Aerospace Dominance Enabler Division

Advanced Radar
Threat System
Variant 3 (ARTS-V3)
Industry Day
24-26 May 2022

Major Timothy Shuck

timothy.shuck@us.af.mil

Ms Kim Vincent, PM

Battle Ready

Kim.vincent.1.ctr@us.af.mil

Distribution Statement A: Approved for public release. Distribution is unlimited.

Security Preface

ARTS-V3 has been known to Industry for 4 years
Various DD-254s have been awarded for the V3

program (C5 OTA, RFIs, Solicitations, etc.)
DD-254s must be established to include the

authorized distribution of:
Science Technology Information (STINFO)
Controlled Unclassified Information (CUI),
Classified Information (SECRET)
Distribution controlled information (up to Distro D)

DoD and U.S. DoD contractors only

Distribution A

I n t e g r i t y - S e r v i c e - E x c e l l e n c e

Security Preface

This Industry Day is for the V3 Production

Representative Article (PRA) with anticipated award
via the EWAAC IDIQ contract vehicle

This PRA effort does not have an official DD-254 for

authorization of releasing any controlled
information currently (work in progress)

This means that this Industry Day is considered

completely UNCLASSIFIED, Open Source,
Distribution A (Approved for Public Release,
Distribution Unlimited) in its content, discussion,
collaboration, etc.

Distribution A

I n t e g r i t y - S e r v i c e - E x c e l l e n c e

Briefing Outline

Col Hensons Opening Remarks
Acquisition Strategy
MOSA
Contracting Strategy
Intellectual Property Strategy
What is Next: Acquisition
What is Next: Industry Day

Distribution A

I n t e g r i t y - S e r v i c e - E x c e l l e n c e

Col Henson
Opening Remarks

Welcome to Hill AFB & Ogden Utah

ARTS V3s VADR program is
An official program with an

approved acquisition strategy

Funded in the 2023
Presidential Budget

I look forward to reviewing the
results of your proposals as
the Fair Opportunity Decision
Authority

Distribution A

I n t e g r i t y - S e r v i c e - E x c e l l e n c e

Fiscal Year

Quarter

Phases

Decisions &
Milestones

Major Contracting
Events

Acquisition Strategy (1 of 3)

1 2 3 4 1 2 3 4 1 2 3 4

1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1

Engineering Manufacturing
Development

Procurement & Sustainment

V3 ASP

V3 ASP

Contract
Award

OTA for
Digital Design

Contract
Award

3rd Party Software Based Threat Additions

Full Scale Prototype
Development

Gate 1

Gate 2

Contract
Award

Command & Control
SW Development

Contract
Award

Production

Option 1

Option 2

Option 3

Required Assets Available (RAA) = One Fielded System (LRIP Quantity)
Full Operational Capability (FOC) = ACC yet to define (estimate 10-30 systems)

Distribution A

I n t e g r i t y - S e r v i c e - E x c e l l e n c e

Acquisition Strategy (2 of 3)

A closer look at Production
Representative Article (PRA) 4 EWAAC awards

3 X band frequency
1 C band frequency

Three vendors all the way through PRA development

Phase One

Phase Two

Phase Three
Two

Production (FFP)
One

Observe sub
scale test data
Analyze models
3-6 months post
award (CPFF or
CPIF)

Full scale PRA (CPFF or CPIF)
Modular trailer integration
System Integration Testing
Functional configuration audit
Supply chain issues & funding
instability could drive delivery
into 2026

Critical Design Review (CDR)
Select backend PRA design
Start C band array (pending requirement)

Physical Configuration Audit (PCA)
Digital twin
Down-select to one production design
MS(C) Decision Brief

Distribution A

I n t e g r i t y - S e r v i c e - E x c e l l e n c e

Acquisition Strategy (3 of 3)

A closer look at software

Separate contract (delta ASP in FY23)
Add objective threat radar profiles
Develop radar control automation software

Function as a plug in with existing LMOC

capability

3rd party application development
Radar return processing algorithms

Agile Software PRA development

Phase One

Phase Two
One

Threshold threat characteristic profiles
Two

Review proposed software architecture
Finish code for flexible radar operations
Approx. 6 months

Backend analysis & selection
Prove interoperability capability
Prove 3rd party operability for software
developmental kit & arrays

