DOCUMENT
20220829 Industry Day Mechanical Final.pdf
OVERVIEW
Original Source
Contract Opportunity
Related Opportunity
Related Agency
Posted
Sept. 20, 2022
Type
.pdf
Size
2.48MB
DOCUMENT PREVIEW
EXTRACTED TEXT
UH-60V Black Hawk
Mechanical A-Kit Full Rate Production
Industry Day Presentation
Mrs. Hillary Pierce
Contracting Officer
ACC RSA
LTC Howard Swanson
Product Manager
UH-60V
Mr. Wesley Dixon
Systems Engineering Lead
UH-60V
29 August 2022
DISTRIBUTION A. Approved for public release: distribution unlimited.
UNCLASSIFIED
Administrative Announcements
One on one and/or breakout sessions will not be conducted.
Please hold all questions during the brief. New questions may be
submitted on the Question form provided with the registration for this
event.
A moderator will be monitoring the Chat and Hands Up functions in MS
TEAMS. The USG may call on participants with Hands Up or that have
submitted Chat requests; however, the USG may choose to defer
answering any and all questions received during industry day to after the
Industry Day.
The last day to submit questions to the Contracting Office is 6 September
2022.
DISTRIBUTION A. Approved for public release: distribution unlimited.
UNCLASSIFIED
Agenda
UH60V Blackhawk Overview & Configuration
Full Rate Production Approach
Contracting Overview
Mechanical A-Kit Definition
Example of Center Console A-Kit Installation
Significance of Kitting List Dash Numbers and Drawing Tree
Questions and Closing Comments
DISTRIBUTION A. Approved for public release: distribution unlimited.
UNCLASSIFIED
Program Overview
LTC Howard Swanson
Product Manager, UH-60V
DISTRIBUTION A. Approved for public release: distribution unlimited.
UNCLASSIFIED
UH-60V Black Hawk Overview
A need exists to convert existing UH-60 BLACK HAWK helicopters
to meet evolving interoperability and survivability requirements
extending beyond 2035. The UH-60M currently meets these
requirements. However, the existing UH-60Ls expected to remain
in the fleet do not fully meet these requirements.
The UH-60V BLACK HAWK is designed to update the existing
UH-60L analog architecture to a digital infrastructure enabling
the upgraded aircraft to have a similar Pilot-Vehicle Interface
(PVI) to the UH-60M.
The UH-60V program will modernize and increase
interoperability by installing a digital cockpit, data bussing and
upgrading the communication/identification suite, improving
navigation guidance with a civil Global Positioning System
(GPS), and integrating Aircraft Survivability Equipment (ASE),
digital moving map, and Joint Variable Message Format (JVMF)
messaging.
The open system architecture/FACE-aligned cockpit
design provides digital multifunctional displays, allows
for rapid future integration, and enhances situational
awareness for aviation Soldiers.
DISTRIBUTION A. Approved for public release: distribution unlimited.
UNCLASSIFIED
UH-60V Baseline Configuration
Digital Cockpit
Unique Integrated Architecture
IFR Capability
Mission Capability
VOR/TCN capable
Can file GPS (/G)
Can file RNP (/R)
SIDs/STARs/IAPs
LPV / LNAV/ LNVN Approach Capable
Tactical GPS recovery LNAV/VNAV
integrated with AMPS
Tactical Recovery on the fly LNAV/VNAV
Conventional enroute
navigation
Search and rescue pattern
Moving map display
Worldwide database
Navigation to a moving point
Dynamic mission planning
DISTRIBUTION A. Approved for public release: distribution unlimited.
UNCLASSIFIED
UH-60V Production Approach
Corpus Christi Army Depot to depopulate 60L model aircraft and
manufacture 60V model using A-kits and B-kit items
Two A-kits procured via separate Army Contracting Command
contracts
Electrical A-kit, a package of harness subassemblies which will provide electrical
connectivity between LRUs and the aircraft
Mechanical A-kit, a package of electro-mechanical assemblies such as control panels
and circuit breaker panels, and mechanical components which are required to mount
the LRUs in the aircraft
B-kit items such as MFDs, CDUs, and TRMCs will be drawn from the
Army supply system
DISTRIBUTION A. Approved for public release: distribution unlimited.
7
UNCLASSIFIED
Contracting Overview
Mrs. Hillary Pierce
Contracting Officer
ACC-RSA
Distribution Statement A- Approved for public release; distribution is unlimited; as submitted under ACC-RSA Public Release Authorization 2022-038.
UNCLASSIFIED
Solicitation Basics
Technical Data can only be distributed to contractors who have a current
DD 2345, Militarily Critical Technical Data Agreement on file with the
Defense Logistics Information Service (DLIS).
Build-to-print. Technical drawings will be provided as Government
Furnished Information.
