1. The project will improve the State Route 47 (SR 47) Vincent Thomas Bridge Harbor Boulevard Front Street interchange near the Port of Los Angeles. The improvements include the removal of the existing westbound off-ramp with Harbor Boulevard to eliminate an unsafe weave, the construction of a new westbound off-ramp with Front Street with a new traffic signal, the realignment of the eastbound on-ramp from Harbor Boulevard to increase merge length and reduce grade, the conversion of the eastbound off-ramp auxiliary lane from I-110 connector and Gaffey Street to two lanes, and the removal of an obsolete rail spur.
2. Activities to be performed:
Component 1: Construction Utilities
- Removal of conflicting utilities
- Rail removal
- Water and gas line relocation
- Drainage improvements, including modifications to the existing storm drain system
- Sewer system improvements
- Electrical system improvements
Site Work
- Earthwork, including soil remediation and soil surcharge
- Partial demolition of the existing on and off-ramps to construct new ramp alignments
- Grading, paving, and striping
- Roadway realignment, including sidewalk, curb, and gutter improvements
- Traffic signal and street lighting improvements
- Retaining walls and architectural wall treatment
- Fencing
- Landscaping and irrigation
- Rail removal
Component 2: Construction Management
- The construction management charges include the construction management contract for administrative support and staff charges for inspection, construction management support, and design services during construction.
3. Deliverables and expected outcomes:
- Travel time savings within the category of economic competitiveness
- Accident reduction within the category of safety
4. Intended beneficiary: City of Los Angeles Harbor Department
5. Subrecipient activities: None.
2. Activities to be performed:
Component 1: Construction Utilities
- Removal of conflicting utilities
- Rail removal
- Water and gas line relocation
- Drainage improvements, including modifications to the existing storm drain system
- Sewer system improvements
- Electrical system improvements
Site Work
- Earthwork, including soil remediation and soil surcharge
- Partial demolition of the existing on and off-ramps to construct new ramp alignments
- Grading, paving, and striping
- Roadway realignment, including sidewalk, curb, and gutter improvements
- Traffic signal and street lighting improvements
- Retaining walls and architectural wall treatment
- Fencing
- Landscaping and irrigation
- Rail removal
Component 2: Construction Management
- The construction management charges include the construction management contract for administrative support and staff charges for inspection, construction management support, and design services during construction.
3. Deliverables and expected outcomes:
- Travel time savings within the category of economic competitiveness
- Accident reduction within the category of safety
4. Intended beneficiary: City of Los Angeles Harbor Department
5. Subrecipient activities: None.
Awardee
Grant Program (CFDA)
Awarding / Funding Agency
Place of Performance
San Pedro,
California
90731-3309
United States
Geographic Scope
Single Zip Code
Related Opportunity
None
City Of Los Angeles was awarded
Improvements to SR 47 Vincent Thomas Bridge Interchange
Project Grant 693JF72140002
worth $9,880,000
from Maritime Administration in May 2023 with work to be completed primarily in San Pedro California United States.
The grant
has a duration of 7 years 3 months and
was awarded through assistance program 20.823 Port Infrastructure Development Program.
$83,363,000 (89.0%) of this Project Grant was funded by non-federal sources.
Status
(Ongoing)
Last Modified 6/6/23
Period of Performance
5/24/23
Start Date
8/31/30
End Date
Funding Split
$9.9M
Federal Obligation
$83.4M
Non-Federal Obligation
$93.2M
Total Obligated
Activity Timeline
Additional Detail
Award ID FAIN
693JF72140002
SAI Number
None
Award ID URI
SAI NOT APPLICABLE
Awardee Classifications
State Government
Awarding Office
69A334 MARITIME ADMINISTRATION
Funding Office
69A334 MARITIME ADMINISTRATION
Awardee UEI
TYUJZWJ8N568
Awardee CAGE
4GJK6
Performance District
44
Senators
Dianne Feinstein
Alejandro Padilla
Alejandro Padilla
Representative
Nanette Barragán
Budget Funding
| Federal Account | Budget Subfunction | Object Class | Total | Percentage |
|---|---|---|---|---|
| Port Infrastructure Development Program, Maritime Administration, Transportation (069-1713) | Water transportation | Grants, subsidies, and contributions (41.0) | $9,880,000 | 100% |
Modified: 6/6/23