Search Documents

19 November Industry Day Slides - Final.pptx

Posted: Dec. 30, 2019 • Type: .pptx • Size: 3.83MB

Overview

Profiled People
Summary
presentation from the Integration Support Contract (ISC) 2.0 Industry Day held at the POE Conference Center on November 19, 2019. The presentation outlines the rules of engagement for the event and introduces the program team, including Program Manager Alex Nebeker and PCO Christopher Thomas. It provides objectives such as conducting market research, exchanging information prior to the draft RFP, and gathering industry suggestions. The information shared during the event may influence the acquisition strategy.

Key details include the contract specifics for ISC 2.0, which involves providing engineering, integration, and professional services support to ICBM Systems Directorate and other program offices. The contract has a ceiling of $12 billion with a contract length extending from June 2021 to June 2039, including base periods and option periods.

The presentation also covers:
- Task order structure
- Acquisition strategy
- Small business participation evaluation criteria
- Data and IP strategy
- Security considerations
- Evaluation factors for source selection

It includes a breakdown of task orders related to:
- MMIII sustainment
- GBSD enterprise support
- Integration efforts

Additionally, it highlights specific clauses considered such as rate reopener clause and enabling clause between prime contractor and support contractors.

Document Preview