Contractors are to manufacture and deliver A-Kits. The scope of work
does not include any installation of A-Kits on the aircraft.
Distribution Statement A- Approved for public release; distribution is unlimited; as submitted under ACC-RSA Public Release Authorization 2022-038.
UNCLASSIFIED
CLIN Structure
CLIN 0001 First Article
CLIN 0002 UH-60V Mechanical A-Kit Production Units
CLIN 0003 Physical Configuration Audit
CLIN 0004 Shipping to locations to be determined at time of delivery order
Corpus Christi Army Depot, TX or Redstone Arsenal, AL
CLIN 0005 Contract Data Requirements List
CLIN 0006 CSDR Contract Data Requirements List
Note: First Article may be accepted as one (1) of the production units for
the initial order of ten (10) UH-60V Mechanical A-Kits.
Distribution Statement A- Approved for public release; distribution is unlimited; as submitted under ACC-RSA Public Release Authorization 2022-038.
UNCLASSIFIED
Source Selection
Best Value Trade-off
Factors include:
Technical
Subfactor 1 Production Approach
Subfactor 2 Manufacturing Resources
Subfactor 3 Management Plan
Past Performance
Price
Distribution Statement A- Approved for public release; distribution is unlimited; as submitted under ACC-RSA Public Release Authorization 2022-038.
UNCLASSIFIED
Procurement Integrated Enterprise Environment
Proposals will be submitted through the Procurement Integrated
Enterprise Environment (PIEE).
There are two vendor roles (Proposal Manager, Proposal View Only) for
the PIEE Solicitation Module. The Proposal Manager role is required to
submit an offer to a solicitation posted in the PIEE Solicitation Module.
Uploads are restricted to 1.9 gigabytes (GB). No limit on total number of
uploads.
The system provides a notification at the top of the screen upon
submission. Offerors are encouraged to print that page and maintain the
record. Offerors are responsible for verifying proposals are received
before the proposal submission due date and time.
Distribution Statement A- Approved for public release; distribution is unlimited; as submitted under ACC-RSA Public Release Authorization 2022-038.
UNCLASSIFIED
Technical Factor
Subfactor 1 Production Approach
Level of understanding of and compliance with the technical data package (drawings).
First Article Inspection
Subcontractor qualification and management
Supply Chain
Kitting and Packaging
Experience with similar complexity and specifications
Distribution Statement A- Approved for public release; distribution is unlimited; as submitted under ACC-RSA Public Release Authorization 2022-038.
UNCLASSIFIED
Technical Factor (continued)
Subfactor 2 Manufacturing resources
Facilities, Equipment and Tooling
Qualifications, skills and availability of manpower
Subfactor 3 Management Plan
Production Management Plan
Critical parameters and problem areas
Configuration Control
Safeguarding covered defense information
Distribution Statement A- Approved for public release; distribution is unlimited; as submitted under ACC-RSA Public Release Authorization 2022-038.
UNCLASSIFIED
Past Performance Factor
Summary of relevant past performance limited to Five (5) Government
and/or Commercial contracts for Prime and One (1) contract for each
major subcontractor.
A major subcontractor is defined as a member of an Offerors overall team
who is expected to perform 20 percent or more of the proposed effort; a
critical subcontractor is one who will perform ion vapor deposition or heat
treatment processes, or a supplier of a printed circuit board or circuit card
assembly.
Past Performance Questionnaire Forms must be completed and submitted
for each contract identified.
Distribution Statement A- Approved for public release; distribution is unlimited; as submitted under ACC-RSA Public Release Authorization 2022-038.
UNCLASSIFIED
Price
The USG provided Pricing Template (Attachment 0008).
Minimum quantity is 10 A-Kits
Maximum quantity is 240 A-Kits
All CLINs will be Firm-Fixed-Price.
A Price Matrix will be generated for CLIN 0002 using the Offeror provided
data points.
A best estimated quantity of 48/year is provided for estimating purposes only.
The price shall be valid for 180 days.
Distribution Statement A- Approved for public release; distribution is unlimited; as submitted under ACC-RSA Public Release Authorization 2022-038.
UNCLASSIFIED
ASSIST2Industry
The USG plans on using ASSIST, Acquisition Source Selection
Interactive Support Tool to support evaluation and source selection
processes.
Offerors need to provide contact information for two (2) individuals
responsible for receiving and responding to Government Evaluation
Notices.
This tool does not interface with PIEE and any roles in PIEE are not
related to ASSIST.
Distribution Statement A- Approved for public release; distribution is unlimited; as submitted under ACC-RSA Public Release Authorization 2022-038.
UNCLASSIFIED
Contracting Strategy
8(a) Small Business Set Aside
NAICS 336413 with a size standard of 1250 employees.
