Search Documents
No Results Found.
No Results Found.
Attachment 1 AGE2 Industry Day Briefing Slides 12 May 2020.pdf
Posted: May 13, 2020
• Type: .pdf
• Size: 1.87MB
Submit Questions to Government Officer Anonymously
Place your question(s) below. One of our analysts will anonymously submit the question(s) within 8 hours and provide any responses via email once received.
Opportunity Assistant
Hello! Please let me know your questions about this document.
Loading
Save a Question
Customize Generation
We will write a draft based on the below linked information. Add or link more information to improve the draft.
Federal Profile
Select the Federal company profile to use when informing the response based on publicly available data.
Loading federal profile search...
Company Context
Add capability statements, prior responses, or other company materials to customize the response to your business.
Checking for company documents...
Opportunity Context
Add SOWs, attachments, or other files specific to this opportunity.
Checking for opportunity documents...
Link a Pursuit
Optionally associate this draft with an existing pursuit.
Overview
Related Opportunity
Related Agency
Profiled People
Summary
Industry Day Briefing Slides for the Aerospace Ground Equipment (AGE2) program at Hill Air Force Base were presented on May 12, 2020. The briefing covered the rules of engagement, points of contact, industry day intent, timeline, and sign-in procedures.
The document outlined the purpose of the industry day, which included conducting market research, providing an overview of the mission and requirements, preparing for one-on-one sessions, and obtaining input for a future Request for Proposal (RFP). The acquisition overview highlighted key details such as the anticipated schedule, small business set-aside, evaluation factors (LPTA), and the proposed contract structure including a single-award Indefinite Delivery Indefinite Quantity (IDIQ) contract with an estimated max ceiling of $69 million over a 7-year period.
Additionally, it detailed the CLIN structure for both the basic ordering period and option to extend services. Attendees were required to sign in electronically via email and follow specific guidelines for participation in one-on-one sessions.
The document outlined the purpose of the industry day, which included conducting market research, providing an overview of the mission and requirements, preparing for one-on-one sessions, and obtaining input for a future Request for Proposal (RFP). The acquisition overview highlighted key details such as the anticipated schedule, small business set-aside, evaluation factors (LPTA), and the proposed contract structure including a single-award Indefinite Delivery Indefinite Quantity (IDIQ) contract with an estimated max ceiling of $69 million over a 7-year period.
Additionally, it detailed the CLIN structure for both the basic ordering period and option to extend services. Attendees were required to sign in electronically via email and follow specific guidelines for participation in one-on-one sessions.
Show All