N0002422C2253
Definitive Contract
Overview
Government Description
YRBM craft no. 1. This award is for the detail design and construction of Yard Repair, Berthing, And Messing (YRBM) craft at the contractor’s facilities. The contractor is responsible for technical design, construction, testing, delivery, and management of the YRBM craft, as well as identifying and correcting any problems that could impact on-schedule completion. Work is performed in amelia, Louisiana.
Awardee
Awarding / Funding Agency
Place of Performance
Morgan City, LA 70380 United States
Pricing
Fixed Price
Set Aside
Small Business Set Aside - Total (SBA)
Extent Competed
Full And Open Competition After Exclusion Of Sources
Related Opportunity
Analysis Notes
Forecast Listed as the incumbent award in contract forecast FY26 0222 300 YRBM Craft.
Amendment Since initial award the Potential End Date has been extended from 12/31/25 to 06/30/27 and the Potential Award value has increased 78% from $142,816,915 to $254,606,255.
Amendment Since initial award the Potential End Date has been extended from 12/31/25 to 06/30/27 and the Potential Award value has increased 78% from $142,816,915 to $254,606,255.
Conrad Shipyard was awarded
Definitive Contract N0002422C2253 (N00024-22-C-2253)
worth up to $254,606,255
by Naval Sea Systems Command
in March 2022.
The contract
has a duration of 5 years 3 months and
was awarded
through solicitation Yard Repair, Berthing and Messing Barge (YRBM) Additional Craft
with a Small Business Total set aside
with
NAICS 336611 and
PSC 1930
via sealed bid acquisition procedures with 6 bids received.
As of today, the Definitive Contract has a total reported backlog of $4,957,912.
DOD Announcements
Mar 2022:
Conrad Shipyard LLC,* Morgan City, Louisiana, is awarded an $18,988,990 firm-fixed-price contract for the detail design and construction of the Yard, Repair, Berthing, and Messing (YRBM) craft. This contract includes options which, if exercised, would bring the cumulative value of this contract to $142,906,420. Work will be performed in Amelia, Louisiana, and is expected to be completed by November 2023. If all options are exercised, work will continue through December 2025. Fiscal 2021 appropriation account shipbuilding and conversion (Navy) funds in the amount of $18,899,485 will be obligated at time of award. This contract was competitively procured via the beta.sam.gov website, with six offers received. The Naval Sea Systems Command, Washington, D.C., is the contracting activity (N00024-22-C-2253).
Jul 2022: Conrad Shipyard LLC,* Morgan City, Louisiana, is awarded a $34,872,992 firm-fixed-price modification to previously awarded contract N00024-22-C-2253 for the detail design and construction of two additional Yard, Repair, Berthing, and Messing craft. Work will be performed in Amelia, Louisiana, and is expected to be completed by September 2024. Fiscal 2022 shipbuilding and conversion (Navy) funds in the amount of $34,872,992 will be obligated at time of award and will not expire at the end of the current fiscal year. The Naval Sea Systems Command, Washington, D.C., is the contracting activity.
Sep 2022: Conrad Shipyard LLC,* Morgan City, Louisiana, is awarded a $17,297,440 firm-fixed-price modification to previously-awarded contract N00024-22-C-2253 for the detail, design, and construction of one additional Yard, Repair, Berthing, and Messing craft. Work will be performed in Amelia, Louisiana, and is expected to be completed by September 2024. Fiscal 2022 shipbuilding and conversion (Navy) funds in the amount of $17,297,440 will be obligated at time of award and will not expire at the end of the current fiscal year. The Naval Sea Systems Command, Washington, D.C., is the contracting activity.
Jun 2023: Conrad Shipyard LLC,* Morgan City, Louisiana, is awarded a $18,293,952 firm-fixed-price modification to previously-awarded contract N00024-22-C-2253 for the detail design and construction of one additional Yard, Repair, Berthing, and Messing craft. Work will be performed in Amelia, Louisiana, and is expected to be completed by March 2025. Fiscal 2023 shipbuilding and conversion (Navy) funds in the amount of $18,293,952 (100%) will be obligated at the time of award and will not expire at the end of the current fiscal year. The Naval Sea Systems Command, Washington, D.C., is the contracting activity.
Mar 2024: Conrad Shipyard LLC,* Morgan City, Louisiana, is awarded a $18,484,619 firm-fixed-price modification to a previously awarded contract (N00024-22-C-2253) for the detail design and construction of one additional Yard, Repair, Berthing, and Messing craft, with delivery to Norfolk, Virginia. This award also includes exercise of a design changes option. Work will be performed in Amelia, Louisiana, and is expected to be completed by June 2025. Fiscal 2024 shipbuilding and conversion (Navy) funds in the amount of $18,100,763 (98%); and fiscal 2022 shipbuilding and conversion (Navy) funds in the amount of $383,856 (2%), will be obligated and will not expire at the end of the current fiscal year. Naval Sea Systems Command, Washington, D.C., is the contracting activity.
