Search Documents
No Results Found.
No Results Found.
Attachment 1 EOD Response Trailers SOW 20 May 2026.pdf
Posted: May 29, 2026
• Type: .pdf
• Size: 0.42MB
Submit Questions to Government Officer Anonymously
Place your question(s) below. One of our analysts will anonymously submit the question(s) within 8 hours and provide any responses via email once received.
Opportunity Assistant
Hello! Please let me know your questions about this document.
Loading
Save a Question
Customize Generation
We will write a draft based on the below linked information. Add or link more information to improve the draft.
Federal Profile
Select the Federal company profile to use when informing the response based on publicly available data.
Loading federal profile search...
Company Context
Add capability statements, prior responses, or other company materials to customize the response to your business.
Checking for company documents...
Opportunity Context
Add SOWs, attachments, or other files specific to this opportunity.
Checking for opportunity documents...
Link a Pursuit
Optionally associate this draft with an existing pursuit.
Overview
Related Opportunity
Related Agency
Summary
This Statement of Work (SOW) for the Air Force Civil Engineer Center (AFCEC/CXD) outlines the procurement of Explosive Ordnance Disposal (EOD) Response Trailers. The SOW details the technical and manufacturing specifications for approximately 7’ x 20’ enclosed, all-terrain trailers intended to provide EOD teams at Continental United States (CONUS) installations with a mobile response capability.
These trailers are designed to support emergency response and Defense Support of Civil Authorities (DSCA) missions. The contractor is responsible for manufacturing and delivering trailers that meet stringent requirements for dimensions, structural integrity, electrical systems, and accessories.
Key specifications include compliance with Department of Transportation (DOT) regulations, ensuring that the trailers can be legally used on highways and unimproved surfaces. The trailers must feature a robust cargo box design with fendered wheel wells to maximize interior space, a minimum ground clearance of 16 inches, and an overall weight not exceeding 7,000 lbs.
Essential features include LED lighting, a climate-controlled workspace, a generator platform, and various safety measures such as explosive placards and rear stabilizer jacks. Additionally, the SOW specifies requirements for electrical connections, including a 120/240V electrical system capable of supporting all necessary circuits and future expansions.
The SOW also details submission requirements for contractors interested in bidding on this project. Proposals must demonstrate compliance with all specified technical requirements and include information on delivery timelines to various CONUS locations as designated by individual Delivery Orders.
The comprehensive nature of this SOW ensures that the selected contractor will deliver high-quality trailers that meet the operational needs of EOD teams while adhering to safety and regulatory standards.
These trailers are designed to support emergency response and Defense Support of Civil Authorities (DSCA) missions. The contractor is responsible for manufacturing and delivering trailers that meet stringent requirements for dimensions, structural integrity, electrical systems, and accessories.
Key specifications include compliance with Department of Transportation (DOT) regulations, ensuring that the trailers can be legally used on highways and unimproved surfaces. The trailers must feature a robust cargo box design with fendered wheel wells to maximize interior space, a minimum ground clearance of 16 inches, and an overall weight not exceeding 7,000 lbs.
Essential features include LED lighting, a climate-controlled workspace, a generator platform, and various safety measures such as explosive placards and rear stabilizer jacks. Additionally, the SOW specifies requirements for electrical connections, including a 120/240V electrical system capable of supporting all necessary circuits and future expansions.
The SOW also details submission requirements for contractors interested in bidding on this project. Proposals must demonstrate compliance with all specified technical requirements and include information on delivery timelines to various CONUS locations as designated by individual Delivery Orders.
The comprehensive nature of this SOW ensures that the selected contractor will deliver high-quality trailers that meet the operational needs of EOD teams while adhering to safety and regulatory standards.
Show All