Maintenance Dredging Rudee Inlet
RUDEE2019
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
PROJECT TABLE OF CONTENTS
00 01 15
LIST OF DRAWINGS
DIVISION 01 - GENERAL REQUIREMENTS
01 22 00
01 30 00
01 32 01.00 10
01 33 00
01 35 26
01 42 00
01 45 00.00 10
01 45 00.15 10
01 50 00
01 57 20.00 10
MEASUREMENT AND PAYMENT
ADMINISTRATIVE REQUIREMENTS
PROJECT SCHEDULE
SUBMITTAL PROCEDURES
GOVERNMENTAL SAFETY REQUIREMENTS
SOURCES FOR REFERENCE PUBLICATIONS
QUALITY CONTROL
RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE (RMS CM)
TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS
ENVIRONMENTAL PROTECTION
DIVISION 35 - WATERWAY AND MARINE CONSTRUCTION
35 20 23
DREDGING
-- End of Project Table of Contents --
PROJECT TABLE OF CONTENTS Page 1
DRAFT, NOT FOR SOLICITATIONMaintenance Dredging Rudee Inlet
RUDEE2019
SECTION TABLE OF CONTENTS
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
SECTION 00 01 15
LIST OF DRAWINGS
04/19
PART 1 GENERAL
1.1 SUMMARY
1.2 CONTRACT DRAWINGS
PART 2 PRODUCTS (Not Used)
PART 3 EXECUTION (Not Used)
-- End of Section Table of Contents --
DOCUMENT 00 01 15 Page 1
DRAFT, NOT FOR SOLICITATIONMaintenance Dredging Rudee Inlet
RUDEE2019
SECTION 00 01 15
LIST OF DRAWINGS
04/19
PART 1 GENERAL
1.1 SUMMARY
1.2 CONTRACT DRAWINGS
Contract drawings are as follows:
This section lists the drawings for the project pursuant to contract clause
"DFARS 252.236-7001, Contract Drawings, Maps and Specifications."
SHEET NO. TITLE NORFOLK DISTRICT FILE NO.
RUDEE INLET FEDERAL NAVIGATION PROJECT:
1) Title Sheet RDI.2017-08-21.PS(1)
2) Mapping Sheet RDI.2017-08-21.PS(2)
3) Mapping Sheet RDI.2017-08-21.PS(3)
4) Resort Beach Placement Sheet RDI.2017-08-21.PS(4)
5) Resort Beach Placement Sheet RDI.2017-08-21.PS(5)
6) Croatan Beach Placement Sheet RDI.2017-08-21.PS(6)
7) Croatan Beach Placement Sheet RDI.2017-08-21.PS(7)
8) Dredging Area Detail Sheet RDI.2017-08-21.PS(8)
9) Dredging Area Detail Sheet RDI.2017-08-21.PS(9)
9) Dredging Profiles Detail Sheet RDI.2017-08-21.PS(10)
11) Dredging Profiles Detail Sheet RDI.2017-08-21.PS(11)
12) Bid Items and Quantity Estimate Sheet RDI.2017-08-21.PS(12)
13) Beach Profiles and Detail Sheet RDI.2017-08-21.PS(13)
14) Resort Beach Special Placement Sheet RDI.2017-08-21.PS(14)
PART 2 PRODUCTS (Not Used)
PART 3 EXECUTION (Not Used)
-- End of Section --
DOCUMENT 00 01 15 Page 2
DRAFT, NOT FOR SOLICITATIONMaintenance Dredging Rudee Inlet
RUDEE2019
SECTION TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
SECTION 01 22 00
MEASUREMENT AND PAYMENT
07/19
PART 1 GENERAL
1.1 REFERENCES
1.2 SUBMITTALS
1.3 LUMP SUM PAYMENT ITEMS
1.3.1 Payment Item No. 0001 Mobilization and Demobilization
1.3.1.1 Mobilization
1.3.1.2 Demobilization
1.3.2 Payment Item No. 0006 Cost of performing work without the
availability of Lake Wesley
1.3.3 Optional Payment Item No. 0008 The cost to alter the placement
location of material in Payment Item No. 0005 from the Resort
Beach Placement Area to the Croatan Beach Placement Area.
