Search Grant Opportunities

Research and Development for Biological Control of Arundo Donax

ID: W81EWF-25-SOI-0004 • Type: Posted

Description

A. Short Description of Funding Opportunity

ERDC seeks applications for: evaluation of biological control for Arundo donax in southern California. There is potential for at least two distinct projects to arise from this opportunity, including determination of optimal release and monitoring strategies for A. donax biological controls, and evaluation of the impact of biological control on A. donax water-use efficiency, growth, and biomass allocation.

B. Background

Giant cane is a large (4-8m tall) perennial grass native to western Asia and likely introduced into North America from Spain in the early 1500s, but now is widespread with considerable capacity for expansion in North America (Figure 1; Moran and Goolsby 2022). Reproduction is solely clonal in the US and occurs through extensive rhizome networks or fragmentation. Large knotty rhizomes form underground masses up to three feet thick and provide a source of regrowth following management. Giant cane infests disturbed habitats near water and is particularly harmful in arid environments where it outcompetes other species and has extremely high water-use (Figure 2) (Seawright et al. 2009, Racelis et al. 2012, Goolsby et al. 2016). In fact, giant cane was estimated to transpire 56,200 acre-feet of water per year on the Santa Ana River alone, which equates to serving approximately 190,000 people in an area known for droughts and at a potential municipal cost of $25M in lost water (Iverson 1993).

Figure 1. Habitat suitability for Arundo donax in the US, based on model outputs from INHABIT (USGS). (See FOA)

Costs of giant cane management near Los Angeles can exceed $250K per acre, due to the effort required for repeated herbicide applications, then subsequent biomass and sediment management. Giant cane infestations have reduced the channel conveyance capacity of the Los Angeles River (at the Glendale neighborhood) from a 25-year storm event to a 2-year storm event where it impacts over 6000 people and risks $1B in property value. There is interest in using biological control as a sustaining management tool for giant cane in California, but a lack of information about whether agents could be used under the conditions present in project areas has prevented its widespread implementation.

Figure 2. Representative giant cane infestations within the SPL AOR A) Los Angeles River at Glendale Narrows, B) Whittier Narrows, C) Santa Ana River, D) Rio Hondo. (See FOA)

Two biological control agents are approved to manage giant cane in California (Figure 3): Tetramesa romana, the Arundo gall wasp, and Rhizaspidiotus donacis, the Arundo armored scale (CAL-IPC 2020). Both agents are established in the US and have been used to successfully control giant cane infestations in Texas (Goolsby et al. 2014, Goolsby et al. 2016). Additional releases and control monitoring is ongoing in northern California but, to date, there is insufficient data to inform their use in Southern California. It has been suggested that biological control of giant cane will be most successful in areas with sufficient warming days (Marshall et al. 2018). A previous assessment found Ventura/ Oxnard, CA to have relatively low number of warming days compared to locations in south Texas where control has been successful, but other warmer locations in California, such as parts of Los Angeles County, may be better suited for a biological control program.

C. Program Description/Objective:

The following objectives summarize the work for a maximum of three (3) unique, stand-alone projects. Over the life of the cooperative agreement (5 years), it is anticipated that 3 projects would be completed.

Objective 1: Investigator will collaborate with ERDC researchers to develop a biological control plan to investigate the types and magnitudes of control for giant cane.

Objective 2: Determine best Arundo donax biological control release and establishment approach through either 1) natural increase of incidental populations, 2) traditional release-and-wait types of programs, or 3) inundative releases.

Objective 3: Determine impact of biological control on Arundo donax metrics that are relevant to invasive species management and flood conveyence, to potentially include giant cane stem density, water use / transpiration, vegetation diversity, plant stature, and control agent dispersal related to flooding. Partner will work with ERDC to compile results, conduct statistical analysis, and synthesize into guidance document.

Background
The US Army Corps of Engineers (USACE) Engineer Research and Development Center (ERDC) is issuing a funding opportunity for the evaluation of biological control for Arundo donax, commonly known as giant cane, in southern California. This invasive species poses significant ecological and economic challenges due to its high water-use efficiency and ability to outcompete native flora.

The goal of this grant is to develop effective management strategies using biological control agents that have shown success in other regions.

Grant Details
The grant encompasses three main objectives:
1) Collaborate with ERDC researchers to develop a biological control plan that investigates the types and magnitudes of control for giant cane;
2) Determine the best release and establishment approaches for Arundo donax biological control, which may include natural population increases, traditional release-and-wait programs, or inundative releases;
3) Assess the impact of biological control on metrics relevant to invasive species management and flood conveyance, including stem density, water use/transpiration, vegetation diversity, plant stature, and dispersal of control agents during flooding.

The partner will work with ERDC to compile results, conduct statistical analyses, and synthesize findings into a guidance document.

Eligibility Requirements
Eligible applicants are restricted to non-federal partners of the Californian Cooperative Ecosystems Studies Unit (CESU). Disclosures of current and pending support made in this application may render an applicant ineligible for funding.

Period of Performance
The anticipated period of performance for this cooperative agreement is five years.

Grant Value
The total estimated program funding is $395,000. The award ceiling for Year 1 is $120,000, with subsequent optional years valued at $75,000 each for Years 2-4 and $50,000 for Year 5.

Place of Performance
The grant activities will primarily take place in southern California.

Overview

Category of Funding
Science and Technology and other Research and Development
Funding Instruments
Cooperative Agreement
Grant Category
Discretionary
Cost Sharing / Matching Requirement
False
Source
On 2/12/25 Engineer Research and Development Center posted grant opportunity W81EWF-25-SOI-0004 for Research and Development for Biological Control of Arundo Donax with funding of $395,000. The grant will be issued under grant program 12.630 Basic, Applied, and Advanced Research in Science and Engineering. It is expected that one grant will be made.

Timing

Posted Date
Feb. 12, 2025, 12:00 a.m. EST
Closing Date
April 14, 2025, 12:00 a.m. EDT Past Due
Last Updated
Feb. 13, 2025, 12:40 p.m. EST
Version
2
Archive Date
Dec. 31, 2025

Eligibility

Eligible Applicants
Others (see text field entitled "Additional Information on Eligibility" for clarification)
Additional Info
This opportunity is restricted to non-federal partners of the Californian Cooperative Ecosystems Studies Unit (CESU).

Award Sizing

Ceiling
$120,000
Floor
Not Listed
Estimated Program Funding
$395,000
Estimated Number of Grants
1

Contacts

Contact
Stacy Thurman Grantor
Email Description
Stacy Thurman
Contact Phone
(601) 634-3198

Documents

Posted documents for W81EWF-25-SOI-0004

Potential Applicants and Partners

Awardees that have recently won grants similar to W81EWF-25-SOI-0004

Incumbent or Similar Grants

Grants similar to W81EWF-25-SOI-0004

Similar Active Opportunities

Open grant opportunities similar to W81EWF-25-SOI-0004