DOCUMENT

04-12 SOW Attachment 12 - HEFP KERRVILLE- EHRM Readiness Infrastructure Self-Assessment.pdf

OVERVIEW

Original Source
Contract Opportunity
Date Originally Posted
Nov. 15, 2021, 1:31 p.m.
Type
.pdf
Size
0.18MB
Profiled People
None

DOCUMENT PREVIEW

EXTRACTED TEXT

LocationNameBuildingRoomCablingPatch PanelsFiber671A4KERRVILLE BLDG 11STX11116AXXX671A4KERRVILLE BLDG 11STX11141AXXX671A4KERRVILLE BLDG 11STX11121XXX671A4KERRVILLE BLDG 11STX11205AXXX671A4KERRVILLE BLDG 11STX11267AXXX671A4KERRVILLE BLDG 11STX11227AXXX671A4KERRVILLE BLDG 11STX11344AXXX671A4KERRVILLE BLDG 11STX11381AXXX671A4KERRVILLE BLDG 11STX113CXXX671A4KERRVILLE BLDG 11STX11405AN/AN/AX671A4KERRVILLE BLDG 11STX11481N/AN/AN/A671A4KERRVILLE BLDG 11STX11441N/AN/AN/A671A4KERRVILLE BLDG 11STX11506AXXX671A4KERRVILLE BLDG 11STX11575XXX671A4KERRVILLE BLDG 11STX11539XXX671A4KERRVILLE BLDG 11STX11606AXXX671A4KERRVILLE BLDG 11STX11676AXXX671A4KERRVILLE BLDG 11STX11639XXX671A4KERRVILLE BLDG 11STX11703AXXX671A4KERRVILLE BLDG 11STX11036XXX671A4KERRVILLE BLDG 11STX11032XXX671A4KERRVILLE BLDG 11STX11035XXX671A4KERRVILLE BLDG 18STX18111XXX671A4KERRVILLE BLDG 2STX2119XXX671A4KERRVILLE BLDG 22STX22102N/AN/AN/A671A4KERRVILLE BLDG 29STX2920AXXX671A4KERRVILLE BLDG 46STX46100XXX671A4KERRVILLE BLDG 96STX961A107XXX671A4KERRVILLE BLDG 96STX961B140XXX671A4KERRVILLE BLDG 96STX962A109XXX671A4KERRVILLE BLDG 96STX962B141XXX272728Data CenterBuildingRoomSpaceHVACCable DistroKerrvilleSTX11019DNOXXX~included in scope of NRM projectNO~not included in scopeX*~included in scope only because space will be addressed; if space remains as is, component is adequate as isTR NotesFiber – site only has one single path; upgrades with B path was included into the large project. Site should look at redundant path to out buildings if it’s too far awayPower- Both Normal and Emergency power should be added where availableData Center NotesGeneral Notes *306SF about 18ftx17ft*Site only has one UPS for DC; One UPS currently sits in room 020A. Second UPS will go into adjacent room. Site needs to look at adjacent room 020 users be relocated somewhere else. Cooling may need to be looked at by AE for UPS rooms.*CRACs sit in Data Center – both CRACs need to be replaced due to age. Size is adequate. System redundancy is not stable.*Data Center is in orange (in screen show below); L-shaped yellow area are below exists now – drawings are not updatedJSA~Enough space, cooling and power but has risk due to cooling redundancy is unstableFDS~Enough space, cooling and power but has risk due to cooling redundancy is unstableJSA & FDS PowerBondingUPSDedicated CoolingTempHumidityRacks SensorsSpaceNotesXXXXXXXX-RELOCATErelocating to 1st flr consolidated roomXXXXXXXX-RELOCATErelocating to 1st flr consolidated roomXXXXXXXX-RELOCATErelocating to 1st flr consolidated roomXXXXXXXX-RELOCATErelocating to 2nd flr consolidated roomXXXXXXXX-RELOCATErelocating to 2nd flr consolidated roomXXXXXXXX-RELOCATErelocating to 2nd flr consolidated roomXXXXXXXX-RELOCATErelocating to 3rd flr consolidated roomXXXXXXXX-RELOCATErelocating to 3rd flr consolidated roomXXXXXXXX-RELOCATErelocating to 3rd flr consolidated roomN/AN/AN/AN/AN/AN/AN/AN/Aconsolidation of rooms completed within 671A4-18-122N/AN/AN/AN/AN/AN/AN/AN/Aconsolidation of rooms completed within 671A4-18-122N/AN/AN/AN/AN/AN/AN/AN/Aconsolidation of rooms completed within 671A4-18-122XXXXXXXX-RELOCATErelocating to 5th flr consolidated roomXXXXXXXX-RELOCATErelocating to 5th flr consolidated roomXXXXXXXX-RELOCATErelocating to 5th flr consolidated roomXXXXXXXX-RELOCATErelocating to 6th flr consolidated roomXXXXXXXX-RELOCATErelocating to 6th flr consolidated roomXXXXXXXX-RELOCATErelocating to 6th flr consolidated roomXXXXXXXX-RELOCATErelocating to new 7th flr roomXXXXXXXX-RELOCATErelocating to basement consolidated roomXXXXXXXX-RELOCATErelocating to basement consolidated roomXXXXXXXX-RELOCATErelocating to basement consolidated roomXXXXXXXX-EXPANDXXXXXXXX-EXPANDN/AN/AN/AN/AN/AN/AN/AN/ANot in scope - Paint shop. Fed from Building Building 29XXXXXXXX-RELOCATEXXXXXXXX-EXPANDXXXXXXXX-EXPANDXXXXXXXX-EXPANDXXXXXXXX-RELOCATEXXXXXXXX-EXPAND272727272727276-EXPAND; 12-RELOCATEWANUPSXX~included in scope only because space will be addressed; if space remains as is, component is adequate as isFiber – site only has one single path; upgrades with B path was included into the large project. Site should look at redundant path to out buildings if it’s too far away *Site only has one UPS for DC; One UPS currently sits in room 020A. Second UPS will go into adjacent room. Site needs to look at adjacent room 020 users be relocated somewhere else. Cooling may need to be looked at by AE for UPS rooms. consolidation of rooms completed within 671A4-18-122consolidation of rooms completed within 671A4-18-122consolidation of rooms completed within 671A4-18-122Not in scope - Paint shop. Fed from Building Building 29