Search Documents

24-B-5004 02NOV2023 Industry Day Slides for CIEE Pre-Dredging Phase 1C.pdf

Posted: Oct. 30, 2023 • Type: .pdf • Size: 2.14MB

Overview

Profiled People
Summary
Industry day presentation for Craney Island Eastward Expansion (CIEE) Pre-Dredging Phase 1C provides a comprehensive overview of the project, including its history, major construction milestones, potential placement sites, scope of work, critical tasks summary, key construction parameters, and contract line-item number descriptions.

The presentation outlines the authorized project under the Water Resources Development Act (WRDA) 2007 and the various contracts awarded for different construction stages. It details the dredging requirements for the main dike footprint and access channels, along with environmental considerations such as water quality monitoring and endangered species protection.

The presentation highlights key dates for critical tasks completion, target award date, and construction physical completion timeline. It emphasizes the importance of compliance with environmental regulations, including water quality monitoring protocols and mitigation measures.

Additionally, it provides information on acquisition strategy for future procurement opportunities related to dredging construction. It also includes contact information for the Norfolk District Small Business Deputy and encourages open discussion on the project.

Document Preview