W56HZV20D0062-W912CH24F0173
Delivery Order
Overview
Government Description
Total integrated engine revitalization program (TIGER III) year 4 hardware delivery order twelfth increment. This order includes the delivery of various engine components such as studs, straight; control cable assemblies; compressor blades (3RD stage, low pressure); pressure regulating valves; machined bearing housings; bolts; bearing and seal housings; INCO625 sheet stock; power turbine stator feedback cable assemblies; speed pick-up magnets; gear assemblies; electrical speed pickups; transducer and pin assemblies; exit guide vane SETS (compressor high); fuel nozzle assemblies; pressure sensors; solenoid valves; relay (100 amp, ipst); flow divider valve assemblies; fuel control electrical harness assemblies; heat shields; drain valve assemblies; seal rings (2ND turbine stage); compressor vane SETS (2ND stage low pressure, 3RD compressor stator low pressure); stator Vane SETS (Turbine Engine 1St Stage); Intershaft Seals; Face Plate Seals; Chip Collector Housings; Seal Rings (No. 5 Bearing); Combustor Liners; Starter Motors; Accessory Gearbox Gear Assemblies; Pressure Switches; Single Face Seals (VSC); and face seals (no. 1, 2, and 3).
Awardee
Awarding / Funding Agency
Place of Performance
Phoenix, AZ 85034 United States
Pricing
Fixed Price
Set Aside
None
Extent Competed
Not Competed
Related Opportunity
(Parent Award)
Analysis Notes
Amendment Since initial award the Potential End Date has been extended from 09/30/25 to 12/31/27.
Sole Source This Delivery Order was awarded sole source to Honeywell International because the government believes that only one company can provide the product / service (FAR 6.302-1).
Subcontracting Plan This Delivery Order has an Individual Subcontract Plan. The Department of Defense has an overall small business subcontracting goal of 30%
Sole Source This Delivery Order was awarded sole source to Honeywell International because the government believes that only one company can provide the product / service (FAR 6.302-1).
Subcontracting Plan This Delivery Order has an Individual Subcontract Plan. The Department of Defense has an overall small business subcontracting goal of 30%
Honeywell International was awarded
Delivery Order W912CH24F0173 (W912CH-24-F-0173)
for Total Integrated Engine Revitalization Program (TIGER III) Year 4 Hardware Delivery Order
worth up to $81,390,412
by ACC Detroit
in July 2024.
The contract
has a duration of 3 years 5 months and
was awarded
full & open
with
NAICS 336992 and
PSC 2835
via sole source acquisition procedures.
Status
(Open)
Last Modified 8/29/24
Period of Performance
7/19/24
Start Date
12/31/27
Current End Date
12/31/27
Potential End Date
Obligations
$81.4M
Total Obligated
$81.4M
Current Award
$81.4M
Potential Award
Award Hierarchy
Indefinite Delivery Contract
Delivery Order
W56HZV20D0062-W912CH24F0173
Subcontracts
Activity Timeline
Subcontract Awards
Disclosed subcontracts for W56HZV20D0062-W912CH24F0173
Transaction History
Modifications to W56HZV20D0062-W912CH24F0173
People
Suggested agency contacts for W56HZV20D0062-W912CH24F0173
Competition
Number of Bidders
Not Applicable
Solicitation Procedures
Sole Source
Other Than Full and Open Competition
Only One Source - Other
Evaluated Preference
None
Commercial Item Acquisition
Commercial Item Procedures Not Used
Simplified Procedures for Commercial Items
No
Other Categorizations
Subcontracting Plan
Individual Subcontract Plan
Cost Accounting Standards
Exempt
Business Size Determination
Large Business
Defense Program
None
DoD Claimant Code
None
IT Commercial Item Category
Not Applicable
Awardee UEI
KBL6XLDCXKG8
Awardee CAGE
99193
Agency Detail
Awarding Office
W912CH W6QK ACC- DTA
Funding Office
W56HZV
Created By
padds.w912ch@cs.army.mil
Last Modified By
padds.w912ch@ko.army.mil
Approved By
padds.w912ch@ko.army.mil
Legislative
Legislative Mandates
Materials, Supplies, Articles & Equipment
Performance District
AZ-03
Senators
Kyrsten Sinema
Mark Kelly
Mark Kelly
Representative
Ruben Gallego
Modified: 8/29/24