AWARD PURPOSE THE PROJECT WILL CONSTRUCT AN APPROXIMATELY 16 5 ACRE CONTAINER YARD, INSTALL ELECTRICAL SYSTEMS FOR TWO PREVIOUSLY ACQUIRED MOBILE HARBOR CRANES CONSTRUCT AN ACCESS ROAD AND CONSTRUCT FOUNDATIONS AND UTILITIES FOR THE INSTALLATION OF APPROXIMATELY THREE RADIATION PORTAL MONITORS RPMS. ACTIVITIES TO BE PERFORMED THE PROJECT WILL BE COMPLETED IN FOUR COMPONENTS COMPONENT 1 CONTAINER YARD ENGINEERING AND DESIGN PERMITTING ENVIRONMENTAL AND CONSTRUCTION MANAGEMENT. ENVIRONMENTAL ASSESSMENT TO COMPLETE NATIONAL ENVIRONMENTAL POLICY ACT NEPA PAPERWORK PROCESS. PERMITTING AND MITIGATION PLAN DEVELOPMENT EG 30 60 90 100 PERCENT AND AS BUILTS FOR THE CONTAINER YARD CRANE ELECTRIFICATION INFRASTRUCTURE AND ACCESS ROAD CONSTRUCTION MANAGEMENT ENGINEERING SUPPORT DURING CONSTRUCTION FOR THE CONTAINER YARD CRANE ELECTRIFICATION INFRASTRUCTURE AND ACCESS ROAD PUNCH LIST ITEM RESOLUTION CONSTRUCTION ENGINEERING AND INSPECTION CEI COMPONENT 2 RPM ENGINEERING AND DESIGN PERMITTING ENVIRONMENTAL AND CONSTRUCTION MANAGEMENT. PLAN DEVELOPMENT EG 30 60 90 100 PERCENT AND AS BUILTS FOR RPM FOUNDATION CONSTRUCTION ELEMENTS IN COORDINATION WITH DEPARTMENT OF HOMELAND SECURITY DHS TO ENSURE RPM STANDARDS ARE MET PERMITTING AND MITIGATION CONSTRUCTION MANAGEMENT ENGINEERING SUPPORT FOR THE RPM FOUNDATIONS PUNCH LIST ITEM RESOLUTION CONSTRUCTION ENGINEERING AND INSPECTION CEI. COMPONENT 3 STORMWATER AND WETLANDS MITIGATION. MITIGATION OF STORMWATER VIA PURCHASE OF OFFSITE TREATMENT CREDITS MITIGATION OF ESTUARINE FORESTED WETLANDS VIA PURCHASE OF WETLANDS CREDITS COMPONENT 4 CONSTRUCTION ELEMENT 1 CONTAINER YARD CONSTRUCTION. CIVIL CONSTRUCTION OF APPROXIMATELY 16 56 ACRES OF CONTAINER YARD; ELEMENTS INCLUDE ASPHALT PAVING ACTIVITIES BOLLARDS AND JERSEY BARRIERS I E EQUIPMENT PROTECTION COMPACTION CONCRETE CONSTRUCTION INSPECTION SERVICES CONSTRUCTION MANAGEMENT SERVICES CONSTRUCTION SERVICES DEMOBILIZATION DEMOLITION DRAINAGE SYSTEMS EARTHWORK ELECTRICAL SYSTEM COMPONENTS ENGINEERING SERVICES FENCING FIRE PROTECTION SYSTEM COMPONENTS FORM WORK GUARDRAILS GEOTECHNICAL SERVICES GRADING AND SITE WORK GROUND COVERING HORIZONTAL BORING LIGHTS AND LIGHTING SYSTEM COMPONENTS MOBILIZATION OPERATOR PARKING AREAS POLES TOWERS AND BRACKETS E G CAMERAS LIGHTS PRECONSTRUCTION ENGINEERING AND DESIGN REBAR INSTALLATION SIGNAGE AND WAYFINDING SLOPE STABILIZATION SOIL MANAGEMENT WORK E G SURCHARGING STORMWATER SYSTEM COMPONENTS STRIPING OF PARKING ROADWAY OR STORAGE AREAS STRUCTURAL BASE MATERIAL SURVEYING TELECOMMUNICATIONS E G OPTICAL FIBER RUNS TEMPORARY STRUCTURES AND UTILITIES E G POTABLE WATER SEWER. ELEMENT 2 CRANE ELECTRIFICATION INFRASTRUCTURE. CIVIL CONSTRUCTION ACTIVITIES FOR TWO MOBILE HARBOR CRANES ELECTRICAL SYSTEMS ELEMENTS INCLUDE INSTALL NEW TRANSFORMERS E G 4KV 4160V AND RUN CONDUCTORS TO AT LEAST FOUR 4 RECEPTACLES ALONG THE