Summary
The statement of work (SOW) for the fall protection project at Anniston Army Depot (ANAD) Building 143 North is a detailed document outlining the scope of work. It includes furnishing and installing two fall protection monorail systems, with specific details on length, design requirements, load capacity, installation location, and labeling specifications. The responsibilities of the contractor are outlined, including compliance with ANSI standards, acceptance testing, safety practices adhering to OSHA standards, and technical data requirements. Additionally, it specifies the removal and installation responsibilities of the existing monorail systems by the contractor, along with requirements for electrical, plumbing, concrete, foundation hardware, and coordination of trades. The document also highlights the need for a site visit to ensure compatibility with existing facilities and outlines shipping, handling, and storage responsibilities.

This SOW provides detailed information on the specific requirements for the fall protection monorail systems project at ANAD Building 143 North. It includes technical specifications, safety practices, acceptance testing procedures, removal and installation responsibilities, coordination of trades, and site visit recommendations.

Document Preview