DOCUMENT

Announcement Industry Day (June)- AIT 23MAY23 cjd.pdf

OVERVIEW

Original Source
Contract Opportunity
Posted
May 25, 2023
Type
.pdf
Size
0.12MB

DOCUMENT PREVIEW

EXTRACTED TEXT

NAVAL SURFACE WARFARE CENTER - CARDEROCK DIVISION
INDUSTRY DAY FOR ALTERATION INSTALLATION TEAM (AIT) REQUIREMENT

The Naval Surface Warfare Center Carderock Division (NSWCCD) announces an Industry
Day for Alteration Installation Teams (AIT) support. This requirement involves the
purchase, storage, transportation and installation of modernization packages.
Government direction in the form of Boat Alterations (BOAT ALTs) and Liaison
Action Reports (LARs) detail the modernization efforts to be accomplished.
Installation of the modernization packages shall be conducted by Fly-Away teams who
shall accomplish installation pier-side at various military installations both
CONUS/OCONUS. The Fly-Away team(s) shall be comprised of individuals who possess
advanced knowledge of mechanical, electrical, electronic, structural systems and
Information Technology.

The contractor shall perform in a wide variety of locations both CONUS and OCONUS.
The expected work distribution by performance location is: Mid-Atlantic US (25%);
Southwest US (25%); Northeast US/Gulf Coast US/Northwest US/Other 10%, OCONUS
(40%). OCONUS locations typically include, but are not limited to; Bahrain,
Djibouti, Dubai, Greece, Guam, Italy, Japan, Spain, United Arab Emirates, Hawaii
and Alaska.

The government anticipates this requirement will be comprised of the following
three (3) functional task areas:

(1) Task A- Logistics/Material Support

Purchase, Kitting, Storage, Shipping/Transportation

(2) Task B- Alteration Installation

Advanced knowledge of mechanical, electrical, electronic, structural systems,

Information Technology.

Knowledge of Boat Alterations (BOAT ALT) and Liaison Action Report (LAR)

installations and their interrelationship to one another.

(3) Task C- Prototype

Partnering of Government and industry to install new technologies and

systems.

Reconfiguration of craft layout and systems interface and networking to meet

modernization requirements.

Tentative Program Highlights include:

Presentations from Subject Matter Experts
Presentations from the Contracting Department

This is an excellent opportunity to increase Industrys awareness about this
particular requirement.

Participants are encouraged to submit questions before the event. Questions should
be submitted to the Contracting Officer - Ms. Caroline (Xenia) Lira at
caroline.x.lira.civ@us.navy.mil.

During this event, the government will present information relevant to this matter
to allow questions/feedback.

Date and time of the event: Thursday 8 June, 2023 08:30 PST / 11:30 AM Eastern Time (US
and Canada)

To register for this event, please send an email to carlos.j.duran.civ@us.navy.mil
NLT Monday 5 June at 5:00 PM EST.

RSVP by 5:00 PM EST Monday 5 June at 5:00 PM EST by sending an email to:
POC: Carlos Duran carlos.j.duran.civ@us.navy.mil

Note: An email invitation with instructions to attend the event will be sent to
those companies that email the POC as stipulated above. Invitations will be sent
NLT 7 June.

This event is free of charge and VIRTUAL (DoD MS Teams Platform).