Search Documents

C08.0 PWS DRAFT.pdf

Posted: June 13, 2023 • Type: .pdf • Size: 0.75MB
Question & Answer Assistant

Hello! Please let me know your questions about this document.

Loading

Overview

Summary
Performance work statement (PWS) for the repair of Thermo Scientific portable Niton XRTF instruments at PSNS&IMF Laboratory Code 134. The contract is for non-personal services to provide tier 1, 2, 3, and/or 4 repairs, return shipping, and complimentary loaners during any service for specific Thermo Scientific portable instruments. The contractor is required to provide maintenance and identified repairs of the PSNS Laboratory’s portable XTRF units, ensuring full functionality of all PSNS-owned XRTF instruments. The resulting contract shall provide specific maintenance services identified in the PWS in addition to any additional repairs to maintain the full functionality of all PSNS-owned XRTF instruments. The ordering period for the contract shall be from the date of contract award through five years.

The contractor shall develop and maintain an effective quality control program to ensure services are performed according to the PWS. The contractor's quality control program will be evaluated by the government through a quality assurance surveillance plan. The work under this contract will be performed at the contractor facility. Additionally, the document includes details about post-award conferences, periodic progress meetings, and the roles and responsibilities of the Contracting Officer's Representative (COR). The document also outlines specific tasks such as basic services, repair timelines, and deliverables schedule.

In summary, this performance work statement outlines the requirements for repairing Thermo Scientific portable Niton XRTF instruments at PSNS&IMF Laboratory Code 134. It details the specific services required, including tier 1, 2, 3, and 4 repairs, return shipping, and complimentary loaners for designated instruments. The document also specifies the objectives, scope, period of performance, quality control measures, place of performance, post-award conferences, roles of the Contracting Officer's Representative (COR), as well as definitions and acronyms related to the contract.

Document Preview