N0002416C5102
Definitive Contract
Overview
Government Description
AEGIS FOLLOW ON SUPPORT FOR DDGS 116-118 REPRESENTING COMPLETION OF THE DEVELOPMENT AND FIELDING OF THE AEGIS BASELINE 9
Awardee
Awarding / Funding Agency
Place of Performance
Moorestown, NJ 8057 United States
Pricing
Cost Plus Incentive Fee
Set Aside
None
Extent Competed
Not Competed
Related Opportunity
N0002415R5193
Analysis Notes
Amendment Since initial award the Potential End Date has been extended from 07/21/21 to 09/29/23 and the Potential Award value has increased 6% from $426,003,082 to $449,811,743.
Sole Source This Definitive Contract was awarded sole source to Lockheed Martin Corporation because the government believes that only one company can provide the product / service (FAR 6.302-1).
Subcontracting Plan This Definitive Contract has a DOD Comprehensive Subcontracting Plan. The Department of Defense has an overall small business subcontracting goal of 30%
Unrealized Backlog This Definitive Contract is complete with $34,679,155 of funded backlog and $43,835,589 of unfunded backlog unused, which is typically due to unexercised options.
Sole Source This Definitive Contract was awarded sole source to Lockheed Martin Corporation because the government believes that only one company can provide the product / service (FAR 6.302-1).
Subcontracting Plan This Definitive Contract has a DOD Comprehensive Subcontracting Plan. The Department of Defense has an overall small business subcontracting goal of 30%
Unrealized Backlog This Definitive Contract is complete with $34,679,155 of funded backlog and $43,835,589 of unfunded backlog unused, which is typically due to unexercised options.
Lockheed Martin Corporation was awarded
Definitive Contract N0002416C5102 (N00024-16-C-5102)
worth up to $449,811,743
by Naval Sea Systems Command
in September 2016.
The contract
has a duration of 7 years and
was awarded
full & open
with
NAICS 334511 and
PSC 1285
via sole source acquisition procedures with 1 bid received.
As of today, the Definitive Contract has a total reported backlog of $43,835,589 and funded backlog of $34,679,155, though the contract is complete, so backlog may not be realized.
DOD Announcements
Sep 2016:
Lockheed Martin Rotary and Mission Systems, Moorestown, New Jersey, is being awarded a $157,418,328 cost-plus-incentive-fee contract for the procurement of the DDG 116-118 Aegis follow-on support services representing completion of the development and fielding of the Aegis Baseline 9 Aegis Weapon System and Integrated Aegis Combat System on the remaining Aegis Technical Insertion 12 (TI 12) configured destroyers as well as TI12 and TI08 configured cruisers. This contract includes options which, if exercised, would bring the cumulative value of this contract to $426,003,083. Work will be performed in Moorestown, New Jersey (95 percent); Johnstown, Pennsylvania (3 percent); and various places below one percent (2 percent), and is expected to be completed by September 2017. Fiscal 2016 operations and maintenance (Navy); fiscal 2016 research and development test and evaluation (Navy); fiscal 2015 and 2016 other procurement (Navy); and fiscal 2013 shipbuilding and conversion (Navy) funding in the amount of $81,165,695 will be obligated at time of award. Contract funds in the amount of $4,833,928 will expire at the end of the current fiscal year. This contract was not competitively procured in accordance with 10 U.S. Code 2304(c)(1) - only one responsible source and no other supplies or services will satisfy agency requirements. The Naval Sea Systems Command, Washington, District of Columbia, is the contracting activity (N00024-16-C-5102).
Jul 2017: Lockheed Martin, Rotary and Mission Systems, Moorestown, New Jersey, is being awarded a $93,492,386 cost-plus-incentive-fee modification to a previously awarded contract (N00024-16-C-5102) to exercise options for DDG 116-118 AEGIS follow-on support services. The contract provides for the completion of the development and fielding of the AEGIS Baseline 9 AEGIS Weapon System and integrated AEGIS Combat System on the remaining AEGIS Technical Insertion (TI) 12 configured destroyers as well as TI 12 and TI 08 configured cruisers. Work will be performed in Moorestown, New Jersey (97 percent); and Johnstown, Pennsylvania (3 percent), and is expected to be completed by July 2018. Fiscal 2017 research, development, test & evaluation (Navy and Department of Defense); fiscal 2012 and 2013 shipbuilding and conversion (Navy); and fiscal 2017 operations and maintenance (Navy) funding in the amount of $29,173,822 will be obligated at time of award and $1,210,000 will expire at the end of the current fiscal year. The Naval Sea Systems Command, Washington, District of Columbia, is the contracting activity.
