00A01816
Cooperative Agreement
Overview
Grant Description
Description: The City of Dover, New Hampshire is replacing existing cast iron water mains within a 6,000-foot section stretching from the 4-million-gallon Garrison Hill water storage tank to Broadway.
The replacement includes a critical water main, located on Central Avenue.
This section of water line is a critical artery that serves water and fire suppression to the southern two-thirds of the City of Dover, including the Central Business District (CBD).
This replacement is a necessity to enhance the reliability, efficiency, and capacity of Dover's municipal water system.
Activities: The City of Dover, New Hampshire is replacing existing cast iron water mains within a 6,000-foot section stretching from the 4-million-gallon Garrison Hill water storage tank to Broadway.
Phase 1 of the replacement project will upgrade the existing cast iron water main from the Garrison Hill water storage tank, which will be rehabilitated in 2025, down Abbey Sawyer Memorial Highway, south on Central Avenue, and under Broadway.
Inoperable valves in this area will also be replaced with additional valves.
Subsequent phases 2 and 3 will continue the improvements from Broadway (the end of Phase 1) to Silver Street.
Subrecipient: No subawards are included in this assistance agreement.
Outcomes: Anticipated deliverables include installation (replacement) of cast iron water main lines to provide drinking water and fire suppression for residents of Dover, New Hampshire.
The replacement includes a critical water main, located on Central Avenue.
This section of water line is a critical artery that serves water and fire suppression to the southern two-thirds of the City of Dover, including the Central Business District (CBD).
This replacement is a necessity to enhance the reliability, efficiency, and capacity of Dover's municipal water system.
Activities: The City of Dover, New Hampshire is replacing existing cast iron water mains within a 6,000-foot section stretching from the 4-million-gallon Garrison Hill water storage tank to Broadway.
Phase 1 of the replacement project will upgrade the existing cast iron water main from the Garrison Hill water storage tank, which will be rehabilitated in 2025, down Abbey Sawyer Memorial Highway, south on Central Avenue, and under Broadway.
Inoperable valves in this area will also be replaced with additional valves.
Subsequent phases 2 and 3 will continue the improvements from Broadway (the end of Phase 1) to Silver Street.
Subrecipient: No subawards are included in this assistance agreement.
Outcomes: Anticipated deliverables include installation (replacement) of cast iron water main lines to provide drinking water and fire suppression for residents of Dover, New Hampshire.
Awardee
Funding Goals
1 - PILLAR 1: CLEAN AIR, LAND, AND WATER FOR EVERY AMERICAN 1.1 - TBD
Grant Program (CFDA)
Awarding / Funding Agency
Place of Performance
Dover,
New Hampshire
03820
United States
Geographic Scope
Single Zip Code
Related Opportunity
EPA-CEP-01
City Of Dover was awarded
Dover Water Main Replacement for Enhanced System Reliability
Cooperative Agreement 00A01816
worth $3,452,972
from EPA Region 1: Boston in October 2025 with work to be completed primarily in Dover New Hampshire United States.
The grant
has a duration of 1 year and
was awarded through assistance program 66.202 Congressionally Mandated Projects.
$4,687,957 (58.0%) of this Cooperative Agreement was funded by non-federal sources.
Status
(Ongoing)
Last Modified 10/6/25
Period of Performance
10/1/25
Start Date
10/2/26
End Date
Funding Split
$3.5M
Federal Obligation
$4.7M
Non-Federal Obligation
$8.1M
Total Obligated
Activity Timeline
Additional Detail
Award ID FAIN
00A01816
SAI Number
None
Award ID URI
SAI EXEMPT
Awardee Classifications
City Or Township Government
Awarding Office
68HF01 REGION 1 (GRANTS OFFICE)
Funding Office
68Q000 REGION 1 (FUNDING OFFICE)
Awardee UEI
CJFYYJTK9TE5
Awardee CAGE
5EXR7
Performance District
NH-01
Senators
Jeanne Shaheen
Margaret Hassan
Margaret Hassan
Modified: 10/6/25