Search Prime Contracts

N4008522C0047

Definitive Contract

Overview

Government Description
P-678, dry dock 8 saltwater system. This project consists of two phases of construction at norfolk naval shipyard for the CVN-78. Phase 1 includes constructing 34.5KV site power distribution with underground duct banks, feeders, pad mounted switches, substations, and underground feeders to pumpwell 8, as well as upgrades to pumpwell 8 drainage capacity, replacement of Main Drain Pump (MDP) motors, back-up power for drainage pumps, interior electrical upgrades for a 4.16KV system, control booth and console, scada system upgrades, and supporting structural and site upgrades such as micropile foundations, monorail, temporary pumpwell suction chamber plugs, drainage piping, outfall structure, temporary cofferdam, railroad repairs, and underground utilities relocation and paving. Phase 2 involves demolishing two pump stations and their saltwater intake structures (buildings 828 and 829) and constructing two new saltwater pump stations with saltwater intakes, back-up power, pile foundations including additional timber wharf piles, an underground saltwater distribution system with direct buried piping and utility tunnel penetrations, saltwater feeders supplying both sides of the dry dock for cooling and firefighting, saltwater return piping routed to outfall structures, temporary cofferdams, crane rail reconstruction, railroad repair, utility relocations, and paving. All on-site work is performed within the shipyard Controlled Industrial Area (CIA), requiring unique access credentials and strict limitations on materials and equipment.
Place of Performance
Portsmouth, VA 23709 United States
Pricing
Fixed Price
Set Aside
None
Extent Competed
Full And Open Competition
Analysis Notes
Amendment Since initial award the Potential Award value has increased 20% from $168,758,300 to $201,844,365.
Subcontracting Plan This Definitive Contract has an Individual Subcontract Plan. The Department of Defense has an overall small business subcontracting goal of 30%
MEB General Contractors was awarded Definitive Contract N4008522C0047 (N40085-22-C-0047) for P-678 Dry Dock 8 Saltwater System Construction Contract worth up to $201,844,365 by the Department of the Navy in September 2022. The contract has a duration of 4 years and was awarded through solicitation P-678 Dry Dock 8 Saltwater System for CVN-78, Norfolk Naval Shipyard, Portsmouth, Virginia full & open with NAICS 237990 and PSC Y1PZ via direct negotiation acquisition procedures with 3 bids received.

DOD Announcements

Sep 2022: MEB General Contractors Inc., Chesapeake, Virginia, is awarded an $89,411,498 firm-fixed-price contract for the CVN-78 Dry Dock 8 saltwater system at Norfolk Naval Shipyard, Virginia. The work to be performed provides for two phases of construction. Phase 1 will construct site power distribution including underground duct banks, feeders, pad-mounted switches, substations and underground feeders to Pumpwell 8. Phase 2 will demolish two pump stations and their saltwater intake structures, Buildings 828 and 829, and construct two saltwater pump stations including saltwater intakes, back-up power, pile foundations including additional timber wharf piles. The contract also contains one unexercised option, which if exercised, would increase the cumulative contract value to $168,758,300. The work will be performed in Portsmouth, Virginia, and is expected to be completed by September 2026. Fiscal 2022 military construction (Navy) funds in the amount of $56,554,300 are obligated on this award and will not expire at the end of the current fiscal year. This contract was competitively procured via the System for Award Management website with three proposals received. The Naval Facilities Engineering Systems Command, Mid-Atlantic, Norfolk, Virginia, is the contracting activity (N40085-22-C-0047).

Status
(Complete)

Last Modified 12/15/25
Period of Performance
9/23/22
Start Date
9/9/26
Current End Date
9/9/26
Potential End Date
100% Complete

Obligations
$201.8M
Total Obligated
$201.8M
Current Award
$201.8M
Potential Award
100% Funded

Award Hierarchy

Definitive Contract

N4008522C0047

Subcontracts

0

Activity Timeline

Interactive chart of timeline of amendments to N4008522C0047

Opportunity Lifecycle

Procurement history for N4008522C0047

Transaction History

Modifications to N4008522C0047

People

Suggested agency contacts for N4008522C0047

Competition

Number of Bidders
3
Solicitation Procedures
Negotiated Proposal/Quote
Evaluated Preference
None
Commercial Item Acquisition
Commercial Item Procedures Not Used
Simplified Procedures for Commercial Items
No

Other Categorizations

Subcontracting Plan
Individual Subcontract Plan
Cost Accounting Standards
Exempt
Business Size Determination
Large Business
Defense Program
None
DoD Claimant Code
Construction
IT Commercial Item Category
Not Applicable
Awardee UEI
EJHTLA7NAFH4
Awardee CAGE
0CVN7
Agency Detail
Awarding Office
N62470 NAVFACSYSCOM ATLANTIC
Funding Office
N46270
Created By
ryan.p.forde.civ.n62470@us.navy.mil
Last Modified By
ryan.p.forde.civ.n62470@us.navy.mil
Approved By
ryan.p.forde.civ.n62470@us.navy.mil

Legislative

Legislative Mandates
Construction Wage Rate Requirements
Performance District
VA-03
Senators
Mark Warner
Timothy Kaine
Representative
Robert Scott
Modified: 12/15/25