Search Prime Contracts

W912HN26CA016

Definitive Contract

Overview

Government Description
Repair barracks building 2836 at Fort Benning, GA. Includes comprehensive repairs and upgrades to failed and failing components of transient uph barracks building 2836, including exterior walls, windows, fire protection, interior walls, doors, insulation, interior finishes, finish floors, roof and ceilings, plumbing, HVAC, HVAC controls, electrical systems, electrical service and distribution, and building information systems. The project also involves removal of any mold, abatement of Asbestos Contaminated Material (ACM) and lead-based paint, reconfiguration of permanent party barracks rooms from a 2+0 configuration to an open bay configuration, and sitework for utility upgrades and incidental site improvements.
Place of Performance
Fort Benning, GA 31905 United States
Pricing
Fixed Price
Set Aside
Small Business Set Aside - Total (SBA)
Extent Competed
Full And Open Competition After Exclusion Of Sources
Speegle Construction was awarded Definitive Contract W912HN26CA016 (W912HN-26-C-A016) for Repair Barracks Bldg 2836, Fort Benning GA worth up to $31,497,000 by USACE Savannah District in February 2026. The contract has a duration of 2 years 2 months and was awarded through solicitation Project Number: 107120, Repair Barracks Building 2836 at Fort Benning, GA with a Small Business Total set aside with NAICS 236220 and PSC Z2FC via direct negotiation acquisition procedures with 9 bids received.

DOD Announcements

Feb 2026: Speegle Construction Inc., Niceville, Florida, was awarded a $31,479,000 firm-fixed-price contract for comprehensive repairs and upgrades to exterior and interior building systems, structures, and finishes. Bids were solicited via the internet with nine received. Work will be performed in Fort Benning, Georgia, with an estimated completion date of May 4, 2028. Fiscal 2026 operation and maintenance, Army funds in the amount of $31,479,000 were obligated at the time of the award. U.S. Army Corps of Engineers, Savannah District, is the contracting activity (W912HN-26-C-A016).

Status
(Open)

Last Modified 4/13/26
Period of Performance
2/12/26
Start Date
4/22/28
Current End Date
4/22/28
Potential End Date
17.0% Complete

Obligations
$31.5M
Total Obligated
$31.5M
Current Award
$31.5M
Potential Award
100% Funded

Award Hierarchy

Definitive Contract

W912HN26CA016

Subcontracts

0

Activity Timeline

Interactive chart of timeline of amendments to W912HN26CA016

Opportunity Lifecycle

Procurement history for W912HN26CA016

People

Suggested agency contacts for W912HN26CA016

Competition

Number of Bidders
9
Solicitation Procedures
Negotiated Proposal/Quote
Evaluated Preference
None
Commercial Item Acquisition
Commercial Item Procedures Not Used
Simplified Procedures for Commercial Items
No

Other Categorizations

Subcontracting Plan
Plan Not Required
Cost Accounting Standards
Exempt
Business Size Determination
Small Business
Defense Program
None
DoD Claimant Code
None
IT Commercial Item Category
Not Applicable
Awardee UEI
FE24DCBHDYQ1
Awardee CAGE
8S273
Agency Detail
Awarding Office
W912HN W074 ENDIST SAVANNAH
Funding Office
W33SJG
Created By
gregory.m.graham@acws
Last Modified By
adrian.e.goolsby.w912hn@sa
Approved By
gregory.m.graham@acws

Legislative

Legislative Mandates
Construction Wage Rate Requirements Labor Standards
Performance District
GA-02
Senators
Jon Ossoff
Raphael Warnock
Representative
Sanford Bishop
Modified: 4/13/26