Two-phase design and construction of an Advanced Individual Training (AIT) complex at Fort Rucker, Alabama. Includes construction of a 24,000 SF 800-PERSON dining facility, a 10,900 SF battalion headquarters, a 90,000 SF enlisted barracks for 300 soldiers with attached Company Operations Facilities (COF) and covered training area, a 1,000 SF detached storage facility, a multipurpose training athletic field, Intrusion Detection System (IDS) installation, and Energy Monitoring And Control System (EMCS) connection, with sustainability and energy enhancement measures. Additional work performed includes doors, frames, hardware, mechanical and plumbing, glass and glazing, landscaping, vault doors, signage, segmental retaining walls, light gauge trusses, drywall, ceilings, acoustical ceilings, construction phase cybersecurity services, roller window shades, geotechnical engineering, electrical, fire protection, sitework, site concrete, site improvements, elevator installation, test and balance, specialties and entrance mats, membrane and metal roofing, masonry, total building commissioning and air barrier testing, drywall finishing and painting, waterproofing, air barrier, expansion joints and joint sealants, design/engineering services, materials testing and inspections, aggregate pier ground improvements, hard tile, resilient and carpet flooring, eifs, operable partition walls, and door and hardware installation. The project also incorporates ufc 3-490-06, AR 190-11 requirements for arms vaults, hardscape removal, unforeseen item removal, and low-slope roofing adjustments.
Place of Performance
Fort Novosel, AL 36362 United States
Pricing
Fixed Price
Set Aside
None
Extent Competed
Full And Open Competition
Analysis Notes
Amendment Since initial award the Potential End Date has been extended from 02/17/26 to 05/04/26 and the Potential Award value has increased from $91,617,356 to $91,856,658.
Subcontracting Plan This Definitive Contract has an Individual Subcontract Plan. The Department of Defense has an overall small business subcontracting goal of 30%
Unrealized Backlog This Definitive Contract is complete with $222,874 of funded backlog and $30,751,780 of unfunded backlog unused, which is typically due to unexercised options.
BL Harbert International was awarded Definitive Contract W9127823C0019 (W91278-23-C-0019) for AIT Complex Design & Construction, Fort Rucker, AL worth up to $91,856,658 by USACE Mobile District in August 2023. The contract has a duration of 2 years 9 months and was awarded through solicitation Advanced Individual Training (AIT) Complex, Fort Rucker, AL full & open with NAICS 236220 and PSC Y1FC via two step acquisition procedures with 3 bids received. As of today, the Definitive Contract has a total reported backlog of $30,751,780 and funded backlog of $222,874, though the contract is complete, so backlog may not be realized.

DOD Announcements

Sep 2023: BL Harbert International LLC, Birmingham, Alabama, was awarded a $61,088,450 firm-fixed-price contract for construction of a training complex. Bids were solicited via the internet with three received. Work will be performed at Fort Novosel, Alabama, with an estimated completion date of Feb. 21, 2026. Fiscal 2023 civil operations and maintenance funds in the amount of $61,088,450 were obligated at the time of the award. U.S. Army Corps of Engineers, Mobile, Alabama is the contracting activity (W91278-23-C-0019).

Status
(Complete)

Last Modified 3/17/26
Period of Performance
8/18/23
Start Date
5/4/26
Current End Date
5/4/26
Potential End Date
100% Complete

Obligations and Backlog
$61.1M
Total Obligated
$61.3M
Current Award
$91.9M
Potential Award
67% Funded
$222.9K
Funded Backlog
$30.8M
Total Backlog

Award Hierarchy

Definitive Contract

W9127823C0019

Subcontracts

-

Activity Timeline

Interactive chart of timeline of amendments to W9127823C0019

Subcontract Awards

Disclosed subcontracts for W9127823C0019

Opportunity Lifecycle

Procurement history for W9127823C0019

Transaction History

Modifications to W9127823C0019

People

Suggested agency contacts for W9127823C0019

Competition

Number of Bidders
3
Solicitation Procedures
Two Step
Evaluated Preference
None
Commercial Item Acquisition
Commercial Item Procedures Not Used
Simplified Procedures for Commercial Items
No

Other Categorizations

Subcontracting Plan
Individual Subcontract Plan
Cost Accounting Standards
Exempt
Business Size Determination
Large Business
Defense Program
None
DoD Claimant Code
None
IT Commercial Item Category
Not Applicable
Awardee UEI
XXNJCWMAKNH8
Awardee CAGE
1NRU1
Agency Detail
Awarding Office
W91278 W074 ENDIST MOBILE
Funding Office
W31XNJ
Created By
miranda.k.griffin@usace.army.mil
Last Modified By
miranda.k.griffin@usace.army.mil
Approved By
miranda.k.griffin@usace.army.mil

Legislative

Legislative Mandates
Construction Wage Rate Requirements
Performance District
AL-01
Senators
Tommy Tuberville
Katie Britt
Representative
Jerry Carl
Modified: 3/17/26