Description: This agreement provides funding to the City of Joliet to implement its project to conduct final design and engineering work for three segments of the Alternative Water Source Program water transmission main as directed in the 2023 and 2024 Consolidated Appropriations Act or as identified in an approved technical correction if one has been approved for this project.
Activities: The activities to be performed include the engineering and design of a drinking water infrastructure construction project.
Workplan activities consist of design engineering related to three AWSP work packages.
These activities include:
- AWSP-06-03 - Regional Water Transmission Main Segment C. This work package involves the construction of a total of approximately 4.0 miles of regional water transmission main ranging in diameter from 42-inches to 48-inches.
- AWSP-07-01 - Cal-Sag Crossing. This work package involves the construction of approximately 675 feet of 10-foot diameter rock tunnel and two tunnel shafts to carry 66-inch diameter water transmission main beneath the Cal-Sag Channel.
- AWSP-07-02 - Des Plaines River Crossing. This work package involves the construction of approximately 4100 feet of 10-foot diameter rock tunnel and two tunnel shafts to carry 66-inch diameter water transmission main beneath the Illinois and Michigan Canal, the Chicago Sanitary and Ship Canal, and the Des Plaines River.
Subrecipient: No subawards are included in this assistance agreement.
Outcomes: The anticipated deliverables include 100% completed engineering and design for three crucial AWSP work packages.
The expected outcomes include a safe, long-term, sustainable, and high-quality source of drinking water.
The intended beneficiaries include the six member communities of the Grand Prairie Water Commission and their approximate 250,000 residents.
Activities: The activities to be performed include the engineering and design of a drinking water infrastructure construction project.
Workplan activities consist of design engineering related to three AWSP work packages.
These activities include:
- AWSP-06-03 - Regional Water Transmission Main Segment C. This work package involves the construction of a total of approximately 4.0 miles of regional water transmission main ranging in diameter from 42-inches to 48-inches.
- AWSP-07-01 - Cal-Sag Crossing. This work package involves the construction of approximately 675 feet of 10-foot diameter rock tunnel and two tunnel shafts to carry 66-inch diameter water transmission main beneath the Cal-Sag Channel.
- AWSP-07-02 - Des Plaines River Crossing. This work package involves the construction of approximately 4100 feet of 10-foot diameter rock tunnel and two tunnel shafts to carry 66-inch diameter water transmission main beneath the Illinois and Michigan Canal, the Chicago Sanitary and Ship Canal, and the Des Plaines River.
Subrecipient: No subawards are included in this assistance agreement.
Outcomes: The anticipated deliverables include 100% completed engineering and design for three crucial AWSP work packages.
The expected outcomes include a safe, long-term, sustainable, and high-quality source of drinking water.
The intended beneficiaries include the six member communities of the Grand Prairie Water Commission and their approximate 250,000 residents.
Awardee
Funding Goals
1 - PILLAR 1: CLEAN AIR, LAND, AND WATER FOR EVERY AMERICAN 1.1 - TBD
Grant Program (CFDA)
Awarding / Funding Agency
Place of Performance
Joliet,
Illinois
United States
Geographic Scope
City-Wide
Related Opportunity
EPA-CEP-01
City Of Joliet was awarded
Alternative Water Source Program Engineering Design Joliet City
Cooperative Agreement 00E04089
worth $3,752,972
from EPA Region 5: Chicago in July 2025 with work to be completed primarily in Joliet Illinois United States.
The grant
has a duration of 1 year 6 months and
was awarded through assistance program 66.202 Congressionally Mandated Projects.
$1,147,028 (23.0%) of this Cooperative Agreement was funded by non-federal sources.
Status
(Ongoing)
Last Modified 7/30/25
Period of Performance
7/1/25
Start Date
1/31/27
End Date
Funding Split
$3.8M
Federal Obligation
$1.1M
Non-Federal Obligation
$4.9M
Total Obligated
Activity Timeline
Additional Detail
Award ID FAIN
00E04089
SAI Number
None
Award ID URI
SAI EXEMPT
Awardee Classifications
City Or Township Government
Awarding Office
68HF05 REGION 5 (GRANTS OFFICE)
Funding Office
68U000 REGION 5 (FUNDING OFFICE)
Awardee UEI
UKXHU6SJXLR9
Awardee CAGE
3Q0F6
Performance District
IL-14
Senators
Richard Durbin
Tammy Duckworth
Tammy Duckworth
Modified: 7/30/25