Overview

Government Description
Painting and steel repairs to the railroad bridge, cape cod canal, buzzards bay, MA. Includes blast cleaning all metalwork of the vertical lift railroad bridge down to bare metal and application of a high-performance, three-coat paint system using solvent cleaning (SSPC SP 1) and commercial blast cleaning (sspc sp 6/nace no.3). Limited steel repairs will be performed at the towers and center span, with the bridge required to remain properly balanced at all times, including installation of balance blocks on counterweights as needed. The project will be coordinated with mbta, mass coastal railroad, and the cape cod canal marine traffic controller to maintain open navigation channels and scheduled train operations throughout the work.
Place of Performance
Buzzards Bay, MA 2532 United States
Pricing
Fixed Price
Set Aside
None
Extent Competed
Full And Open Competition
Analysis Notes
Amendment Since initial award the Potential End Date has been extended from 11/15/26 to 12/27/26.
Future Set Aside Approximately 83% of recent NAICS 238320 contracts awarded by USA are set aside even though this Definitive Contract was not, indicating a potential higher likelihood that future purchases may be set aside for a small business
Atlas Painting And Sheeting was awarded Definitive Contract W912WJ25C0004 (W912WJ-25-C-0004) for Bridge Painting & Steel Repairs, Cape Cod Canal, MA worth up to $19,690,000 by USACE New England District in May 2025. The contract has a duration of 1 year 7 months and was awarded through solicitation Cape Cod Canal, Buzzards Bay, MA ? Painting and Steel Repairs, Vertical Lift Railroad Bridge full & open with NAICS 238320 and PSC Y1QA via sealed bid acquisition procedures with 7 bids received.

DOD Announcements

May 2025: Atlas Painting and Sheeting Corp.,* Amherst, New York, was awarded a $19,690,000 firm-fixed-price contract to repair and paint a railroad bridge. Bids were solicited via the internet with seven received. Work will be performed in Buzzards Bay, Massachusetts, with an estimated completion date of Jan. 6, 2027. Fiscal 2022, 2023 and 2024 civil operation and maintenance funds in the amount of $19,690,000 were obligated at the time of the award. U.S. Army Corps of Engineers, Concord, Massachusetts, is the contracting activity (W912WJ-25-C-0004).

Status
(Open)

Last Modified 7/1/25
Period of Performance
5/15/25
Start Date
12/27/26
Current End Date
12/27/26
Potential End Date
63.0% Complete

Obligations
$19.7M
Total Obligated
$19.7M
Current Award
$19.7M
Potential Award
100% Funded

Award Hierarchy

Definitive Contract

W912WJ25C0004

Subcontracts

0

Activity Timeline

Interactive chart of timeline of amendments to W912WJ25C0004

Opportunity Lifecycle

Procurement history for W912WJ25C0004

Transaction History

Modifications to W912WJ25C0004

People

Suggested agency contacts for W912WJ25C0004

Competition

Number of Bidders
7
Solicitation Procedures
Sealed Bid
Evaluated Preference
None
Commercial Item Acquisition
Commercial Item Procedures Not Used
Simplified Procedures for Commercial Items
No

Other Categorizations

Subcontracting Plan
Plan Not Required
Cost Accounting Standards
Exempt
Business Size Determination
Small Business
Defense Program
None
DoD Claimant Code
None
IT Commercial Item Category
Not Applicable
Awardee UEI
UF45JN2L2MD7
Awardee CAGE
1BFE7
Agency Detail
Awarding Office
W912WJ W2SD ENDIST NEW ENGLAND
Funding Office
W912WJ
Created By
erin.e.bradley@usace.army.mil
Last Modified By
erin.e.bradley@usace.army.mil
Approved By
erin.e.bradley@usace.army.mil

Legislative

Legislative Mandates
Construction Wage Rate Requirements
Performance District
MA-09
Senators
Edward Markey
Elizabeth Warren