Search Documents
No Results Found.
No Results Found.
Solicitation Amendment W912EP26BA0110002 SF 30.pdf
Posted: Aug. 24, 2026
• Type: .pdf
• Size: 4.29MB
Submit Questions to Government Officer Anonymously
Place your question(s) below. One of our analysts will anonymously submit the question(s) within 8 hours and provide any responses via email once received.
Opportunity Assistant
Hello! Please let me know your questions about this document.
Loading
Save a Question
Customize Generation
We will write a draft based on the below linked information. Add or link more information to improve the draft.
Federal Profile
Select the Federal company profile to use when informing the response based on publicly available data.
Loading federal profile search...
Company Context
Add capability statements, prior responses, or other company materials to customize the response to your business.
Checking for company documents...
Opportunity Context
Add SOWs, attachments, or other files specific to this opportunity.
Checking for opportunity documents...
Link a Pursuit
Optionally associate this draft with an existing pursuit.
Overview
Related Opportunity
Related Agency
Summary
Amendment 0002 to the U.S. Army Corps of Engineers solicitation for Palm Beach Harbor Maintenance Dredging—Entrance Channel and Settling Basins, Palm Beach County, Florida, revises administrative, environmental-protection, turbidity-monitoring, and dredging technical requirements for the maintenance-dredging project.
The amendment replaces Volume 2 Sections 01 30 00, Administrative Requirements; 01 57 20.00 35, Environmental Protection; 01 57 25.00 35, Turbidity Monitoring Requirements; and 35 20 23.00 35, Dredging Requirements, while making no changes to Volume 1 or the drawings.
It confirms that mechanical, hopper, and cutter-suction dredges are acceptable; anticipates contract award on September 24, 2026; and clarifies that the Notice to Proceed will be issued 60–90 calendar days after award or after required bonds are in place, whichever is later.
The revised administrative section requires use of the Corps’ Resident Management System; preconstruction, partnering, coordination, preparatory, initial-phase, and progress meetings; and turnover-planning “Red Zone” meetings beginning at approximately 75 percent completion or three to six months before beneficial occupancy.
The preconstruction conference is to occur within 30–60 calendar days after NTP, with participation by the contractor’s project manager, superintendent, Site Safety and Health Officer, Quality Control Manager, and key subcontractors and suppliers.
Contractors must submit signature-authority documentation, drug-free-workplace records, and required insurance information, and may not begin work until required preconstruction submittals are accepted or approved.
The environmental revisions incorporate compliance with applicable federal and Florida requirements, including the Clean Water Act, Endangered Species Act, Marine Protection, Research, and Sanctuaries Act, NEPA, NPDES, and related regulations, as well as Florida Department of Environmental Protection Permit No. 0216012-025-JC and Modification 0216012-029-JN.
The amendment states that temporary fencing is not required at the nearshore disposal site. Required safety and wildlife-warning signs are to be placed on the dredge or floating plant, including Corps safety, manatee-warning, and “No Wake Zone” signs.
A Florida-licensed Professional Surveyor/Mapper is required for the certified nearshore survey.
Additional revisions address manatee-observer responsibilities, turbidity-monitoring frequency for clamshell operations and nearshore placement, and payment or treatment of side-slope shoaling.
The amendment replaces Volume 2 Sections 01 30 00, Administrative Requirements; 01 57 20.00 35, Environmental Protection; 01 57 25.00 35, Turbidity Monitoring Requirements; and 35 20 23.00 35, Dredging Requirements, while making no changes to Volume 1 or the drawings.
It confirms that mechanical, hopper, and cutter-suction dredges are acceptable; anticipates contract award on September 24, 2026; and clarifies that the Notice to Proceed will be issued 60–90 calendar days after award or after required bonds are in place, whichever is later.
The revised administrative section requires use of the Corps’ Resident Management System; preconstruction, partnering, coordination, preparatory, initial-phase, and progress meetings; and turnover-planning “Red Zone” meetings beginning at approximately 75 percent completion or three to six months before beneficial occupancy.
The preconstruction conference is to occur within 30–60 calendar days after NTP, with participation by the contractor’s project manager, superintendent, Site Safety and Health Officer, Quality Control Manager, and key subcontractors and suppliers.
Contractors must submit signature-authority documentation, drug-free-workplace records, and required insurance information, and may not begin work until required preconstruction submittals are accepted or approved.
The environmental revisions incorporate compliance with applicable federal and Florida requirements, including the Clean Water Act, Endangered Species Act, Marine Protection, Research, and Sanctuaries Act, NEPA, NPDES, and related regulations, as well as Florida Department of Environmental Protection Permit No. 0216012-025-JC and Modification 0216012-029-JN.
The amendment states that temporary fencing is not required at the nearshore disposal site. Required safety and wildlife-warning signs are to be placed on the dredge or floating plant, including Corps safety, manatee-warning, and “No Wake Zone” signs.
A Florida-licensed Professional Surveyor/Mapper is required for the certified nearshore survey.
Additional revisions address manatee-observer responsibilities, turbidity-monitoring frequency for clamshell operations and nearshore placement, and payment or treatment of side-slope shoaling.