4,912,631
from Maritime Administration in October 2025 with work to be completed primarily in Eddyville Kentucky United States.
The grant
has a duration of 2 years 5 months and
was awarded through assistance program 20.823 Port Infrastructure Development Program.
$1,228,158 (20.0%) of this Project Grant was funded by non-federal sources.
The Project Grant was awarded through grant opportunity 2022 Port Infrastructure Development Program Grants.
Status
(Ongoing)
Last Modified 10/30/25
Period of Performance
10/30/25
Start Date
3/30/28
End Date
Funding Split
$4.9M
Federal Obligation
$1.2M
Non-Federal Obligation
$6.1M
Total Obligated
Activity Timeline
Additional Detail
Award ID FAIN
693JF72344019
SAI Number
None
Award ID URI
SAI NOT APPLICABLE
Awardee Classifications
State Government
Awarding Office
69A334 MARITIME ADMINISTRATION
Funding Office
69A334 MARITIME ADMINISTRATION
Awardee UEI
TR91X2DUCHE9
Awardee CAGE
87TC0
Performance District
KY-01
Senators
Mitch McConnell
Rand Paul
Rand Paul
Modified: 10/30/25