Purpose: Remove taxiway; rehabilitate taxiway; rehabilitate runway.
Activities to be performed/expected outcomes: This project rehabilitates 10,083 feet of the existing Runway 15R/33L to maintain the structural integrity of the pavement and to minimize foreign object debris.
This project rehabilitates 430 feet of the existing Taxiway M pavement that requires rehabilitation to ensure safe airfield operations.
This project rehabilitates 562 feet of the existing Taxiway N pavement that requires rehabilitation to ensure safe airfield operations.
This project rehabilitates 845 feet of the existing Taxiway T pavement that requires rehabilitation to ensure safe airfield operations.
This project removes 408 feet of Taxiway F from the airfield for geometric improvements identified in the airport's Runway Incursion Mitigation Plan.
This project removes 449 feet of Taxiway Q from the airfield for geometric improvements identified in the airport's Runway Incursion Mitigation Plan.
Intended beneficiary: This grant will provide federal funding for airports associated with Boston, Massachusetts.
Activities to be performed/expected outcomes: This project rehabilitates 10,083 feet of the existing Runway 15R/33L to maintain the structural integrity of the pavement and to minimize foreign object debris.
This project rehabilitates 430 feet of the existing Taxiway M pavement that requires rehabilitation to ensure safe airfield operations.
This project rehabilitates 562 feet of the existing Taxiway N pavement that requires rehabilitation to ensure safe airfield operations.
This project rehabilitates 845 feet of the existing Taxiway T pavement that requires rehabilitation to ensure safe airfield operations.
This project removes 408 feet of Taxiway F from the airfield for geometric improvements identified in the airport's Runway Incursion Mitigation Plan.
This project removes 449 feet of Taxiway Q from the airfield for geometric improvements identified in the airport's Runway Incursion Mitigation Plan.
Intended beneficiary: This grant will provide federal funding for airports associated with Boston, Massachusetts.
Awardee
Grant Program (CFDA)
Awarding / Funding Agency
Place of Performance
East Boston,
Massachusetts
02128
United States
Geographic Scope
Single Zip Code
Related Opportunity
None
Analysis Notes
Infrastructure $43,379,026 (100%) percent this Project Grant was funded by the 2021 Infrastructure Act.
Massachusetts Port Authority was awarded
Project Grant 32500101472023
worth $43,379,026
from New England Region in June 2023 with work to be completed primarily in East Boston Massachusetts United States.
The grant
has a duration of 4 years and
was awarded through assistance program 20.106 Airport Improvement Program, COVID-19 Airports Programs, and Infrastructure Investment and Jobs Act Programs.
$14,459,675 (25.0%) of this Project Grant was funded by non-federal sources.
Status
(Ongoing)
Last Modified 6/26/23
Period of Performance
6/6/23
Start Date
6/5/27
End Date
Funding Split
$43.4M
Federal Obligation
$14.5M
Non-Federal Obligation
$57.8M
Total Obligated
Activity Timeline
Additional Detail
Award ID FAIN
32500101472023
SAI Number
None
Award ID URI
SAI NOT AVAILABLE
Awardee Classifications
Special District Government
Awarding Office
69A255 FAA NEW ENGLAND REGION AIRPORTS DIV
Funding Office
69A255 FAA NEW ENGLAND REGION AIRPORTS DIV
Awardee UEI
L2FCPLYT3GE1
Awardee CAGE
0TD85
Performance District
07
Senators
Edward Markey
Elizabeth Warren
Elizabeth Warren
Representative
Ayanna Pressley
Budget Funding
| Federal Account | Budget Subfunction | Object Class | Total | Percentage |
|---|---|---|---|---|
| Airport Infrastructure Grants, Federal Aviation Administration, Transportation (069-1338) | Air transportation | Grants, subsidies, and contributions (41.0) | $43,379,026 | 100% |
Modified: 6/26/23