Award Purpose: This project will construct a new rail storage yard to support the existing operations at the port facility. The project would add approximately 130 additional storage spaces, construct two sets of storage tracks, and a new rail siding. These additional spaces are expected to increase the recipient's storage capacity by 25 percent so that it can safely manage the current storage operations and meet the current repressed storage demand.
Activities to be Performed: The project will add 130 additional storage spaces by constructing two sets of storage tracks and a rail siding. This project is made up of the following two components.
Component 1: Design and project administration of Port Bienville Rail Storage Yard. Completion of preliminary studies and surveys: topographic survey, geotechnical investigation, jurisdictional determination, wetlands delineation, cultural resources survey, threatened and endangered species survey, hazards and toxics survey, preliminary design (30 percent), other environmental tasks, USACE 404 permit and environmental assessment, opinion of probable construction costs, and final design (60 percent, 90 percent, 100 percent). Preparation of construction drawings, contract document, and technical specifications to be used for procurement. Assistance with procurement and contract award.
Component 2: Construction of rail storage yard. Engineer to provide construction administration and resident project representation throughout construction of the project. Final inspection activities, assist with contractor's completion of punch list items, and assist with closeout at the conclusion of construction. Installation of approximately 13,800 linear feet of additional track, nine turnouts, roughly 8,263 steel or timber ties, and approximately 12,168 tons of ballast.
Deliverables within Economic Competitiveness: Freight movements (number of TEU, railcar, truck movements over project study area), cargo storage (total cargo storage for project study area).
Intended Beneficiary: Hancock County Port and Harbor Commission.
Subrecipients: None.
Activities to be Performed: The project will add 130 additional storage spaces by constructing two sets of storage tracks and a rail siding. This project is made up of the following two components.
Component 1: Design and project administration of Port Bienville Rail Storage Yard. Completion of preliminary studies and surveys: topographic survey, geotechnical investigation, jurisdictional determination, wetlands delineation, cultural resources survey, threatened and endangered species survey, hazards and toxics survey, preliminary design (30 percent), other environmental tasks, USACE 404 permit and environmental assessment, opinion of probable construction costs, and final design (60 percent, 90 percent, 100 percent). Preparation of construction drawings, contract document, and technical specifications to be used for procurement. Assistance with procurement and contract award.
Component 2: Construction of rail storage yard. Engineer to provide construction administration and resident project representation throughout construction of the project. Final inspection activities, assist with contractor's completion of punch list items, and assist with closeout at the conclusion of construction. Installation of approximately 13,800 linear feet of additional track, nine turnouts, roughly 8,263 steel or timber ties, and approximately 12,168 tons of ballast.
Deliverables within Economic Competitiveness: Freight movements (number of TEU, railcar, truck movements over project study area), cargo storage (total cargo storage for project study area).
Intended Beneficiary: Hancock County Port and Harbor Commission.
Subrecipients: None.
Funding Goals
THE PIDP 2021 GRANT PROGRAMS SUPPORTS PROJECT THAT IMPROVE THE SAFETY EFFICIENCY OR RELIABILITY OF THE MOVEMENT OF GOODS INTO OUT OF AROUND, OR WITHIN COASTAL SEAPORTS INLAND RIVER PORTS OR GREAT LAKES PORTS.
Grant Program (CFDA)
Awarding / Funding Agency
Place of Performance
Kiln,
Mississippi
39556-8027
United States
Geographic Scope
Single Zip Code
Related Opportunity
Hancock County Port & Harbor Commission was awarded
Rail Storage Yard Expansion for Hancock County Port
Project Grant 693JF72245014
worth $4,140,000
from Maritime Administration in August 2023 with work to be completed primarily in Kiln Mississippi United States.
The grant
has a duration of 5 years 5 months and
was awarded through assistance program 20.823 Port Infrastructure Development Program.
$2,857,982 (41.0%) of this Project Grant was funded by non-federal sources.
The Project Grant was awarded through grant opportunity 2021 Port Infrastructure Development Grants.
Status
(Ongoing)
Last Modified 10/17/25
Period of Performance
8/22/23
Start Date
1/1/29
End Date
Funding Split
$4.1M
Federal Obligation
$2.9M
Non-Federal Obligation
$7.0M
Total Obligated
Activity Timeline
Transaction History
Modifications to 693JF72245014
Additional Detail
Award ID FAIN
693JF72245014
SAI Number
None
Award ID URI
SAI NOT APPLICABLE
Awardee Classifications
State Government
Awarding Office
69A334 MARITIME ADMINISTRATION
Funding Office
69A334 MARITIME ADMINISTRATION
Awardee UEI
WSA6Z8GF3Q26
Awardee CAGE
500J8
Performance District
MS-04
Senators
Roger Wicker
Cindy Hyde-Smith
Cindy Hyde-Smith
Budget Funding
| Federal Account | Budget Subfunction | Object Class | Total | Percentage |
|---|---|---|---|---|
| Port Infrastructure Development Program, Maritime Administration, Transportation (069-1713) | Water transportation | Grants, subsidies, and contributions (41.0) | $4,140,000 | 100% |
Modified: 10/17/25