Search Prime Contracts

W9123823C0014

Definitive Contract

Overview

Government Description
The sacramento weir widening will reduce water surface elevation in sacramento river and allow water to flow into the yolo bypass system. Project consists of construction of a passive weir, levee setback, fish passage control among others. Additional work includes construction of a 1,500 lf road bridge, 1,450 lf passive weir, 2,500 lf levee, fish passage facility with a 420 lf technical fish ladder and 200 lf channel with vertical lift gates, 4,000 lf of new county roads, a 2,350 foot long interior drainage ditch, 8,500 lf bypass transport channel, 1,600 lf stilling basin drainage channel, and an embankment for fish passage facility operations and maintenance. The project includes degradation of a railroad embankment and Levee, Erosion Protection Measures Such As Rock Slope Protection, Concrete Slope Protection, And Tied Concrete Block Mat, And Connection To the Lower Elkhorn Levee Setback Project (LEBLS).
Place of Performance
West Sacramento, CA 95605 United States
Pricing
Fixed Price
Set Aside
None
Extent Competed
Full And Open Competition
Analysis Notes
Amendment Since initial award the Potential End Date has been extended from 11/12/26 to 12/02/26 and the Potential Award value has increased 10% from $172,948,401 to $190,688,194.
Subcontracting Plan This Definitive Contract has a Commercial Subcontract Plan. The Department of Defense has an overall small business subcontracting goal of 30%
Granite Construction Company was awarded Definitive Contract W9123823C0014 (W91238-23-C-0014) for Sacramento Weir Widening Project worth up to $190,688,194 by USACE Sacramento District in June 2023. The contract has a duration of 3 years 6 months and was awarded through solicitation American River Common Features 2016 Sacramento Weir Widening Yolo County, CA full & open with NAICS 237990 and PSC Y1PZ via sealed bid acquisition procedures with 3 bids received. As of today, the Definitive Contract has a total reported backlog of $2,500,223 and funded backlog of $2,500,223.

DOD Announcements

May 2023: Granite Construction Co., Watsonville, California, was awarded a $172,948,401 firm-fixed-price contract for the Sacramento Weir Widening project. Bids were solicited via the internet with three received. Work will be performed in West Sacramento, California, with an estimated completion date of Oct. 15, 2026. Fiscal 2023 civil construction funds in the amount of $172,948,401 were obligated at the time of the award. U.S. Army Corps of Engineers, Sacramento, California, is the contracting activity (W91238-23-C-0014).

Status
(Open)

Last Modified 3/12/26
Period of Performance
6/1/23
Start Date
12/2/26
Current End Date
12/2/26
Potential End Date
87.0% Complete

Obligations and Backlog
$188.2M
Total Obligated
$190.7M
Current Award
$190.7M
Potential Award
99% Funded
$2.5M
Funded Backlog
$2.5M
Total Backlog

Award Hierarchy

Definitive Contract

W9123823C0014

Subcontracts

0

Activity Timeline

Interactive chart of timeline of amendments to W9123823C0014

Opportunity Lifecycle

Procurement history for W9123823C0014

Transaction History

Modifications to W9123823C0014

People

Suggested agency contacts for W9123823C0014

Competition

Number of Bidders
3
Solicitation Procedures
Sealed Bid
Evaluated Preference
None
Commercial Item Acquisition
Commercial Item Procedures Not Used
Simplified Procedures for Commercial Items
No

Other Categorizations

Subcontracting Plan
Commercial Subcontract Plan
Cost Accounting Standards
Exempt
Business Size Determination
Large Business
Defense Program
None
DoD Claimant Code
None
IT Commercial Item Category
Not Applicable
Awardee UEI
VAYJNMM2KBE5
Awardee CAGE
1X910
Agency Detail
Awarding Office
W91238 W075 ENDIST SACRAMENTO
Funding Office
W62N6M
Created By
zachary.m.moore@acws
Last Modified By
zachary.m.moore@acws
Approved By
zachary.m.moore@acws

Legislative

Legislative Mandates
Construction Wage Rate Requirements
Performance District
CA-07
Senators
Dianne Feinstein
Alejandro Padilla
Representative
Doris Matsui
Modified: 3/12/26