1.4 UNIT PRICE PAYMENT ITEMS
1.4.1 [Enter Appropriate Subpart Title Here]
WARNING: Text in tags exceeds the maximum length of 300 characters
1.4.2 Payment Item No. 0003 Maintenance dredging the Entrance
Channel Transition Area (from -14' to -15'+1' Mean Lower Low
Water), North Jetty Protection Area, and South Jetty Protection
Area with placement at the Resort Beach Placement Area
1.4.3 Payment Item No. 0004 Dredging the Outer Deposition Basin to
-18' Mean Lower Low Water with placement at the Resort Beach
Placement Area
1.4.4 Payment Item No. 0005 Dredging the Outer Deposition Basin from
-18' Mean Lower Low Water to -21'+1' Mean Lower Low Water with
placement at the Resort Beach Placement Area
1.4.5 Payment Item No. 0007 Contracting Officer Directed Standby Time
1.5 MISPLACED MATERIAL
1.6 EXCESSIVE DREDGING
1.7 MONTHLY PARTIAL PAYMENTS
PART 2 PRODUCTS (Not Applicable)
PART 3 EXECUTION (Not Applicable)
-- End of Section Table of Contents --
SECTION 01 22 00 Page 1
DRAFT, NOT FOR SOLICITATIONMaintenance Dredging Rudee Inlet
RUDEE2019
SECTION 01 22 00
MEASUREMENT AND PAYMENT
07/19
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the
extent referenced. The publications are referred to within the text by the
basic designation only.
U.S. ARMY CORPS OF ENGINEERS (USACE)
EM 1110-2-1003
(2015) Hydrographic Surveying Manual
1.2 SUBMITTALS
Not Used.
1.3 LUMP SUM PAYMENT ITEMS
Payment items for the work of this contract for which contract lump sum
payments will be made are listed in the BIDDING SCHEDULE and described
below. All costs for items of work, which are not specifically mentioned
to be included in a particular lump sum or unit price payment item, shall
be included in the listed lump sum item most closely associated with the
work involved. The lump sum price and payment made for each item listed
shall constitute full compensation for furnishing all plant, labor,
materials, and equipment, and performing any associated Contractor quality
control, environmental protection, meeting safety requirements, tests and
reports, and for performing all work required for which separate payment is
not otherwise provided.
1.3.1 Payment Item No. 0001 Mobilization and Demobilization
All costs connected with the mobilization and demobilization of all of the
Contractor's dredging plant and equipment as defined below will be paid for
at the contract lump sum price for this item. Sixty percent of the lump
sum price will be paid to the Contractor upon completion of his
mobilization at the work site. The remaining forty percent will be paid to
the Contractor upon completion of demobilization. In the event the
Contracting Officer considers that the amount in this item, sixty percent
which represents mobilization and forty percent which represents
demobilization, does not bear a reasonable relation to the cost of the work
in this contract, the Contracting Officer may require the Contractor to
produce cost data to justify this portion of the bid. Failure to justify
such price to the satisfaction of the Contracting Officer will result in
payment of actual mobilization costs, as determined by the Contracting
Officer, at the completion of mobilization, and actual demobilization
costs, as determined by the Contracting Officer, at the completion of
demobilization. The determination of the Contracting Officer is not subject
to appeal.
SECTION 01 22 00 Page 2
DRAFT, NOT FOR SOLICITATIONMaintenance Dredging Rudee Inlet
RUDEE2019
1.3.1.1 Mobilization
Mobilization shall include all costs for operations accomplished prior to
commencement of actual dredging operations. This shall include as a minimum
the following:
a. Transfer of dredge and attendant plant, barges and scows, and other
like equipment and machinery.
b. All initial installation of dredge-pipe
c. All costs for any other associated work that is necessary in advance
of the actual dredging operations.
d. Preparation of beach for access, and equipment handling to
accomplish placement on the beachfront placement areas.
