AWARD PURPOSE THE PROJECT CONSISTS OF REPAIRING AND OR REPLACING PAVEMENT IN APPROXIMATELY 13 ACRES OF CARGO HANDLING AREA CONSTRUCTING A NEW MAINTENANCE FACILITY AND MAKING STRUCTURAL REPAIRS TO CARGO BERTH ONE TO SUPPORT INCREASED USE OF AN EXISTING MOBILE HARBOR CRANE. THE PROJECT ALSO INCLUDES AN UPDATED FACILITY CONDITION ASSESSMENT AND FINAL DESIGN AND ENGINEERING WORK. ACTIVITIES TO BE PERFORMED THE PROJECT WILL CONSIST OF THE FOLLOWING COMPONENTS COMPONENT 1 ENGINEERING AND DESIGN ENVIRONMENTAL PERMITTING AND CONSTRUCTION MANAGEMENT ENGINEERING AND DESIGN THE SCOPE OF WORK UNDER ENGINEERING AND DESIGN FOCUSES ON TRANSLATING PROJECT REQUIREMENTS INTO DETAILED TECHNICAL PLANS AND SPECIFICATIONS. PRELIMINARY DESIGN SITE ASSESSMENTS AND FEASIBILITY STUDIES CONCEPTUAL DRAWINGS AND DESIGN ALTERNATIVES COST ESTIMATES AND RISK ASSESSMENTS DETAILED DESIGN CIVIL STRUCTURAL MECHANICAL AND ELECTRICAL ENGINEERING PLANS CONSTRUCTION DRAWINGS AND SPECIFICATIONS TECHNICAL CALCULATIONS AND MODELING EG STRUCTURAL INTEGRITY FLUID DYNAMICS COORDINATION INTEGRATION OF ARCHITECTURAL AND SPECIALTY CONSULTANT INPUTS DESIGN REVIEWS AND VALUE ENGINEERING COORDINATION WITH REGULATORY REQUIREMENTS AND CODES DELIVERABLES DESIGN REPORTS CONSTRUCTION DOCUMENTS AND CAD FILES BILL OF QUANTITIES AND TECHNICAL SPECIFICATIONS ENVIRONMENTAL PERMITTING THE FOLLOWING SCOPE OF WORK UNDER ENVIRONMENTAL PERMITTING FOCUSES ON ENSURING THAT THE PROJECT COMPLIES WITH ALL REMAINING STATE AND LOCAL ENVIRONMENTAL LAWS AND REGULATIONS BEFORE AND DURING CONSTRUCTION WHICH INCLUDES PERMITTING STRATEGY REFINING STRATEGIES TO COMPLETE APPLICABLE STATE AND LOCAL ENVIRONMENTAL PERMITS DEVELOPING A PERMITTING SCHEDULE AND SUBMISSION STRATEGY PERMITTING AND AGENCY COORDINATION PREPARING AND SUBMITTING STATE AND LOCAL PERMIT APPLICATIONS RESPONDING TO REGULATORY AGENCY FEEDBACK AND REQUESTS FOR INFORMATION PARTICIPATING IN PUBLIC HEARINGS OR COMMENT PROCESSES COMPLIANCE PLANNING TO SUPPORT CONSTRUCTION DEVELOPMENT OF ENVIRONMENTAL MANAGEMENT PLANS EMP AND SIMILAR DOCUMENTATION TO SUPPORT LOCAL AND STATE PERMITTING CONSTRUCTION MANAGEMENT THE SCOPE OF WORK UNDER CONSTRUCTION MANAGEMENT INVOLVES OVERSEEING AND COORDINATING THE PHYSICAL CONSTRUCTION OF THE PROJECT TO ENSURE IT MEETS DESIGN BUDGET AND SCHEDULE REQUIREMENTS. COMPONENT 2 PROJECT MANAGEMENT THE SCOPE OF WORK UNDER PROJECT MANAGEMENT INCLUDES PROJECT PLANNING AND DEFINITION PROCUREMENT AND CONTRACT ADMINISTRATION SCHEDULE SCOPE AND BUDGET MANAGEMENT DESIGN OVERSIGHT AND COORDINATION CONSTRUCTION OVERSIGHT RISK ISSUE AND STAKEHOLDER