This Performance Work Statement (PWS) is issued by the U.S. Department of Agriculture (USDA) for the Slater Roadside Danger Tree Removal project.

The primary objective of this non-personal services contract is to provide hazardous tree removal and fuels management services across the Slater Fire and Wild Rivers Road system on the Rogue River Siskiyou National Forest in Oregon, with some work extending into Siskiyou County, California. The services aim to reduce fuel hazards, improve forest health, and enhance the potential yield capability of these areas by removing undesirable trees while retaining high-quality dominant and co-dominant trees.

The scope of work includes hazardous tree removal, felling, stacking, pruning, and slash treatment along 92 miles of designated roads, with optional tasks covering an additional 49 miles.

The contractor must utilize appropriate equipment such as rubber-tired machines for paved roads and tracked equipment for varied terrain. Specific requirements include adherence to local, state, and federal regulations, a Quality Control Program (QCP), and a Quality Assurance Surveillance Plan (QASP) that must be submitted within ten days post-award.

The contract period spans from the date of award until October 1, 2028. Additionally, contractors are required to comply with safety regulations, fire prevention measures, and environmental protections throughout the project duration.

Submission requirements include providing a list of equipment two working days prior to work commencement and notifying the contracting officer at least three working days in advance for any service interruptions. Contractors must also maintain adequate liability insurance and obtain necessary permits before final payment can be processed.

Regular progress meetings will be held to review contractor performance and address any issues that arise during the execution of the contract.