Search Documents
No Results Found.
No Results Found.
B08 Attachment 13 Steel Pipes Memo 0004.pdf
Posted: July 1, 2026
• Type: .pdf
• Size: 0.92MB
Submit Questions to Government Officer Anonymously
Place your question(s) below. One of our analysts will anonymously submit the question(s) within 8 hours and provide any responses via email once received.
Opportunity Assistant
Hello! Please let me know your questions about this document.
Loading
Save a Question
Customize Generation
We will write a draft based on the below linked information. Add or link more information to improve the draft.
Federal Profile
Select the Federal company profile to use when informing the response based on publicly available data.
Loading federal profile search...
Company Context
Add capability statements, prior responses, or other company materials to customize the response to your business.
Checking for company documents...
Opportunity Context
Add SOWs, attachments, or other files specific to this opportunity.
Checking for opportunity documents...
Link a Pursuit
Optionally associate this draft with an existing pursuit.
Overview
Related Opportunity
Related Agency
Summary
This memo from the U.S. Bureau of Indian Affairs concerns the Bannock Pumping Plant Modernization and Rehabilitation project, specifically addressing the encasement of 20-inch steel discharge piping.
Dated June 24, 2026, the memo is directed to Mark McNearney, P.E., and authored by Jerry Otto, P.E. It summarizes findings from a visual observation conducted by HDR in August 2024, which aimed to assess the location, depth, and condition of selected steel discharge pipes associated with the pumping plant's low and high-lift systems.
The inspection revealed minor pitting on the external surfaces of the pipes, which were covered with coal tar or wax taping. More significantly, it was discovered that concrete encasements were improperly installed around the high-lift steel pipes, with concrete encountered approximately six inches below the existing ground surface.
This misinstallation is attributed to excess concrete being poured into trenches during adjacent thrust block construction. The memo emphasizes that the construction contractor must verify the location and depth of this suspect concrete and take care not to disturb it during civil work or new pipe connections to prevent damage to the existing buried steel pipes.
An attachment provides further details and visual documentation of these findings.
Dated June 24, 2026, the memo is directed to Mark McNearney, P.E., and authored by Jerry Otto, P.E. It summarizes findings from a visual observation conducted by HDR in August 2024, which aimed to assess the location, depth, and condition of selected steel discharge pipes associated with the pumping plant's low and high-lift systems.
The inspection revealed minor pitting on the external surfaces of the pipes, which were covered with coal tar or wax taping. More significantly, it was discovered that concrete encasements were improperly installed around the high-lift steel pipes, with concrete encountered approximately six inches below the existing ground surface.
This misinstallation is attributed to excess concrete being poured into trenches during adjacent thrust block construction. The memo emphasizes that the construction contractor must verify the location and depth of this suspect concrete and take care not to disturb it during civil work or new pipe connections to prevent damage to the existing buried steel pipes.
An attachment provides further details and visual documentation of these findings.