Distribution A

I n t e g r i t y - S e r v i c e - E x c e l l e n c e

Modular Open Systems Approach (MOSA) is being used
to promote the ability to swap radar front ends & back
Allows one back end to be used with other front ends in

different frequency bands & optimized for other
capabilities

Mitigates vendor lock
Utilizes industry standards
Standards
in Cameo
Model

Distribution A

I n t e g r i t y - S e r v i c e - E x c e l l e n c e

Contracting Strategy (1 of 3)

Contract parameters overview

Market research reflects an expectation of multiple responsible

businesses submitting proposals

EWAAC IDIQ allows orders with options

Options structured to represent phases; exercised based on
successful completion of previous phase, discretion of the
Government, & funding availability

EWAAC potentially faster to award than establishing a new IDIQ

using FAR 16.5 procedures

Contract structure

EWAAC IDIQ will be used to compete requirement
Award up to four orders with options

Contract type

CPFF/CPIF for phases 1 & 2, FFP for phase 3

Distribution A

I n t e g r i t y - S e r v i c e - E x c e l l e n c e

Contracting Strategy (2 of 3)

Three Phased Acquisition (est. up to 4 orders)

Initial Award Evaluation Factors

Technical Approach
Rights in Technical Data
Past Performance
Cost/Price
Small Business Participation

Phase 1: Sub Scale Test Data, Analyzing Models

Notional Basic CLIN(s): 000X, CPFF/CPIF
Non-Severable: Design review info package (CDRLs)
Est. POP: 6 Months
Gate 1: Evaluation selection to award option 1phase 2

Critical Design Review (CDR)
Select Back-End PRA Design

Distribution A

I n t e g r i t y - S e r v i c e - E x c e l l e n c e

Contracting Strategy (3 of 3)

Three Phased Acquisition (continued)

Phase 2: Full-scale PRA, modular trailer integration, system

integration testing, functional configuration audit

Notional option one CLIN: 100X, CPFF/CPIF; Est. POP: 30 months
Non-severable: 4 PRAs (Band priority in discussion at HQ ACC)
Phase 2 may have an off-ramp/intermediate evaluation
Gate 2: Evaluation selection to award option 2phase 3
Physical Configuration Audit (PCA), Digital twin
Down-select to one production design

Phase 3: Production

Notional option CLIN(s): X00X, FFP; Est. POP: 36 months
Non-severable: Delivery of systems
Anticipating multiple quantity options CLINs

Distribution A

I n t e g r i t y - S e r v i c e - E x c e l l e n c e

Intellectual Property
Strategy

VADR is designed for agile growththis requires a high

percent of government owned data rights

All development paid for by this contract is entitled to

unlimited rights by law

There is still the possibility that vendors could bid a

response with limited data rights
Data & software delivery priced separately & evaluated in

source selection (trade off factor)

If necessary data rights to establish an agile growth path are not
offered with a proposal, that will make the bid non-competitive

It is possible that some data could have limited rights. Vendors will
be asked in a proposal to describe how any limited right data could
be managed in a way that supports an agile growth path designed
to prevent vendor lock

Distribution A

I n t e g r i t y - S e r v i c e - E x c e l l e n c e

What is Next: Acquisition

Watch for a draft Fair Opportunity Proposal Request

(FOPR) anticipated approximate release date of 15 June Draft FOPR will reflect band priority update from HQ ACC
Current plan is 3 X band awards, 1 C band award
Could change wildly: X, C, UHF, VHF

Watch for official FOPR anticipated approximate release

date of 15 July 2022

45 day FOPR response time is planned

Distribution A

I n t e g r i t y - S e r v i c e - E x c e l l e n c e

What is Next: Industry Day

Program office team will linger in the conference center
No formal structure, just an opportunity to process the updated

information & mingle

Vendors are welcome to mingle or depart the base

US government contractors are welcome to sign up for

an LMOC tour
Company must be vetted as having a current DD FM 441
Please talk with Ms. Vincent to see if your company is

eligible for a tour

If you have any questions about your one-on-one
session, please follow up with Ms. Vincent

Distribution A

I n t e g r i t y - S e r v i c e - E x c e l l e n c e

Questions

Distribution Statement A: Approved for public release. Distribution is unlimited.

Distribution A

I n t e g r i t y - S e r v i c e - E x c e l l e n c e

16