1.3.1.2 Demobilization
Demobilization shall include general preparation for transfer of plant to
its home base.
1.3.2 Payment Item No. 0006 Cost of performing work without the
availability of Lake Wesley
Payment for the additional costs of performing the scheduled work without
the availability of Lake Wesley as a staging and safe harbor area for the
Contractor's plant and equipment shall be made as a "Lump Sum" (LS) price.
1.3.3 Optional Payment Item No. 0008 The cost to alter the placement
location of material in Payment Item No. 0005 from the Resort Beach Placement
Area to the Croatan Beach Placement Area.
Payment will be for the additional cost born by the Contractor to alter
ongoing dredging operations from placing the dredged material for Payment
Item No. 0005 on the Resort Beach Placement Area to the CROATAN BEACH
PLACEMENT AREA. This payment item shall include the cost of plant downtime
and the cost of mobilization and demobilization to shift plant and
equipment for operation at the optional Croatan Beach Placement Area. The
payment to perform this optional work shall be made as a Lump Sum.
1.4 UNIT PRICE PAYMENT ITEMS
Payment items for the work of this contract on which the contract
unit price payments will be made are listed in the BIDDING SCHEDULE and
described below. The unit price and payment made for each item listed
shall constitute full compensation for furnishing all plant, labor,
materials, and equipment, and performing any associated Contractor quality
control, environmental protection, meeting safety requirements, tests and
reports, and for performing all work required for each of the unit price
items.
1.4.1 [Enter Appropriate Subpart Title Here]1.4.1 Payment Item No. 0002
Maintenance dredging the Entrance Channel, the Entrance Channel Overlay
Transition Area (to -14' Mean Lower Low Water), the Entrance Channel Overlay
Outer Deposition Basin (to -14' Mean Lower Low Water), the Entrance Channel
Adjacent Sand Trap, and the Sand Trap with placement at the Resort Beach
Placement Area
Payment to be made for all costs associated with dredging shall include the
cost of removal, transportation and
RUDEE2019
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
PROJECT TABLE OF CONTENTS
00 01 15
LIST OF DRAWINGS
DIVISION 01 - GENERAL REQUIREMENTS
01 22 00
01 30 00
01 32 01.00 10
01 33 00
01 35 26
01 42 00
01 45 00.00 10
01 45 00.15 10
01 50 00
01 57 20.00 10
MEASUREMENT AND PAYMENT
ADMINISTRATIVE REQUIREMENTS
PROJECT SCHEDULE
SUBMITTAL PROCEDURES
GOVERNMENTAL SAFETY REQUIREMENTS
SOURCES FOR REFERENCE PUBLICATIONS
QUALITY CONTROL
RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE (RMS CM)
TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS
ENVIRONMENTAL PROTECTION
DIVISION 35 - WATERWAY AND MARINE CONSTRUCTION
35 20 23
DREDGING
-- End of Project Table of Contents --
PROJECT TABLE OF CONTENTS Page 1
DRAFT, NOT FOR SOLICITATIONMaintenance Dredging Rudee Inlet
RUDEE2019
SECTION TABLE OF CONTENTS
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
SECTION 00 01 15
LIST OF DRAWINGS
04/19
PART 1 GENERAL
1.1 SUMMARY
1.2 CONTRACT DRAWINGS
PART 2 PRODUCTS (Not Used)
PART 3 EXECUTION (Not Used)
-- End of Section Table of Contents --
DOCUMENT 00 01 15 Page 1
DRAFT, NOT FOR SOLICITATIONMaintenance Dredging Rudee Inlet
RUDEE2019
SECTION 00 01 15
LIST OF DRAWINGS
04/19
PART 1 GENERAL
1.1 SUMMARY
1.2 CONTRACT DRAWINGS
Contract drawings are as follows:
This section lists the drawings for the project pursuant to contract clause
"DFARS 252.236-7001, Contract Drawings, Maps and Specifications."
SHEET NO. TITLE NORFOLK DISTRICT FILE NO.