Single Award, Indefinite Delivery, Indefinite Quantity contract with a Five-
Year Ordering Period.
request for proposal.
UH-60V
Mechanical A-Kit Full Rate Production
Industry Day Presentation
Mrs. Hillary Pierce
Contracting Officer
ACC RSA
LTC Howard Swanson
Product Manager
UH-60V
Mr. Wesley Dixon
Systems Engineering Lead
UH-60V
29 August 2022
DISTRIBUTION A. Approved for public release: distribution unlimited.
UNCLASSIFIED
Administrative Announcements
One on one and/or breakout sessions will not be conducted.
Please hold all questions during the brief. New questions may be
submitted on the Question form provided with the registration for this
event.
A moderator will be monitoring the Chat and Hands Up functions in MS
TEAMS. The USG may call on participants with Hands Up or that have
submitted Chat requests; however, the USG may choose to defer
answering any and all questions received during industry day to after the
Industry Day.
The last day to submit questions to the Contracting Office is 6 September
2022.
DISTRIBUTION A. Approved for public release: distribution unlimited.
UNCLASSIFIED
Agenda
UH60V Blackhawk Overview & Configuration
Full Rate Production Approach
Contracting Overview
Mechanical A-Kit Definition
Example of Center Console A-Kit Installation
Significance of Kitting List Dash Numbers and Drawing Tree
Questions and Closing Comments
DISTRIBUTION A. Approved for public release: distribution unlimited.
UNCLASSIFIED
Program Overview
LTC Howard Swanson
Product Manager, UH-60V
DISTRIBUTION A. Approved for public release: distribution unlimited.
UNCLASSIFIED
UH-60V Black Hawk Overview
A need exists to convert existing UH-60 BLACK HAWK helicopters
to meet evolving interoperability and survivability requirements
extending beyond 2035. The UH-60M currently meets these
requirements. However, the existing UH-60Ls expected to remain
in the fleet do not fully meet these requirements.
The UH-60V BLACK HAWK is designed to update the existing
UH-60L analog architecture to a digital infrastructure enabling
the upgraded aircraft to have a similar Pilot-Vehicle Interface
(PVI) to the UH-60M.
The UH-60V program will modernize and increase
interoperability by installing a digital cockpit, data bussing and
upgrading the communication/identification suite, improving
navigation guidance with a civil Global Positioning System
(GPS), and integrating Aircraft Survivability Equipment (ASE),
digital moving map, and Joint Variable Message Format (JVMF)
messaging.
The open system architecture/FACE-aligned cockpit
design provides digital multifunctional displays, allows
for rapid future integration, and enhances situational
awareness for aviation Soldiers.
DISTRIBUTION A. Approved for public release: distribution unlimited.
UNCLASSIFIED
UH-60V Baseline Configuration
Digital Cockpit
Unique Integrated Architecture
IFR Capability
Mission Capability
VOR/TCN capable
Can file GPS (/G)
Can file RNP (/R)
SIDs/STARs/IAPs
LPV / LNAV/ LNVN Approach Capable
Tactical GPS recovery LNAV/VNAV
integrated with AMPS
Tactical Recovery on the fly LNAV/VNAV
Conventional enroute
navigation
Search and rescue pattern
Moving map display
Worldwide database
Navigation to a moving point
Dynamic mission planning
DISTRIBUTION A. Approved for public release: distribution unlimited.
UNCLASSIFIED
UH-60V Production Approach
Corpus Christi Army Depot to depopulate 60L model aircraft and
manufacture 60V model using A-kits and B-kit items
Two A-kits procured via separate Army Contracting Command
contracts
Electrical A-kit, a package of harness subassemblies which will provide electrical
connectivity between LRUs and the aircraft
Mechanical A-kit, a package of electro-mechanical assemblies such as control panels
and circuit breaker panels, and mechanical components which are required to mount
the LRUs in the aircraft
B-kit items such as MFDs, CDUs, and TRMCs will be drawn from the
Army supply system
DISTRIBUTION A. Approved for public release: distribution unlimited.
7
UNCLASSIFIED
Contracting Overview
Mrs. Hillary Pierce
Contracting Officer
ACC-RSA
Distribution Statement A- Approved for public release; distribution is unlimited; as submitted under ACC-RSA Public Release Authorization 2022-038.
UNCLASSIFIED
Solicitation Basics
Technical Data can only be distributed to contractors who have a current
DD 2345, Militarily Critical Technical Data Agreement on file with the
Defense Logistics Information Service (DLIS).
Build-to-print. Technical drawings will be provided as Government
Furnished Information.
Contractors are to manufacture and deliver A-Kits. The scope of work
does not include any installation of A-Kits on the aircraft.