Jun 2024: Conrad Shipyard LLC,* Morgan City, Louisiana, is awarded a $19,216,091 firm-fixed-price modification to previously awarded contract N00024-22-C-2253 for the detail design and construction of an additional yard repair, berthing, and messing craft, with delivery to San Diego, California. This award includes exercise of a design changes option. Work will be performed in Amelia, Louisiana, and is expected to be completed by September 2025. Fiscal 2024 shipbuilding and conversion (Navy) funds in the amount of $19,216,091 will be obligated at time of award which will not expire at the end of the current fiscal year. Naval Sea Systems Command, Washington, D.C., is the contracting activity.
Aug 2024: Conrad Shipyard LLC,* Morgan City, Louisiana, is awarded an $18,185,672 firm-fixed-price modification to previously awarded contract N00024-22-C-2253 for the detail design and construction of one additional yard repair, berthing, and messing craft, with delivery to Norfolk, Virginia. Work will be performed in Amelia, Louisiana, and is expected to be completed by June 2026. Fiscal 2024 shipbuilding and conversion (Navy) funds in the amount of $18,185,672 will be obligated at time of award which will not expire at the end of the current fiscal year. The Naval Sea Systems Command, Washington, D.C., is the contracting activity.
Jun 2025: Conrad Shipyard LLC,* Morgan City, Louisiana, is awarded a $28,285,715 firm-fixed-price modification to previously awarded contract N00024-22-C-2253 to exercise an option for the detail design and construction of one additional Yard Repair, Berthing, and Messing craft. Work will be performed in Amelia, Louisiana, and is expected to be completed by June 2027. Fiscal 2025 shipbuilding and conversion (Navy) funds in the amount of $28,285,715 will be obligated at time of award which will not expire at the end of the current fiscal year. Naval Sea Systems Command, Washington, D.C., is the contracting activity.
Feb 2026: Conrad Shipyard LLC,* Morgan City, Louisiana, is awarded a $29,382,496 firm-fixed-price modification to a previously awarded contract (N00024-22-C-2253) for the detail, design, and construction of one additional Yard Repair, Berthing, and Messing craft and facility improvement incentive. Work will be performed in Amelia, Louisiana, and is expected to be completed by April 2028. Fiscal 2026 shipbuilding and conversion (Navy) funds in the amount of $29,045,674 (99%); and fiscal 2022 shipbuilding and conversion (Navy) in the amount of $336,822 (1%), will be obligated at time of award and will not expire at the end of the current fiscal year. This contract action was not competitively procured in accordance with 10 U.S. Code 3204(b)(B) (property or services considered to be available from only one source). Naval Sea Systems Command, Washington, D.C., is the contracting activity
Jul 2022: Conrad Shipyard LLC,* Morgan City, Louisiana, is awarded a $34,872,992 firm-fixed-price modification to previously awarded contract N00024-22-C-2253 for the detail design and construction of two additional Yard, Repair, Berthing, and Messing craft. Work will be performed in Amelia, Louisiana, and is expected to be completed by September 2024. Fiscal 2022 shipbuilding and conversion (Navy) funds in the amount of $34,872,992 will be obligated at time of award and will not expire at the end of the current fiscal year. The Naval Sea Systems Command, Washington, D.C., is the contracting activity.
Sep 2022: Conrad Shipyard LLC,* Morgan City, Louisiana, is awarded a $17,297,440 firm-fixed-price modification to previously-awarded contract N00024-22-C-2253 for the detail, design, and construction of one additional Yard, Repair, Berthing, and Messing craft. Work will be performed in Amelia, Louisiana, and is expected to be completed by September 2024. Fiscal 2022 shipbuilding and conversion (Navy) funds in the amount of $17,297,440 will be obligated at time of award and will not expire at the end of the current fiscal year. The Naval Sea Systems Command, Washington, D.C., is the contracting activity.
Jun 2023: Conrad Shipyard LLC,* Morgan City, Louisiana, is awarded a $18,293,952 firm-fixed-price modification to previously-awarded contract N00024-22-C-2253 for the detail design and construction of one additional Yard, Repair, Berthing, and Messing craft. Work will be performed in Amelia, Louisiana, and is expected to be completed by March 2025. Fiscal 2023 shipbuilding and conversion (Navy) funds in the amount of $18,293,952 (100%) will be obligated at the time of award and will not expire at the end of the current fiscal year. The Naval Sea Systems Command, Washington, D.C., is the contracting activity.
