MARKET INTEL |
PRIME CONTRACT

Definitive Contract - W58RGZ21C0026

OVERVIEW

Original Description
ARMY SMALL BUSINESS INNOVATION RESEARCH (SBIR) PHASE I FOR EFFORT ENTITLED,"HIGH EFFICIENCY ADVANCED TURBOSHAFT 20 TO 30 HP, USING ADVANCED MATERIALS AND PROCESSES FOR LOW SFC, NOISE AND WEIGHT".
Place of Performance
Bensenville, IL USA
Pricing
Fixed Price
Set Aside
Small Business Set Aside - Total (SBA)
Extent Competed
Full And Open Competition After Exclusion Of Sources
Related Opportunity
None

SBIR DETAILS

Research Type
Small Technology Transfer Research Program (STTR) Phase I
Title
High Efficiency Advanced Turboshaft 20 to 30 hp, Using Advanced Materials and Processes for Low SFC, Noise and Weight
Abstract
In Phase I Spytek will develop and demonstrate a low volume, high performance engine system, T301, to power Air Launched Effects (ALE) unmanned aerial systems (UAS) for increased operational capability. In support of high performance requirements of the T301, such as low weight, in the .5hp/lb range and 1.2lb/hp-hr SFC, and 1000-2000 hr/TBO, maintaining an envelope of 10 inches square by 21 inches in length, with little noise, Spytek will study, design, modify, manufacture and test advanced ceramic coated component parts (combustor liners, nozzle guide vanes) in its J302-GMX-2 turbojet developed under a SOSSEC program to support the design of the 25 to 30 hp T301 turboshaft engine to be manufactured in Phase II of this effort.   In the Phase I option, complete SN282 ceramic components (radial turbine) would be evaluated for use in Phase II of this effort. Spytek will define performance parameters/interface constraints, of using ceramic components, and TBCs in various engine parts. Spytek will also demonstrate feasibility through limited modeling and simulation but will rely where possible on actual engine testing of the components, namely the SN282 ceramic turbine in the T301 engine as part of Phase II.
Topic Code
A20-112
Solicitation Number
20.2
Contact
Elizabeth Spytek
(630) 595-9133
espytek1@aol.com

STATUS
(Complete)

Period of Performance

6/28/21

Start Date

12/9/21

Current End Date

12/9/21

Potential End Date
100% Complete

Obligations and Backlog

$111.5K

Total Obligated

$111.5K

Current Award

$167.5K

Potential Award
67% Funded

$0.0

Funded Backlog

$56.0K

Unfunded Backlog

AWARD RELATIONSHIPS

Definitive Contract

W58RGZ21C0026

Subcontracts

-

Definitive Contract

W58RGZ21C0026

Subs

-

ACTIVITY TIMELINE

SUBCONTRACT AWARDS

Opportunity Lifecycle

HISTORY

COMPETITION
Solicitation Procedures
Negotiated Proposal/Quote
Number of Offers Received
14
Other Than Full and Open Competition
None
Evaluated Preference
None
Commercial Item Acquisition
Commercial Item Procedures Not Used
Simplified Procedures for Commercial Items
No

OTHER CATEGORIZATIONS

Subcontracting Plan
Plan Not Required
National Interest Action
None
IT Commercial Item Category
Not Applicable
AGENCY DETAIL
Created By
padds.w58rgz@cs.army.mil
Last Modified By
padds.w58rgz@ko.army.mil
Approved By
padds.w58rgz@ko.army.mil
Awarding Office
W58RGZ W6QK ACC-RSA
Funding Office
W90BWX USA CCDC AVIATION AND MISSILE CENTE

LEGISLATIVE MANDATES

Clinger-Cohen Act Compliant
No
Construction Wage Rate Requirements
Not Applicable
Labor Standards
Not Applicable
Materials, Supplies, Articles & Equipment
Not Applicable
Last Modified: 6/28/21


PIID: W58RGZ-21-C-0026