MANAGEMENT PROJECT REPORTING AND COMMUNICATION AND PROJECT CLOSEOUT AND TURNOVER. COMPONENT 3 TERMINAL PAVEMENT REPAIR AND REPLACEMENT AREA A AND AREA B PAVEMENT REPAIR APPROXIMATELY 4 8 ACRES OF EXISTING MARINE TERMINAL ARE PROPOSED FOR PAVEMENT REPAIR. THE PAVEMENT REPAIR AREA INCLUDES THE RECIPIENTS INNER TERMINAL ROAD SEPARATING THE LOG LAYDOWN SORTING YARD AND THEIR EXISTING WAREHOUSE. IT ALSO INCLUDES THREE CROSSROAD PATHS THAT CONNECT THE EAST AND WEST LOG HANDLING AND STORAGE YARDS. PAVEMENT REPLACEMENT APPROXIMATELY 8 4 ACRES OF EXISTING MARINE TERMINAL ARE PROPOSED FOR PAVEMENT REPLACEMENT. THIS AREA INCLUDES THE LOG HANDLING YARD WHERE HEAVIER ON TERMINAL TRUCK AND EQUIPMENT TRAFFIC IS EXPERIENCED DURING OPERATIONS. COMPONENT 4 BERTH 1 WHARF REPAIR AREA C BASED ON PAST INSPECTIONS APPROXIMATELY 22 PILES AND 17 PILE CAPS OF THE WHARF AT BERTH 1 REQUIRE THE FOLLOWING REPAIRS REPAIR CRACKS AND SPALLS ON THE LOWER EDGES OF APPROXIMATELY 17 CONCRETE PILE CAPS IMMEDIATELY BENEATH THE WHARF DECKING REPAIR CRACKS AND SPALLS ON THE TOP THREE FEET OF APPROXIMATELY 22 CONCRETE PILES AND REPLACE INDIVIDUAL CORRODED REINFORCING STEEL AS NEEDED. COMPONENT 5 MAINTENANCE FACILITY REPLACEMENT THE REPLACED MAINTENANCE FACILITY WILL BE A SINGLE STORY STRUCTURE UP TO A MAXIMUM HEIGHT OF ABOUT 25 TO 30 FEET(IN COMPLIANCE WITH LOCAL MUNICIPAL PERMITS AND SUFFICIENT TO ACCOMMODATE THE LARGEST DIMENSION OF ANY EQUIPMENT CURRENTLY USED IN THE TERMINAL. THE REPLACEMENT MAINTENANCE FACILITY WILL HAVE A SIMILAR LAYOUT AS THE OLD MAINTENANCE FACILITY WITH A SURFACE AREA OF UP TO ABOUT 7000 SQUARE FEET AND WILL BE LOCATED NEAR THE RECIPIENTS FORMER ADMINISTRATION BUILDING. THE COMPLETED REPLACEMENT MAINTENANCE FACILITY WILL INCLUDE MULTIPLE LARGE DOORS SUFFICIENT TO ACCOMMODATE THE LARGEST DIMENSION OF ANY EQUIPMENT CURRENTLY USED IN THE TERMINAL A HYDRAULIC PRESS AT LEAST ONE 20 TON OVERHEAD GANTRY FOR ONE BAY AND WILL OTHERWISE BE ABLE TO ACCOMMODATE THE PORTS MAINTENANCE ACTIVITIES AND ASSOCIATED STORAGE NEEDS. NECESSARY UTILITIES SUCH AS WATER SEWER AND ELECTRICAL WILL BE CONNECTED TO THE RECIPIENTS EXISTING UTILITY INFRASTRUCTURE SOME MINOR SHALLOW TRENCHING IS ANTICIPATED. THE CONSTRUCTION OF THE REPLACEMENT MAINTENANCE FACILITY WILL CONSIST OF AN INDUSTRIAL TILT UP PREFABRICATED OR MODULAR STRUCTURE COMPOSED OF STEEL FRAMING METAL ROOFING AND SIDING. THE FACILITY WILL BE SUPPORTED BY A CONCRETE SLAB ON BEAMS FOUNDATION AND IF SOIL LIQUEFACTION IS DETERMINED TO BE A CONCERN PILES WILL BE DRIVEN UP TO A DEPTH OF ABOUT 30 FT. THE REPLACEMENT MAINTENANCE