Government Description
Design build construction contract to provide 388TH east apron repairs located at hill AFB Utah. Includes replacement of approximately 735,000 square feet of existing Portland Cement Concrete (PCC) pavement, full rework of structural base materials with the addition of an aggregate base course, stabilized drainage layer, and geotextile filter fabric for seasonal frost conditions. Additional tasks include replacing existing shoulder asphalt pavement, reworking the shoulder base course, providing anchored tie-downs and pavement markings, removing underground asbestos piping, and installing and/or removing crew shacks, all in accordance with current DOD Unified Facilities Criteria (UFC) standards. Demolition involves removal of 52 existing sunshades, PCC apron slabs, and asphalt shoulders, with optional work for construction of 52 new sunshades and 1 crew shack; asbestos/lbp removal will be performed by a certified contractor.
Awardee
Place of Performance
Hill Afb, UT 84056 United States
Pricing
Fixed Price
Set Aside
Small Business Set Aside - Total (SBA)
Extent Competed
Full And Open Competition After Exclusion Of Sources
Analysis Notes
Amendment Since initial award the Potential End Date has been extended from 01/03/27 to 10/18/27 and the Potential Award value has decreased 14% from $48,742,445 to $41,953,821.
NH1 JV was awarded Definitive Contract W9123823C0032 (W91238-23-C-0032) for 388th East Apron Repairs Design-Build Construction – Hill AFB worth up to $41,953,821 by USACE Sacramento District in September 2023. The contract has a duration of 4 years 1 months and was awarded through solicitation USACE SPK DB Construction ? East 388th Apron Repair, Hill AFB, UT. with a Small Business Total set aside with NAICS 237310 and PSC Z1LB via two step acquisition procedures with 3 bids received. As of today, the Definitive Contract has a total reported backlog of $1,025,351 and funded backlog of $1,025,351.

DOD Announcements

Sep 2023: NHI JV,* Highland, Utah, was awarded a $46,661,483 firm-fixed-price contract for design-build construction services. Bids were solicited via the internet with three received. Work will be performed at Hill Air Force Base, Utah, with an estimated completion date of Sept. 25, 2026. Fiscal 2023 operation and maintenance, Air Force funds and procurement, Air Force funds in the amount of $46,661,483 were obligated at the time of the award.  U.S. Army Corps of Engineers, Sacramento, California, is the contracting activity (W91238-23-C-0032).

Status
(Open)

Last Modified 2/25/26
Period of Performance
9/29/23
Start Date
10/18/27
Current End Date
10/18/27
Potential End Date
68.0% Complete

Obligations and Backlog
$40.9M
Total Obligated
$42.0M
Current Award
$42.0M
Potential Award
98% Funded
$1.0M
Funded Backlog
$1.0M
Total Backlog

Award Hierarchy

Definitive Contract

W9123823C0032

Subcontracts

0

Activity Timeline

Interactive chart of timeline of amendments to W9123823C0032

Opportunity Lifecycle

Procurement history for W9123823C0032

Transaction History

Modifications to W9123823C0032

People

Suggested agency contacts for W9123823C0032

Competition

Number of Bidders
3
Solicitation Procedures
Two Step
Evaluated Preference
None
Commercial Item Acquisition
Commercial Item Procedures Not Used
Simplified Procedures for Commercial Items
No

Other Categorizations

Subcontracting Plan
Plan Not Required
Cost Accounting Standards
Exempt
Business Size Determination
Small Business
Defense Program
None
DoD Claimant Code
None
IT Commercial Item Category
Not Applicable
Awardee UEI
NS7TRNRTKWG4
Awardee CAGE
948U3
Agency Detail
Awarding Office
W91238 W075 ENDIST SACRAMENTO
Funding Office
W91238
Created By
chris.paxman@acws
Last Modified By
chris.paxman@acws
Approved By
chris.paxman@acws

Legislative

Legislative Mandates
Construction Wage Rate Requirements
Performance District
UT-01
Senators
Mike Lee
Mitt Romney
Representative
Blake Moore
Modified: 2/25/26