Search Documents
No Results Found.
No Results Found.
Attach C- DNTS - Q and A from March 2021 Industry Day (Final).xlsx
Posted: July 20, 2021
• Type: .xlsx
• Size: 0.03MB
Submit Questions to Government Officer Anonymously
Place your question(s) below. One of our analysts will anonymously submit the question(s) within 8 hours and provide any responses via email once received.
Opportunity Assistant
Hello! Please let me know your questions about this document.
Loading
Save a Question
Customize Generation
We will write a draft based on the below linked information. Add or link more information to improve the draft.
Federal Profile
Select the Federal company profile to use when informing the response based on publicly available data.
Loading federal profile search...
Company Context
Add capability statements, prior responses, or other company materials to customize the response to your business.
Checking for company documents...
Opportunity Context
Add SOWs, attachments, or other files specific to this opportunity.
Checking for opportunity documents...
Link a Pursuit
Optionally associate this draft with an existing pursuit.
Overview
Related Opportunity
Related Agency
Summary
compilation of questions and answers from the FAA Dedicated Network Telecommunications System (DNTS) Industry Day held on March 30, 2021. It includes inquiries related to the acquisition process, technical specifications, program plans, equipment testing, security requirements, and more. Key points include the anticipated duration of repair support aligning with standard manufacturer warranty, the confirmation of testing during the proposal evaluation stage, and the publication of industry day slides on SAM.gov for reference.
Additionally, it addresses the use of specific channel banks in the Airport Cable Loop (ACL) program and the necessity of SONET until legacy system migration is confirmed.
The document also highlights that security requirements will be provided at a later date for the ACL program and emphasizes the consideration of network criticality and security measures. It clarifies that this acquisition is a new requirement without an incumbent and explains the continued need for SONET until legacy system migration is validated. Furthermore, it mentions ongoing evaluations regarding SONET replacement and procurement details that are pending completion of market analysis by the FAA.
Additionally, it addresses the use of specific channel banks in the Airport Cable Loop (ACL) program and the necessity of SONET until legacy system migration is confirmed.
The document also highlights that security requirements will be provided at a later date for the ACL program and emphasizes the consideration of network criticality and security measures. It clarifies that this acquisition is a new requirement without an incumbent and explains the continued need for SONET until legacy system migration is validated. Furthermore, it mentions ongoing evaluations regarding SONET replacement and procurement details that are pending completion of market analysis by the FAA.
Show All