Mar 2018: Lockheed Martin, Rotary and Mission Systems, Moorestown, New Jersey, is being awarded an $8,931,712 cost-plus-incentive-fee modification to a previously awarded contract (N00024-16-C-5102) to exercise an option for AEGIS speed to capability development. The contract provides for the completion of the development and fielding of the AEGIS Baseline 9 AEGIS weapon system and integrated AEGIS combat system on the remaining AEGIS technical insertion (TI) 12 configured destroyers as well as TI 12 and TI 08 configured cruisers. Work will be performed in Moorestown, New Jersey (97 percent); and Johnstown, Pennsylvania (3 percent), and is expected to be completed by April 2019. Fiscal 2018 research, development, test and evaluation (Navy) funding in the amount of $484,532 will be obligated at time of award and will not expire at the end of the current fiscal year. The Naval Sea Systems Command, Washington, District of Columbia, is the contracting activity.
May 2018: Lockheed Martin, Rotary and Mission Systems, Moorestown, New Jersey, is being awarded a $34,633,650 cost-plus-incentive-fee modification to a previously awarded contract (N00024-16-C-5102) to exercise options for Baseline 9 integration and delivery, capability improvements, Navy integrated fire control-counter air collateral and Baseline 9 engineering. Work will be performed in Moorestown, New Jersey, and is expected to be completed by July 2019. Fiscal 2018 research, development, test and evaluation (Navy); and fiscal 2018 weapon procurement (Navy) funding in the amount of $5,391,451 will be obligated at time of award and will not expire at the end of the current fiscal year. The Naval Sea Systems Command, Washington, District of Columbia, is the contracting activity.
Jun 2018: Lockheed Martin, Rotary and Mission Systems, Moorestown, New Jersey, is awarded an $18,921,481 cost-plus-incentive-fee modification to a previously awarded contract (N00024-16-C-5102) to exercise options for Aegis Baseline 9 capability development, studies, initiatives and support and Technical Insertion-08 CG upgrade. The contract provides for the completion of the development and fielding of the Aegis Baseline 9 Aegis weapon system and integrated Aegis combat system on the remaining Aegis TI 12 configured destroyers as well as TI 12 and TI 08 configured cruisers. Work will be performed in Moorestown, New Jersey, and is expected to be completed by July 2019. Fiscal 2018 research, development, test & evaluation (Navy); and fiscal 2018 operations and maintenance (Navy) funding in the amount of $3,229,000 will be obligated at time of award and will not expire at the end of the current fiscal year. The Naval Sea Systems Command, Washington, District of Columbia, is the contracting activity.
Jan 2019: Lockheed Martin, Rotary and Mission Systems, Moorestown, New Jersey, is awarded a $28,882,337 cost-plus-incentive-fee modification to previously awarded contract N00024-16-C-5102 for AEGIS Baseline 9 Integration and Delivery, TI-08 CG Upgrade, AEGIS Baseline 9 Capability Development, Capability Improvements, Baseline 9 Sea Based Non-Cooperative Target Recognition Development and Radar Engineering. Work will be performed in Moorestown, New Jersey, and is expected to be complete by July 2019. Fiscal 2019 research, development, test and evaluation (Navy); fiscal 2013 shipbuilding and conversion (Navy); fiscal 2019 other procurement (Navy); 2019 operations and maintenance (Navy); and 2019 weapons procurement (Navy), funding in the amount of $28,882,337 will be obligated at time of award and funds in the amount of $1,530,764 will expire at the end of the current fiscal year. The Naval Sea Systems Command, Washington, District of Columbia, is the contracting activity.
