Search Prime Contracts

N4008519C9261

Definitive Contract

Overview

Government Description
P-293 PAINT, BLAST AND RUBBER CONSOLIDATION FACILITY, PORTSMOUTH NAVAL SHIPYARD, KITTERY, ME
Place of Performance
Kittery, ME 3904 United States
Pricing
Fixed Price
Set Aside
None
Extent Competed
Full And Open Competition
Analysis Notes
Amendment Since initial award the Potential End Date has been extended from 08/09/22 to 02/23/25 and the Potential Award value has increased 28% from $88,344,767 to $113,114,947.
Recompete The following similar solicitation(s) may continue aspects of this contract: DESIGN-BID-BUILD (DBB), B14 NEW STAIR/LIFE SAFETY/POWER IMPROVEMENTS PORTSMOUTH NAVAL SHIPYARD (PNSY), KITTERY, MAINE, DESIGN-BID-BUILD (DBB), B14 NEW STAIR/LIFE SAFETY/POWER IMPROVEMENTS PORTSMOUTH NAVAL SHIPYARD (PNSY), KITTERY, MAINE
Subcontracting Plan This Definitive Contract has an Individual Subcontract Plan. The Department of Defense has an overall small business subcontracting goal of 30%
Unrealized Backlog This Definitive Contract is complete with $1,927,200 of unfunded backlog unused.
Methuen Construction was awarded Definitive Contract N4008519C9261 (N40085-19-C-9261) for P-293 Paint, Blast And Rubber Consolidation Facility, Portsmouth Naval Shipyard, Kittery, Me worth up to $113,114,947 by Naval Facilities Engineering Command in September 2019. The contract has a duration of 5 years 5 months and was awarded through solicitation DESIGN BID BUILD (DBB) P-293, PAINT, BLAST, AND RUBBER CONSOLIDATION FACILITY, PORTSMOUTH NAVAL SHIPYARD (PNSY), KITTERY MAINE full & open with NAICS 236210 and PSC Y1EZ via direct negotiation acquisition procedures with 2 bids received. As of today, the Definitive Contract has a total reported backlog of $1,927,200, though the contract is complete, so backlog may not be realized.

DOD Announcements

Sep 2019: Methuen Construction Co. Inc., Plaistow, New Hampshire, is awarded a $59,397,989 firm-fixed-price contract for construction of a paint blast and rubber consolidation facility located at the Portsmouth Naval Shipyard. Work will be performed in Kittery, Maine, and is expected to be completed by September 2023. Project P-293 will consolidate paint, blast, rubber manufacturing, and plastic molding operations into one location within the controlled industrial area by constructing a new facility, converting existing buildings, and demolishing excess footprint. The new facility will be low-rise and consist of high and low-bay industrial shop areas, as well as offices, break rooms, locker rooms, training and support spaces. Buildings #55, #60 and #74 will be renovated and converted to support industrial, maintenance and their administrative functions. Project relocates and consolidates Shop #06 into Building #60. The new facility will support installation of new blast and paint booths requiring ventilation systems, dust collectors, and full floor grit recovery systems. New production areas will also support consolidation of rubber production and molding operations, fiberglass repairs, adequate cleaning/prep areas and environmentally controlled storage for curing preserved products. The high bay area and shaft refurbishment booth will be equipped with bridge cranes. The very large parts work area will have convenient access for portal crane from the waterfront and trucks for component delivery. Fiscal 2018 military construction, (Navy) contract funds in the amount of $59,397,989 are obligated on this award and will not expire at the end of the current fiscal year. This contract was competitively procured via the Navy Electronic Commerce Online website with two proposals received. The Naval Facilities Engineering Command, Mid-Atlantic, Norfolk, Virginia, is the contracting activity (N40085-19-C-9261).

Status
(Complete)

Last Modified 1/24/25
Period of Performance
9/25/19
Start Date
2/23/25
Current End Date
2/23/25
Potential End Date
100% Complete

Obligations and Backlog
$111.2M
Total Obligated
$111.2M
Current Award
$113.1M
Potential Award
98% Funded
$0.0
Funded Backlog
$1.9M
Total Backlog

Award Hierarchy

Definitive Contract

N4008519C9261

Subcontracts

0

Activity Timeline

Interactive chart of timeline of amendments to N4008519C9261

Opportunity Lifecycle

Procurement history for N4008519C9261

Transaction History

Modifications to N4008519C9261

People

Suggested agency contacts for N4008519C9261

Competition

Number of Bidders
2
Solicitation Procedures
Negotiated Proposal/Quote
Evaluated Preference
None
Commercial Item Acquisition
Commercial Item Procedures Not Used
Simplified Procedures for Commercial Items
No

Other Categorizations

Subcontracting Plan
Individual Subcontract Plan
Cost Accounting Standards
Exempt
Business Size Determination
Large Business
Defense Program
None
DoD Claimant Code
Construction
IT Commercial Item Category
Not Applicable
Awardee UEI
YLPBBJMMM5K8
Awardee CAGE
01AE6
Agency Detail
Awarding Office
N62470 NAVFACSYSCOM ATLANTIC
Funding Office
N62470
Created By
brad.beisswanger@navy.mil
Last Modified By
brad.beisswanger@navy.mil
Approved By
brad.beisswanger@navy.mil

Legislative

Legislative Mandates
Construction Wage Rate Requirements
Performance District
ME-01
Senators
Susan Collins
Angus King
Representative
Chellie Pingree
Modified: 1/24/25