RUDEE INLET FEDERAL NAVIGATION PROJECT:
1) Title Sheet RDI.2017-08-21.PS(1)
2) Mapping Sheet RDI.2017-08-21.PS(2)
3) Mapping Sheet RDI.2017-08-21.PS(3)
4) Resort Beach Placement Sheet RDI.2017-08-21.PS(4)
5) Resort Beach Placement Sheet RDI.2017-08-21.PS(5)
6) Croatan Beach Placement Sheet RDI.2017-08-21.PS(6)
7) Croatan Beach Placement Sheet RDI.2017-08-21.PS(7)
8) Dredging Area Detail Sheet RDI.2017-08-21.PS(8)
9) Dredging Area Detail Sheet RDI.2017-08-21.PS(9)
9) Dredging Profiles Detail Sheet RDI.2017-08-21.PS(10)
11) Dredging Profiles Detail Sheet RDI.2017-08-21.PS(11)
12) Bid Items and Quantity Estimate Sheet RDI.2017-08-21.PS(12)
13) Beach Profiles and Detail Sheet RDI.2017-08-21.PS(13)
14) Resort Beach Special Placement Sheet RDI.2017-08-21.PS(14)
PART 2 PRODUCTS (Not Used)
PART 3 EXECUTION (Not Used)
-- End of Section --
DOCUMENT 00 01 15 Page 2
DRAFT, NOT FOR SOLICITATIONMaintenance Dredging Rudee Inlet
RUDEE2019
SECTION TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
SECTION 01 22 00
MEASUREMENT AND PAYMENT
07/19
PART 1 GENERAL
1.1 REFERENCES
1.2 SUBMITTALS
1.3 LUMP SUM PAYMENT ITEMS
1.3.1 Payment Item No. 0001 Mobilization and Demobilization
1.3.1.1 Mobilization
1.3.1.2 Demobilization
1.3.2 Payment Item No. 0006 Cost of performing work without the
availability of Lake Wesley
1.3.3 Optional Payment Item No. 0008 The cost to alter the placement
location of material in Payment Item No. 0005 from the Resort
Beach Placement Area to the Croatan Beach Placement Area.
1.4 UNIT PRICE PAYMENT ITEMS
1.4.1 [Enter Appropriate Subpart Title Here]
WARNING: Text in tags exceeds the maximum length of 300 characters
1.4.2 Payment Item No. 0003 Maintenance dredging the Entrance
Channel Transition Area (from -14' to -15'+1' Mean Lower Low
Water), North Jetty Protection Area, and South Jetty Protection
Area with placement at the Resort Beach Placement Area
1.4.3 Payment Item No. 0004 Dredging the Outer Deposition Basin to
-18' Mean Lower Low Water with placement at the Resort Beach
Placement Area
1.4.4 Payment Item No. 0005 Dredging the Outer Deposition Basin from
-18' Mean Lower Low Water to -21'+1' Mean Lower Low Water with
placement at the Resort Beach Placement Area
1.4.5 Payment Item No. 0007 Contracting Officer Directed Standby Time
1.5 MISPLACED MATERIAL
1.6 EXCESSIVE DREDGING
1.7 MONTHLY PARTIAL PAYMENTS
PART 2 PRODUCTS (Not Applicable)
PART 3 EXECUTION (Not Applicable)
-- End of Section Table of Contents --
SECTION 01 22 00 Page 1
DRAFT, NOT FOR SOLICITATIONMaintenance Dredging Rudee Inlet
RUDEE2019
SECTION 01 22 00
MEASUREMENT AND PAYMENT
07/19
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the
extent referenced. The publications are referred to within the text by the
basic designation only.
U.S. ARMY CORPS OF ENGINEERS (USACE)
EM 1110-2-1003
(2015) Hydrographic Surveying Manual
1.2 SUBMITTALS
Not Used.