Mar 2024: Conrad Shipyard LLC,* Morgan City, Louisiana, is awarded a $18,484,619 firm-fixed-price modification to a previously awarded contract (N00024-22-C-2253) for the detail design and construction of one additional Yard, Repair, Berthing, and Messing craft, with delivery to Norfolk, Virginia. This award also includes exercise of a design changes option. Work will be performed in Amelia, Louisiana, and is expected to be completed by June 2025. Fiscal 2024 shipbuilding and conversion (Navy) funds in the amount of $18,100,763 (98%); and fiscal 2022 shipbuilding and conversion (Navy) funds in the amount of $383,856 (2%), will be obligated and will not expire at the end of the current fiscal year. Naval Sea Systems Command, Washington, D.C., is the contracting activity.
Jun 2024: Conrad Shipyard LLC,* Morgan City, Louisiana, is awarded a $19,216,091 firm-fixed-price modification to previously awarded contract N00024-22-C-2253 for the detail design and construction of an additional yard repair, berthing, and messing craft, with delivery to San Diego, California. This award includes exercise of a design changes option. Work will be performed in Amelia, Louisiana, and is expected to be completed by September 2025. Fiscal 2024 shipbuilding and conversion (Navy) funds in the amount of $19,216,091 will be obligated at time of award which will not expire at the end of the current fiscal year. Naval Sea Systems Command, Washington, D.C., is the contracting activity.
Aug 2024: Conrad Shipyard LLC,* Morgan City, Louisiana, is awarded an $18,185,672 firm-fixed-price modification to previously awarded contract N00024-22-C-2253 for the detail design and construction of one additional yard repair, berthing, and messing craft, with delivery to Norfolk, Virginia. Work will be performed in Amelia, Louisiana, and is expected to be completed by June 2026. Fiscal 2024 shipbuilding and conversion (Navy) funds in the amount of $18,185,672 will be obligated at time of award which will not expire at the end of the current fiscal year. The Naval Sea Systems Command, Washington, D.C., is the contracting activity.
Jun 2025: Conrad Shipyard LLC,* Morgan City, Louisiana, is awarded a $28,285,715 firm-fixed-price modification to previously awarded contract N00024-22-C-2253 to exercise an option for the detail design and construction of one additional Yard Repair, Berthing, and Messing craft. Work will be performed in Amelia, Louisiana, and is expected to be completed by June 2027. Fiscal 2025 shipbuilding and conversion (Navy) funds in the amount of $28,285,715 will be obligated at time of award which will not expire at the end of the current fiscal year. Naval Sea Systems Command, Washington, D.C., is the contracting activity.
Feb 2026: Conrad Shipyard LLC,* Morgan City, Louisiana, is awarded a $29,382,496 firm-fixed-price modification to a previously awarded contract (N00024-22-C-2253) for the detail, design, and construction of one additional Yard Repair, Berthing, and Messing craft and facility improvement incentive. Work will be performed in Amelia, Louisiana, and is expected to be completed by April 2028. Fiscal 2026 shipbuilding and conversion (Navy) funds in the amount of $29,045,674 (99%); and fiscal 2022 shipbuilding and conversion (Navy) in the amount of $336,822 (1%), will be obligated at time of award and will not expire at the end of the current fiscal year. This contract action was not competitively procured in accordance with 10 U.S. Code 3204(b)(B) (property or services considered to be available from only one source). Naval Sea Systems Command, Washington, D.C., is the contracting activity
Status
(Open)
Last Modified 1/28/26
Period of Performance
3/15/22
Start Date
6/16/27
Current End Date
6/16/27
Potential End Date
Obligations and Backlog
$249.6M
Total Obligated
$249.6M
Current Award
$254.6M
Potential Award
$0.0
Funded Backlog
$5.0M
Total Backlog
Award Hierarchy
Definitive Contract
N0002422C2253
Subcontracts
Activity Timeline
Opportunity Lifecycle
Procurement history for N0002422C2253
Transaction History
Modifications to N0002422C2253
People
Suggested agency contacts for N0002422C2253
Competition
Number of Bidders
6
Solicitation Procedures
Sealed Bid
Evaluated Preference
None
Commercial Item Acquisition
Commercial Item
Simplified Procedures for Commercial Items
No
Other Categorizations
Subcontracting Plan
Plan Not Required
Cost Accounting Standards
Exempt
Business Size Determination
Small Business
Defense Program
None
DoD Claimant Code
Ships
IT Commercial Item Category
Not Applicable
Awardee UEI
W1JVE3BNA7P1
Awardee CAGE
5GE25
Agency Detail
Awarding Office
N69316 SUP OF SHIPBUILDING CONV AND REPAIR
Funding Office
N00024
Created By
douglas.ellington1@navy.mil
Last Modified By
jonas.paterno.n69316@sa1700.sea.gc
Approved By
douglas.ellington1@navy.mil
Legislative
Legislative Mandates
None Applicable
Performance District
LA-03
Senators
Bill Cassidy
John Kennedy
John Kennedy
Representative
Clay Higgins
Modified: 1/28/26