00E03380
Cooperative Agreement
Overview
Grant Description
Description:
This agreement provides funding to the City of Harvey to implement its project for construction on 154th Street Corridor to redesign their combined sewer system by separating stormwater and sanitary sewer lines to provide better drainage of surface water runoff as directed in the 2022 Consolidated Appropriations Act or as identified in an approved technical correction if one has been approved for this project.
Activities:
The activities to be performed are for construction of a redesign of the combined sewer system on 154th Street Corridor. The construction will separate the sanitary and stormwater lines.
Subrecipient:
No subawards are included in this assistance agreement.
Outcomes:
The anticipated deliverables are a redesigned combined sewer system that will separate sanitary and storm lines with the 154th Corridor, which are expected to lead to reduced stormwater runoff and ponding within the corridor and contribute to cleaner stormwater for City of Harvey residents.
This agreement provides funding to the City of Harvey to implement its project for construction on 154th Street Corridor to redesign their combined sewer system by separating stormwater and sanitary sewer lines to provide better drainage of surface water runoff as directed in the 2022 Consolidated Appropriations Act or as identified in an approved technical correction if one has been approved for this project.
Activities:
The activities to be performed are for construction of a redesign of the combined sewer system on 154th Street Corridor. The construction will separate the sanitary and stormwater lines.
Subrecipient:
No subawards are included in this assistance agreement.
Outcomes:
The anticipated deliverables are a redesigned combined sewer system that will separate sanitary and storm lines with the 154th Corridor, which are expected to lead to reduced stormwater runoff and ponding within the corridor and contribute to cleaner stormwater for City of Harvey residents.
Awardee
Grant Program (CFDA)
Awarding / Funding Agency
Place of Performance
Harvey,
Illinois
United States
Geographic Scope
City-Wide
Related Opportunity
None
Analysis Notes
Amendment Since initial award the total obligations have decreased 52% from $7,300,000 to $3,500,000.
City Of Harvey was awarded
154th Street Corridor Sewer System Redesign for Improved Drainage
Cooperative Agreement 00E03380
worth $3,500,000
from EPA Region 5: Chicago in April 2024 with work to be completed primarily in Harvey Illinois United States.
The grant
has a duration of 1 year 1 months and
was awarded through assistance program 66.202 Congressionally Mandated Projects.
Status
(Complete)
Last Modified 12/6/23
Period of Performance
4/1/24
Start Date
5/30/25
End Date
Funding Split
$3.5M
Federal Obligation
$0.0
Non-Federal Obligation
$3.5M
Total Obligated
Activity Timeline
Transaction History
Modifications to 00E03380
Additional Detail
Award ID FAIN
00E03380
SAI Number
None
Award ID URI
SAI EXEMPT
Awardee Classifications
City Or Township Government
Awarding Office
68HF05 REGION 5 (GRANTS OFFICE)
Funding Office
68U000 REGION 5 (FUNDING OFFICE)
Awardee UEI
QEKXSFGWHDB1
Awardee CAGE
1WZ26
Performance District
IL-02
Senators
Richard Durbin
Tammy Duckworth
Tammy Duckworth
Budget Funding
| Federal Account | Budget Subfunction | Object Class | Total | Percentage |
|---|---|---|---|---|
| State and Tribal Assistance Grants, Environmental Protection Agency (068-0103) | Pollution control and abatement | Grants, subsidies, and contributions (41.0) | $3,500,000 | 100% |
Modified: 12/6/23