DOCK. INSTALL CABLE PROTECTION SYSTEMS CONDUCTORS LANDSIDE BACKUP POWER SUPPLIES PEDESTALS PITS RECEPTACLES TRANSFORMERS AND COMPONENTS AND TRENCHING. ELEMENT 3 ACCESS ROAD TO YARD. CIVIL CONSTRUCTION ELEMENTS INCLUDE CONSTRUCT AN ANGLED ACCESS ROAD APPROXIMATELY 170 175 FEET LONG BY 100 FEET WIDE CROSSING OVER A STORMWATER DITCH TO IMPROVE ACCESS TO THE YARD AND PROMOTE EFFICIENCIES IN INTERNAL FLOW. INSTALL CULVERTS GUARDRAILS PRECAST CONCRETE AND SIGNAGE. RELOCATE ELECTRIC UTILITIES CONDUCT SLOPE STABILIZATION ROADWAY STRIPING ELEMENT 4 RPM FOUNDATIONS. CIVIL CONSTRUCTION ELEMENTS INCLUDE CONSTRUCT RPM FOUNDATIONS CONSTRUCT FOUR LANES TWO BYPASS LANES DESIGNED TO HANDLE RPMS IN THE FUTURE IF WARRANTED AND TWO LANES WITH RPMS INSTALLED. THE RPM LANES WILL BE APPROXIMATELY 125 FEET LONG. GRADING AND SITE WORK. ASPHALT PAVING ACTIVITIES. CONCRETE PAVING ACTIVITIES. INSTALL BACKUP POWER SUPPLIES BOLLARDS AND JERSEY BARRIERS CONDUITS GATE ARM COMPONENTS AND SYSTEMS INTERCOM COMPONENTS AND SYSTEMS INSTALLATION AND TESTING; INSTALLATION OF GOVERNMENT FURNISHED EQUIPMENT OUTDOOR EQUIPMENT RACKS AND CABINETS SIGNAGE TELECOMMUNICATIONS E G OPTICAL FIBER RUNS AND TRAFFIC LIGHTS. ROADWAY STRIPING DELIVERABLES EXPECTED OUTCOMES THERE ARE NO PERFORMANCE MEASURES FOR INFRA GRANTS. INTENDED BENEFICIARY. MANATEE COUNTY PORT AUTHORITY. SUBRECIPIENT ACTIVITIES NONE.
Awardee
Funding Goals
THE PROGRAM SUPPORTS MULTIMODAL FREIGHT AND HIGHWAY PROJECTS OF NATIONAL OR REGIONAL SIGNIFICANCE TO IMPROVE THE SAFETY EFFICIENCY AND RELIABILITY OF THE MOVEMENT OF FREIGHT AND PEOPLE IN AND ACROSS RURAL AND URBAN AREAS.
Grant Program (CFDA)
Awarding / Funding Agency
Place of Performance
Palmetto,
Florida
34221-6603
United States
Geographic Scope
Single Zip Code
Related Opportunity
Manatee County Port Authority was awarded
Container Yard Construction and Crane Electrification Grant
Project Grant 693JF72340014
worth $11,953,492
from Maritime Administration in August 2025 with work to be completed primarily in Palmetto Florida United States.
The grant
has a duration of 3 years 2 months and
was awarded through assistance program 20.823 Port Infrastructure Development Program.
$7,968,995 (40.0%) of this Project Grant was funded by non-federal sources.
The Project Grant was awarded through grant opportunity INFRA Grants.
Status
(Ongoing)
Last Modified 9/4/25
Period of Performance
8/28/25
Start Date
10/31/28
End Date
Funding Split
$12.0M
Federal Obligation
$8.0M
Non-Federal Obligation
$19.9M
Total Obligated
Activity Timeline
Additional Detail
Award ID FAIN
693JF72340014
SAI Number
None
Award ID URI
SAI NOT APPLICABLE
Awardee Classifications
State Government
Awarding Office
69A334 MARITIME ADMINISTRATION
Funding Office
69A334 MARITIME ADMINISTRATION
Awardee UEI
KLBXGVB8Q2L3
Awardee CAGE
32XQ7
Performance District
FL-16
Senators
Marco Rubio
Rick Scott
Rick Scott