Distribution Statement A- Approved for public release; distribution is unlimited; as submitted under ACC-RSA Public Release Authorization 2022-038.
UNCLASSIFIED
CLIN Structure
CLIN 0001 First Article
CLIN 0002 UH-60V Mechanical A-Kit Production Units
CLIN 0003 Physical Configuration Audit
CLIN 0004 Shipping to locations to be determined at time of delivery order
Corpus Christi Army Depot, TX or Redstone Arsenal, AL
CLIN 0005 Contract Data Requirements List
CLIN 0006 CSDR Contract Data Requirements List
Note: First Article may be accepted as one (1) of the production units for
the initial order of ten (10) UH-60V Mechanical A-Kits.
Distribution Statement A- Approved for public release; distribution is unlimited; as submitted under ACC-RSA Public Release Authorization 2022-038.
UNCLASSIFIED
Source Selection
Best Value Trade-off
Factors include:
Technical
Subfactor 1 Production Approach
Subfactor 2 Manufacturing Resources
Subfactor 3 Management Plan
Past Performance
Price
Distribution Statement A- Approved for public release; distribution is unlimited; as submitted under ACC-RSA Public Release Authorization 2022-038.
UNCLASSIFIED
Procurement Integrated Enterprise Environment
Proposals will be submitted through the Procurement Integrated
Enterprise Environment (PIEE).
There are two vendor roles (Proposal Manager, Proposal View Only) for
the PIEE Solicitation Module. The Proposal Manager role is required to
submit an offer to a solicitation posted in the PIEE Solicitation Module.
Uploads are restricted to 1.9 gigabytes (GB). No limit on total number of
uploads.
The system provides a notification at the top of the screen upon
submission. Offerors are encouraged to print that page and maintain the
record. Offerors are responsible for verifying proposals are received
before the proposal submission due date and time.
Distribution Statement A- Approved for public release; distribution is unlimited; as submitted under ACC-RSA Public Release Authorization 2022-038.
UNCLASSIFIED
Technical Factor
Subfactor 1 Production Approach
Level of understanding of and compliance with the technical data package (drawings).
First Article Inspection
Subcontractor qualification and management
Supply Chain
Kitting and Packaging
Experience with similar complexity and specifications
Distribution Statement A- Approved for public release; distribution is unlimited; as submitted under ACC-RSA Public Release Authorization 2022-038.
UNCLASSIFIED
Technical Factor (continued)
Subfactor 2 Manufacturing resources
Facilities, Equipment and Tooling
Qualifications, skills and availability of manpower
Subfactor 3 Management Plan
Production Management Plan
Critical parameters and problem areas
Configuration Control
Safeguarding covered defense information
Distribution Statement A- Approved for public release; distribution is unlimited; as submitted under ACC-RSA Public Release Authorization 2022-038.
UNCLASSIFIED
Past Performance Factor
Summary of relevant past performance limited to Five (5) Government
and/or Commercial contracts for Prime and One (1) contract for each
major subcontractor.
A major subcontractor is defined as a member of an Offerors overall team
who is expected to perform 20 percent or more of the proposed effort; a
critical subcontractor is one who will perform ion vapor deposition or heat
treatment processes, or a supplier of a printed circuit board or circuit card
assembly.
Past Performance Questionnaire Forms must be completed and submitted
for each contract identified.
Distribution Statement A- Approved for public release; distribution is unlimited; as submitted under ACC-RSA Public Release Authorization 2022-038.
UNCLASSIFIED
Price
The USG provided Pricing Template (Attachment 0008).
Minimum quantity is 10 A-Kits
Maximum quantity is 240 A-Kits
All CLINs will be Firm-Fixed-Price.
A Price Matrix will be generated for CLIN 0002 using the Offeror provided
data points.
A best estimated quantity of 48/year is provided for estimating purposes only.
The price shall be valid for 180 days.
Distribution Statement A- Approved for public release; distribution is unlimited; as submitted under ACC-RSA Public Release Authorization 2022-038.
UNCLASSIFIED
ASSIST2Industry
The USG plans on using ASSIST, Acquisition Source Selection
Interactive Support Tool to support evaluation and source selection
processes.
Offerors need to provide contact information for two (2) individuals
responsible for receiving and responding to Government Evaluation
Notices.
This tool does not interface with PIEE and any roles in PIEE are not
related to ASSIST.
Distribution Statement A- Approved for public release; distribution is unlimited; as submitted under ACC-RSA Public Release Authorization 2022-038.
UNCLASSIFIED
Contracting Strategy
8(a) Small Business Set Aside
NAICS 336413 with a size standard of 1250 employees.
Single Award, Indefinite Delivery, Indefinite Quantity contract with a Five-
Year Ordering Period.
request for proposal.
UH-60V
Show All