1.3 LUMP SUM PAYMENT ITEMS
Payment items for the work of this contract for which contract lump sum
payments will be made are listed in the BIDDING SCHEDULE and described
below. All costs for items of work, which are not specifically mentioned
to be included in a particular lump sum or unit price payment item, shall
be included in the listed lump sum item most closely associated with the
work involved. The lump sum price and payment made for each item listed
shall constitute full compensation for furnishing all plant, labor,
materials, and equipment, and performing any associated Contractor quality
control, environmental protection, meeting safety requirements, tests and
reports, and for performing all work required for which separate payment is
not otherwise provided.
1.3.1 Payment Item No. 0001 Mobilization and Demobilization
All costs connected with the mobilization and demobilization of all of the
Contractor's dredging plant and equipment as defined below will be paid for
at the contract lump sum price for this item. Sixty percent of the lump
sum price will be paid to the Contractor upon completion of his
mobilization at the work site. The remaining forty percent will be paid to
the Contractor upon completion of demobilization. In the event the
Contracting Officer considers that the amount in this item, sixty percent
which represents mobilization and forty percent which represents
demobilization, does not bear a reasonable relation to the cost of the work
in this contract, the Contracting Officer may require the Contractor to
produce cost data to justify this portion of the bid. Failure to justify
such price to the satisfaction of the Contracting Officer will result in
payment of actual mobilization costs, as determined by the Contracting
Officer, at the completion of mobilization, and actual demobilization
costs, as determined by the Contracting Officer, at the completion of
demobilization. The determination of the Contracting Officer is not subject
to appeal.
SECTION 01 22 00 Page 2
DRAFT, NOT FOR SOLICITATIONMaintenance Dredging Rudee Inlet
RUDEE2019
1.3.1.1 Mobilization
Mobilization shall include all costs for operations accomplished prior to
commencement of actual dredging operations. This shall include as a minimum
the following:
a. Transfer of dredge and attendant plant, barges and scows, and other
like equipment and machinery.
b. All initial installation of dredge-pipe
c. All costs for any other associated work that is necessary in advance
of the actual dredging operations.
d. Preparation of beach for access, and equipment handling to
accomplish placement on the beachfront placement areas.
1.3.1.2 Demobilization
Demobilization shall include general preparation for transfer of plant to
its home base.
1.3.2 Payment Item No. 0006 Cost of performing work without the
availability of Lake Wesley
Payment for the additional costs of performing the scheduled work without
the availability of Lake Wesley as a staging and safe harbor area for the
Contractor's plant and equipment shall be made as a "Lump Sum" (LS) price.
1.3.3 Optional Payment Item No. 0008 The cost to alter the placement
location of material in Payment Item No. 0005 from the Resort Beach Placement
Area to the Croatan Beach Placement Area.
Payment will be for the additional cost born by the Contractor to alter
ongoing dredging operations from placing the dredged material for Payment
Item No. 0005 on the Resort Beach Placement Area to the CROATAN BEACH
PLACEMENT AREA. This payment item shall include the cost of plant downtime
and the cost of mobilization and demobilization to shift plant and
equipment for operation at the optional Croatan Beach Placement Area. The
payment to perform this optional work shall be made as a Lump Sum.
1.4 UNIT PRICE PAYMENT ITEMS
Payment items for the work of this contract on which the contract
unit price payments will be made are listed in the BIDDING SCHEDULE and
described below. The unit price and payment made for each item listed
shall constitute full compensation for furnishing all plant, labor,
materials, and equipment, and performing any associated Contractor quality
control, environmental protection, meeting safety requirements, tests and
reports, and for performing all work required for each of the unit price
items.
1.4.1 [Enter Appropriate Subpart Title Here]1.4.1 Payment Item No. 0002
Maintenance dredging the Entrance Channel, the Entrance Channel Overlay
Transition Area (to -14' Mean Lower Low Water), the Entrance Channel Overlay
Outer Deposition Basin (to -14' Mean Lower Low Water), the Entrance Channel
Adjacent Sand Trap, and the Sand Trap with placement at the Resort Beach
Placement Area
Payment to be made for all costs associated with dredging shall include the
cost of removal, transportation and