W912DW24C0010

Definitive Contract

Overview

Government Description
Libby dam unit 6 installation involves installing generator unit 6 at libby dam, MT using government-furnished, brand name, and other purchased equipment, including testing and commissioning for commercial service. Includes disassembly of unit 6 turbine, unit alignment, commissioning support, retrofit of a 15KV outdoor HVR-63XS generator circuit breaker cubicle, design, fabrication, factory testing, and delivery of an excitation system, and design and furnishing of isolated phase bus and surge/pt cubicle. Additional tasks include digital governor plc retrofit and commissioning support, supply and installation of mechanical and piping systems, and performing work on unit 6 test stator sections, neutral current transformers, partial discharge analysis system, poles, collector rings, shaft, leads, brushes and brush rigging, and rotors. The contract also covers supply of generator circuit breaker, SF6 gas and regulator, and control cables.
Place of Performance
Libby, MT 59923 United States
Pricing
Fixed Price
Set Aside
None
Extent Competed
Full And Open Competition
Analysis Notes
Amendment Since initial award the Potential Award value has increased from $34,820,564 to $34,868,419.
Subcontracting Plan This Definitive Contract has an Individual Subcontract Plan. The Department of Defense has an overall small business subcontracting goal of 30%
Olsson Industrial Electric was awarded Definitive Contract W912DW24C0010 (W912DW-24-C-0010) for Installation of Unit 6 at Libby Dam worth up to $34,868,419 by USACE Seattle District in June 2024. The contract has a duration of 3 years and was awarded through solicitation Libby Dam Unit 6 Installation full & open with NAICS 237990 and PSC Y1PZ via direct negotiation acquisition procedures with 2 bids received. As of today, the Definitive Contract has a total reported backlog of $6,123,951 and funded backlog of $5,516,427.

DOD Announcements

May 2024: Olsson Industrial Electric Inc., Springfield, Oregon, was awarded a $33,169,374 firm-fixed-price contract for the Libby Dam. Bids were solicited via the internet with two received. Work will be performed in Libby, Montana, with an estimated completion date of May 20, 2027. Fiscal 2024 Bonneville Power Authority funds in the amount of $2,140,001 were obligated at the time of the award. U.S. Army Corps of Engineers, Seattle, Washington, is the contracting activity (W912DW-24-C-0010).

Status
(Open)

Last Modified 3/2/26
Period of Performance
6/10/24
Start Date
5/26/27
Current End Date
5/26/27
Potential End Date
67.0% Complete

Obligations and Backlog
$28.7M
Total Obligated
$34.3M
Current Award
$34.9M
Potential Award
82% Funded
$5.5M
Funded Backlog
$6.1M
Total Backlog

Award Hierarchy

Definitive Contract

W912DW24C0010

Subcontracts

-

Activity Timeline

Interactive chart of timeline of amendments to W912DW24C0010

Subcontract Awards

Disclosed subcontracts for W912DW24C0010

Opportunity Lifecycle

Procurement history for W912DW24C0010

Transaction History

Modifications to W912DW24C0010

People

Suggested agency contacts for W912DW24C0010

Competition

Number of Bidders
2
Solicitation Procedures
Negotiated Proposal/Quote
Evaluated Preference
None
Commercial Item Acquisition
Commercial Item Procedures Not Used
Simplified Procedures for Commercial Items
No

Other Categorizations

Subcontracting Plan
Individual Subcontract Plan
Cost Accounting Standards
Exempt
Business Size Determination
Large Business
Defense Program
None
DoD Claimant Code
None
Awardee UEI
GH6DAYLK9EV1
Awardee CAGE
1WUR1
Agency Detail
Awarding Office
W912DW W071 ENDIST SEATTLE
Funding Office
W68MD9
Created By
camilla.allen@acws
Last Modified By
camilla.allen@acws
Approved By
camilla.allen@acws

Legislative

Legislative Mandates
Construction Wage Rate Requirements
Performance District
MT-01
Senators
Jon Tester
Steve Daines
Representative
Ryan Zinke
Modified: 3/2/26