FACILITY WILL BE ELEVATED BY APPROXIMATELY ONE FOOT TO ADDRESS SEA LEVEL RISE SLR AND CORRESPOND WITH LOCAL MUNICIPAL AND PORT SLR PLAN RECOMMENDATIONS. COMPONENT 6 RENOVATION OF FORMER ADMINISTRATION BUILDING THE FORMER ADMINISTRATION BUILDING WILL BE REHABILITATED AND BROUGHT UP TO MUNICIPAL AND STATE BUILDING CODES. COMPONENT 7 DEMOLITION OF EXISTING MAINTENANCE FACILITY THE EXISTING FACILITY WILL BE DEMOLISHED AND ANY EXPOSED EARTH WILL BE CAPPED WITH ASPHALT. DELIVERABLES EXPECTED OUTCOMES PERFORMANCE MEASURE TABLE FROM SCHEDULE G PAGE 15 OF THE GRANT AGREEMENT MEASURE GROSS TONS. CATEGORY AND DESCRIPTION THE MOVEMENT OF GROSS TONNAGE OF FREIGHT IN THE AREA DEFINED BY THE PROJECT STUDY AREA. SECONDARY VARIABLES TYPES OF FREIGHT TYPES OF INTERMODAL TRANSPORT. MEASUREMENT FREQUENCY QUARTERLY. MEASURE VESSEL TURN TIME . CATEGORY AND DESCRIPTION THE TIME BETWEEN A VESSEL FIRST REPORTING AT THE PORT TO THE TIME IT DEPARTS INCLUDING BERTH WAITING TIME AND SERVICING TIME.. MEASUREMENT FREQUENCY QUARTERLY. INTENDED BENEFICIARY PORT OF OLYMPIA. SUBRECIPIENT ACTIVITIES NONE.
Awardee
Funding Goals
ASSIST IN FUNDING ELIGIBLE PROJECTS FOR THE PURPOSE OF IMPROVING THE SAFETY EFFICIENCY OR RELIABILITY OF THE MOVEMENT OF GOODS THROUGH PORTS AND INTERMODAL CONNECTIONS TO PORTS.
Grant Program (CFDA)
Awarding / Funding Agency
Place of Performance
Olympia,
Washington
98501-9001
United States
Geographic Scope
Single Zip Code
Related Opportunity
Port Of Olympia was awarded
Marine Terminal Infrastructure Enhancement Grant
Project Grant 693JF72344003
worth $9,270,918
from Maritime Administration in December 2025 with work to be completed primarily in Olympia Washington United States.
The grant
has a duration of 5 years and
was awarded through assistance program 20.823 Port Infrastructure Development Program.
$3,090,306 (25.0%) of this Project Grant was funded by non-federal sources.
The Project Grant was awarded through grant opportunity 2022 Port Infrastructure Development Program Grants.
Status
(Ongoing)
Last Modified 1/8/26
Period of Performance
12/23/25
Start Date
12/31/30
End Date
Funding Split
$9.3M
Federal Obligation
$3.1M
Non-Federal Obligation
$12.4M
Total Obligated
Activity Timeline
Additional Detail
Award ID FAIN
693JF72344003
SAI Number
None
Award ID URI
SAI NOT APPLICABLE
Awardee Classifications
State Government
Awarding Office
69A334 MARITIME ADMINISTRATION
Funding Office
69A334 MARITIME ADMINISTRATION
Awardee UEI
FNSGJ46UJ4P3
Awardee CAGE
0ZQK1
Performance District
WA-10
Senators
Maria Cantwell
Patty Murray
Patty Murray
Modified: 1/8/26