Search Prime Contracts

N6247318D5852-N6247320F4334

Delivery Order

Overview

Government Description
P205 Alert Force Complex
Awarding / Funding Agency
Place of Performance
Travis Afb, CA 94535 United States
Pricing
Fixed Price
Set Aside
None
Extent Competed
Full And Open Competition
Analysis Notes
Amendment Since initial award the Potential End Date has been extended from 05/10/22 to 09/27/24.
R.A. Burch Construction was awarded Delivery Order N6247320F4334 (N62473-20-F-4334) for P205 Alert Force Complex worth up to $60,213,358 by NAVFAC Southwest in March 2020. The contract has a duration of 4 years 6 months and was awarded through solicitation IDIQ MACC FOR NEW CONSTRUCTION, RENOVATION, AND REPAIR OF COMMERCIAL AND INSTITUTIONAL BUILDING PROJECTS AT VARIOUS GOVERNMENT INSTALLATIONS IN CA, AZ, NV, UT, CO, AND NM full & open with NAICS 236220 and PSC Y1AZ via subject to multiple award fair opportunity acquisition procedures with 2 bids received. This contract was awarded through vehicle NAVFAC Southwest New Construction and Repair MACC III.

DOD Announcements

Mar 2020: R. A. Burch Construction Co. Inc.,* Ramona, California, is awarded $56,433,432 for a firm-fixed-price task order (N62473-20-F-4334) under a multiple award construction contract for the design-build construction of an alert force complex at Travis Air Force Base.  Work will be performed in Fairfield, California, and is expected to be completed by May 2022.  The work provides design and construction of a new alert force complex, including an alert force and security facility, military strategic and tactical relay facilities and aircraft maintenance repair and storage facilities.  The project will construct a low-rise alert force facility with reinforced concrete masonry unit with filled cells for exterior walls, some interior walls, plaster exterior finish, reinforced concrete floors and a sloped standing seam metal roofing system over a concrete roof structure.  The project also includes demolishing existing facilities, utilities and site elements, concrete pavement, new overhead tail pipe vehicle exhaust system, new air compressors and additional asphalt drives.  Fiscal 2020 military construction, (Navy) contract funds in the amount of $56,433,432 are obligated on this award and will not expire at the end of the current fiscal year.  Two proposals were received for this task order.  The Naval Facilities Engineering Command, Southwest, San Diego, California, is the contracting activity (N62473-18-D-5852).

Status
(Complete)

Last Modified 9/23/24
Period of Performance
3/12/20
Start Date
9/27/24
Current End Date
9/27/24
Potential End Date
100% Complete

Obligations
$60.2M
Total Obligated
$60.2M
Current Award
$60.2M
Potential Award
100% Funded

Award Hierarchy

Indefinite Delivery Contract

N6247318D5852

Delivery Order

N6247318D5852-N6247320F4334

Subcontracts

-

Activity Timeline

Interactive chart of timeline of amendments to N6247318D5852-N6247320F4334

Subcontract Awards

Disclosed subcontracts for N6247318D5852-N6247320F4334

Opportunity Lifecycle

Procurement history for N6247318D5852-N6247320F4334

Transaction History

Modifications to N6247318D5852-N6247320F4334

People

Suggested agency contacts for N6247318D5852-N6247320F4334

Competition

Number of Bidders
2
Solicitation Procedures
Subject To Multiple Award Fair Opportunity
Evaluated Preference
None
Commercial Item Acquisition
Commercial Item Procedures Not Used
Simplified Procedures for Commercial Items
No

Other Categorizations

Subcontracting Plan
Plan Not Required
Cost Accounting Standards
Exempt
Business Size Determination
Small Business
Defense Program
None
DoD Claimant Code
Construction
IT Commercial Item Category
Not Applicable
Awardee UEI
PBCXB1D4K1C9
Awardee CAGE
0C7R0
Agency Detail
Awarding Office
N62473 NAVFACSYSCOM SOUTHWEST
Funding Office
N62473
Created By
gina.hossman@navy.mil
Last Modified By
gina.hossman@navy.mil
Approved By
gina.hossman@navy.mil

Legislative

Legislative Mandates
Construction Wage Rate Requirements
Performance District
CA-08
Senators
Dianne Feinstein
Alejandro Padilla
Representative
John Garamendi
Modified: 9/23/24