Search Prime Contracts

W9123821C0013

Definitive Contract

Overview

Government Description
Consolidated mission control center. Includes providing upsized chiller water pipe, replacing valves and door hardware, installing 48 strand fiber, ng line, over excavation, CAT6A cabling, sound attenuation, plywood, acoustical wall panels, access control system, acs raceway and panel installations, prv, lockset, zero delay switch, redesign of llis, redesign and fcu credit, and installation of heat tape in downspouts and roof areas. The project involves constructing a new Consolidated Mission Control Center (CMCC) at Hill Air Force Base (HAFB), UT, with state-of-the-art equipment to replace outdated facilities, improve air traffic control services, and enhance post-mission test evaluation capabilities. The facility includes a Mission Control Center (MCC), Air Operations Center (AOC), administration offices, and facility support spaces, designed to optimize functional use and adhere to Air Force standards.
Place of Performance
Orem, UT 84057 United States
Pricing
Fixed Price
Set Aside
None
Extent Competed
Full And Open Competition
Analysis Notes
Amendment Since initial award the Potential End Date has been extended from 07/05/23 to 12/31/26 and the Potential Award value has increased 29% from $22,229,812 to $28,782,985.
HHI Corporation was awarded Definitive Contract W9123821C0013 (W91238-21-C-0013) for Consolidated Mission Control Center Construction Contract worth up to $28,782,985 by USACE Sacramento District in March 2021. The contract has a duration of 5 years 9 months and was awarded through solicitation UTTR CMCC at Hill AFB, UT full & open with NAICS 236220 and PSC Y1EZ via direct negotiation acquisition procedures with 3 bids received.

DOD Announcements

Mar 2021: HHI Corp.,* Ogden, Utah, was awarded a $22,229,812 firm-fixed-price contract to build a consolidated mission control center at Hill Air Force Base.  Bids were solicited via the internet with three received.  Work will be performed at Hill Air Force Base, Utah, with an estimated completion date of July 9, 2023.  Fiscal 2021 military construction (Army) funds in the amount of $22,229,812 were obligated at the time of the award.  U.S. Army Corps of Engineers, Sacramento, California, is the contracting activity (W91238-21-C-0013).

Status
(Open)

Last Modified 2/26/26
Period of Performance
3/5/21
Start Date
12/31/26
Current End Date
12/31/26
Potential End Date
90.0% Complete

Obligations
$28.8M
Total Obligated
$28.8M
Current Award
$28.8M
Potential Award
100% Funded

Award Hierarchy

Definitive Contract

W9123821C0013

Subcontracts

0

Activity Timeline

Interactive chart of timeline of amendments to W9123821C0013

Opportunity Lifecycle

Procurement history for W9123821C0013

Transaction History

Modifications to W9123821C0013

People

Suggested agency contacts for W9123821C0013

Competition

Number of Bidders
3
Solicitation Procedures
Negotiated Proposal/Quote
Evaluated Preference
None
Commercial Item Acquisition
Commercial Item Procedures Not Used
Simplified Procedures for Commercial Items
No

Other Categorizations

Subcontracting Plan
Plan Not Required
Cost Accounting Standards
Exempt
Business Size Determination
Small Business
Defense Program
None
DoD Claimant Code
Construction
IT Commercial Item Category
Not Applicable
Awardee UEI
MKM2UNBJVD95
Awardee CAGE
0DRY5
Agency Detail
Awarding Office
W91238 W075 ENDIST SACRAMENTO
Funding Office
W62N6M
Created By
michelle.a.spence@usace.army.mil
Last Modified By
michelle.a.spence@usace.army.mil
Approved By
michelle.a.spence@usace.army.mil

Legislative

Legislative Mandates
Construction Wage Rate Requirements
Performance District
UT-03
Senators
Mike Lee
Mitt Romney
Representative
John Curtis
Modified: 2/26/26