Search Documents
No Results Found.
No Results Found.
B09 Amendment 3 estimated cut and fill quantities 0003.pdf
Posted: Sept. 2, 2026
• Type: .pdf
• Size: 0.08MB
Submit Questions to Government Officer Anonymously
Place your question(s) below. One of our analysts will anonymously submit the question(s) within 8 hours and provide any responses via email once received.
Opportunity Assistant
Hello! Please let me know your questions about this document.
Loading
Save a Question
Customize Generation
We will write a draft based on the below linked information. Add or link more information to improve the draft.
Federal Profile
Select the Federal company profile to use when informing the response based on publicly available data.
Loading federal profile search...
Company Context
Add capability statements, prior responses, or other company materials to customize the response to your business.
Checking for company documents...
Opportunity Context
Add SOWs, attachments, or other files specific to this opportunity.
Checking for opportunity documents...
Link a Pursuit
Optionally associate this draft with an existing pursuit.
Overview
Related Opportunity
Related Agency
Summary
This Amendment provides estimated rough-grade cut-and-fill quantities for three project areas—Mammoth, Northeast Entrance, and Canyon—based on comparisons to existing grade, with quantities stated in cubic yards.
- **Mammoth:** 1,717.41 cubic yards of cut and 422.63 cubic yards of fill, resulting in 1,294.79 cubic yards of net cut for export.
- **Northeast Entrance:** 2,293.67 cubic yards of cut and 356.95 cubic yards of fill, resulting in 1,936.71 cubic yards of net cut for export.
- **Canyon:** 1,880.10 cubic yards of cut and 3,699.95 cubic yards of fill, resulting in 1,819.86 cubic yards of net fill requiring import.
The estimates apply outside each building envelope and do not include foundation excavation.
The Mammoth calculation includes removal or “punching out” of pavement and base sections for proposed driveways and sidewalks, while the Northeast Entrance calculation includes pavement and base removals for proposed parking, curb and gutter, and sidewalks.
The Canyon calculation includes pavement and base removals for proposed roadways, parking areas, V-pans, curb and gutter, and sidewalks.
Quantities for asphalt, concrete, base, and subbase are expressly excluded from all three estimates.
- **Mammoth:** 1,717.41 cubic yards of cut and 422.63 cubic yards of fill, resulting in 1,294.79 cubic yards of net cut for export.
- **Northeast Entrance:** 2,293.67 cubic yards of cut and 356.95 cubic yards of fill, resulting in 1,936.71 cubic yards of net cut for export.
- **Canyon:** 1,880.10 cubic yards of cut and 3,699.95 cubic yards of fill, resulting in 1,819.86 cubic yards of net fill requiring import.
The estimates apply outside each building envelope and do not include foundation excavation.
The Mammoth calculation includes removal or “punching out” of pavement and base sections for proposed driveways and sidewalks, while the Northeast Entrance calculation includes pavement and base removals for proposed parking, curb and gutter, and sidewalks.
The Canyon calculation includes pavement and base removals for proposed roadways, parking areas, V-pans, curb and gutter, and sidewalks.
Quantities for asphalt, concrete, base, and subbase are expressly excluded from all three estimates.