Overview

Government Description
Flightline Fueling Facility. Includes constructing two R-11 refueler truck pantograph fill stands with filtration systems, canopies, concrete pavement, spill containment measures, supporting electrical infrastructure, fuel issue lines, high-point vents, low-point drains, isolation pits, and heated eyewash bottle stations. Additionally, a ground vehicle fueling station will be built featuring a 20,000-gallon diesel AST, a 12,000-gallon motor gasoline AST, bulk load diesel fill stand, diesel and gasoline dispensers, concrete paved fueling lanes, spill containment, access drives, electrical infrastructure, portable generator connections, dispenser issue pumps, standard tank appurtenances, and incidental related work. All construction activities will take place at Whiteman Air Force Base (WAFB), Missouri.
Place of Performance
Whiteman Afb, MO 65305 United States
Pricing
Fixed Price
Set Aside
None
Extent Competed
Full And Open Competition
Analysis Notes
Amendment Since initial award the Potential End Date has been extended from 08/11/27 to 09/25/27 and the Potential Award value has increased from $20,040,500 to $20,081,858.
Subcontracting Plan This Definitive Contract has an Individual Subcontract Plan. The Department of Defense has an overall small business subcontracting goal of 30%
MEB General Contractors was awarded Definitive Contract W912DQ25CA010 (W912DQ-25-C-A010) for Flightline Fueling Facility Construction Subaward worth up to $20,081,858 by USACE Kansas City District in July 2025. The contract has a duration of 2 years 2 months and was awarded through solicitation Construct Flightline Fueling Facility full & open with NAICS 237120 and PSC Y1NA via direct negotiation acquisition procedures with 3 bids received. As of today, the Definitive Contract has a total reported backlog of $197,500.

DOD Announcements

Jul 2025: MEB General Contractors Inc., Chesapeake, Virginia, was awarded a firm-fixed-price contract for refueler truck pantograph fuel stands and a ground vehicle fueling station. The amount of this action is $19,766,000 with a cumulative total face value of $20,395,500. Bids were solicited via the internet with three received. Work will be performed in on Whiteman Air Force Base with an estimated completion date of Aug. 02, 2027. Fiscal 2025 military construction, defense-wide funds in the amount of $19,766,000 were obligated at the time of the award. U.S. Army Corps of Engineers, Kansas City, Missouri, is the contracting activity (W912DQ-25-C-A010).

Status
(Open)

Last Modified 8/24/26
Period of Performance
7/24/25
Start Date
9/25/27
Current End Date
9/25/27
Potential End Date
60.0% Complete

Obligations and Backlog
$19.9M
Total Obligated
$19.9M
Current Award
$20.1M
Potential Award
99% Funded
$0.0
Funded Backlog
$197.5K
Total Backlog

Award Hierarchy

Definitive Contract

W912DQ25CA010

Subcontracts

0

Activity Timeline

Interactive chart of timeline of amendments to W912DQ25CA010

Opportunity Lifecycle

Procurement history for W912DQ25CA010

Transaction History

Modifications to W912DQ25CA010

People

Suggested agency contacts for W912DQ25CA010

Competition

Number of Bidders
3
Solicitation Procedures
Negotiated Proposal/Quote
Evaluated Preference
None
Performance Based Acquisition
Yes
Commercial Item Acquisition
Commercial Item Procedures Not Used
Simplified Procedures for Commercial Items
No

Other Categorizations

Subcontracting Plan
Individual Subcontract Plan
Cost Accounting Standards
Yes
Business Size Determination
Large Business
Defense Program
None
DoD Claimant Code
None
IT Commercial Item Category
Not Applicable
Awardee UEI
EJHTLA7NAFH4
Awardee CAGE
0CVN7
Agency Detail
Awarding Office
W912DQ W071 ENDIST KANSAS CITY
Funding Office
W58XUW
Created By
michael.g.france@usace.army.mil
Last Modified By
michael.g.france@usace.army.mil
Approved By
michael.g.france@usace.army.mil

Legislative

Legislative Mandates
Construction Wage Rate Requirements
Performance District
MO-04
Senators
Joshua Hawley
Eric Schmitt
Representative
Mark Alford
Modified: 8/24/26