W9123822C0035
Definitive Contract
Overview
Government Description
DESIGN BUILD CONSTRUCTION TO CONSTRUCT MODULAR STORAGE MAGAZINES AND APRONS AT HILL AIR FORCE BASE.
Awardee
Awarding / Funding Agency
Place of Performance
Hill Afb, UT 84056 United States
Pricing
Fixed Price
Set Aside
Small Business Set Aside - Total (SBA)
Extent Competed
Full And Open Competition After Exclusion Of Sources
Related Opportunity
Analysis Notes
Amendment Since initial award the Potential End Date has been extended from 08/31/25 to 09/24/25 and the Potential Award value has decreased from $15,293,710 to $15,200,314.
Recompete The following similar solicitation(s) may continue aspects of this contract: USACE SPK Design Bid Build (DBB) Construction - Defense Logistics Agency (DLA) Lot 4 Open Storage, Hill Air Force Base, Utah., DEFENSE LOGISTICS AGENCY (DLA) LOT 4 OPEN STORAGE
Recompete The following similar solicitation(s) may continue aspects of this contract: USACE SPK Design Bid Build (DBB) Construction - Defense Logistics Agency (DLA) Lot 4 Open Storage, Hill Air Force Base, Utah., DEFENSE LOGISTICS AGENCY (DLA) LOT 4 OPEN STORAGE
NH1 JV was awarded
Definitive Contract W9123822C0035 (W91238-22-C-0035)
for Design Build Construction To Construct Modular Storage Magazines And Aprons At Hill Air Force Base.
worth up to $15,200,314
by USACE Sacramento District
in October 2022.
The contract
has a duration of 3 years and
was awarded
through solicitation USACE SPK Design Build Construction - AFTC Munitions Storage Magazines - Hill AFB, UT
with a Small Business Total set aside
with
NAICS 236220 and
PSC Y1GA
via two step acquisition procedures with 5 bids received.
As of today, the Definitive Contract has a total reported backlog of $5,136,029.
DOD Announcements
Sep 2022:
NH1 JV,* Highland, Utah, was awarded a $10,157,681 firm-fixed-price contract to build earth-covered reinforced concrete modular storage magazines. Bids were solicited via the internet with five received. Work will be performed in Hill Air Force Base, Utah, with an estimated completion date of Aug. 11, 2025. Fiscal 2020 other procurement, Air Force funds in the amount of $10,157,681 were obligated at the time of the award. U.S. Army Corps of Engineers, Sacramento, California, is the contracting activity (W91238-22-C-0035).
Status
(Open)
Last Modified 1/14/25
Period of Performance
10/30/22
Start Date
9/24/25
Current End Date
9/24/25
Potential End Date
Obligations and Backlog
$10.1M
Total Obligated
$10.1M
Current Award
$15.2M
Potential Award
$0.0
Funded Backlog
$5.1M
Total Backlog
Award Hierarchy
Definitive Contract
W9123822C0035
Subcontracts
Activity Timeline
Opportunity Lifecycle
Procurement history for W9123822C0035
Transaction History
Modifications to W9123822C0035
People
Suggested agency contacts for W9123822C0035
Competition
Number of Bidders
5
Solicitation Procedures
Two Step
Evaluated Preference
None
Commercial Item Acquisition
Commercial Item Procedures Not Used
Simplified Procedures for Commercial Items
No
Other Categorizations
Subcontracting Plan
Plan Not Required
Cost Accounting Standards
Exempt
Business Size Determination
Small Business
Defense Program
None
DoD Claimant Code
Construction
IT Commercial Item Category
Not Applicable
Awardee UEI
NS7TRNRTKWG4
Awardee CAGE
948U3
Agency Detail
Awarding Office
W91238 W075 ENDIST SACRAMENTO
Funding Office
W91238
Created By
christopher.s.paxman@usace.army.mil
Last Modified By
christopher.s.paxman@usace.army.mil
Approved By
christopher.s.paxman@usace.army.mil
Legislative
Legislative Mandates
Construction Wage Rate Requirements
Performance District
UT-01
Senators
Mike Lee
Mitt Romney
Mitt Romney
Representative
Blake Moore
Budget Funding
Federal Account | Budget Subfunction | Object Class | Total | Percentage |
---|---|---|---|---|
Military Construction, Army (021-2050) | Department of Defense-Military | Land and structures (32.0) | $10,157,681 | 100% |
Modified: 1/14/25