Apr 2019: Lockheed Martin, Rotary and Mission Systems, Moorestown, New Jersey, is awarded a $13,908,052 cost-plus-incentive-fee modification to previously awarded contract N00024-16-C-5102 to exercise an option for AEGIS Speed to Capability Development. The contract provides for systems engineering, modeling and simulation, and design for AEGIS Speed to Capability cycles as well as the completion of the development and fielding of the AEGIS Baseline 9 AEGIS Weapon System and integrated AEGIS Combat System on AEGIS Technical Insertion (TI) 12 configured destroyers as well as TI 12 and TI 08 configured cruisers. Work will be performed in Moorestown, New Jersey (97 percent) and Johnstown, Pennsylvania (3 percent) and is expected to be complete by May 2020. Fiscal 2019 research, development, test & evaluation (Navy) funding in the amount of $1,938,130 will be obligated at time of award and will not expire at the end of the current fiscal year. The Naval Sea Systems Command, Washington, District of Columbia, is the contracting activity.
Jul 2019: Lockheed Martin, Rotary and Mission Systems, Moorestown, New Jersey, is awarded a $22,558,157 cost-plus-incentive-fee modification to previously awarded contract N00024-16-C-5102 to exercise options for AEGIS Baseline 9 integration and delivery, Aegis Baseline 5.4 and 9A2A post-certification support. This contract provides for the completion of the development and fielding of the AEGIS Baseline 9 AEGIS Weapon System and integrated AEGIS Combat System on the remaining AEGIS Technical Insertion (TI) 12 configured destroyers as well as TI 12 and TI 08 configured cruisers. Work will be performed in Moorestown, New Jersey, and is expected to be completed by July 2020. Fiscal 2018 other procurement (Navy); fiscal 2019 operations and maintenance (Navy); fiscal 2019 research, development, test and evaluation (Navy); fiscal 2019 research, development, test and evaluation (Missile Defense Agency); and fiscal 2014 shipbuilding and conversion (Navy) funds in the amount of $8,925,765 will be obligated at time of award and funding in the amount of $2,456,011 will expire at the end of the current fiscal year. The Naval Sea Systems Command, Washington, District of Columbia, is the contracting activity.
Jul 2020: Lockheed Martin, Rotary and Mission Systems, Moorestown, New Jersey, is awarded a $7,344,470 cost-plus-incentive-fee modification to previously awarded contract N00024-16-C-5102 to exercise an option for AEGIS Platform Systems Engineering Agent efforts for the integration and delivery of AEGIS Baseline 9 capabilities. Work will be performed in Moorestown, New Jersey. The contract provides for the completion of the development and fielding of the AEGIS Baseline 9 AEGIS Weapon System and integrated AEGIS Combat System on the remaining AEGIS Technical Insertion (TI) 12 configured destroyers as well as TI 12 and TI 08 configured cruisers. Work is expected to be completed by July 2021. Fiscal 2013 shipbuilding and conversion (Navy); fiscal 2020 operations and maintenance (Navy); fiscal 2020 other procurement (Navy); and fiscal 2020 research, development, test and evaluation funding in the amount of $7,344,470 will be obligated at time of award and funding in the amount of $1,380,964 will expire at the end of the current fiscal year. The Naval Sea Systems Command, Washington, D.C., is the contracting activity.
Jul 2017: Lockheed Martin, Rotary and Mission Systems, Moorestown, New Jersey, is being awarded a $93,492,386 cost-plus-incentive-fee modification to a previously awarded contract (N00024-16-C-5102) to exercise options for DDG 116-118 AEGIS follow-on support services. The contract provides for the completion of the development and fielding of the AEGIS Baseline 9 AEGIS Weapon System and integrated AEGIS Combat System on the remaining AEGIS Technical Insertion (TI) 12 configured destroyers as well as TI 12 and TI 08 configured cruisers. Work will be performed in Moorestown, New Jersey (97 percent); and Johnstown, Pennsylvania (3 percent), and is expected to be completed by July 2018. Fiscal 2017 research, development, test & evaluation (Navy and Department of Defense); fiscal 2012 and 2013 shipbuilding and conversion (Navy); and fiscal 2017 operations and maintenance (Navy) funding in the amount of $29,173,822 will be obligated at time of award and $1,210,000 will expire at the end of the current fiscal year. The Naval Sea Systems Command, Washington, District of Columbia, is the contracting activity.
Mar 2018: Lockheed Martin, Rotary and Mission Systems, Moorestown, New Jersey, is being awarded an $8,931,712 cost-plus-incentive-fee modification to a previously awarded contract (N00024-16-C-5102) to exercise an option for AEGIS speed to capability development. The contract provides for the completion of the development and fielding of the AEGIS Baseline 9 AEGIS weapon system and integrated AEGIS combat system on the remaining AEGIS technical insertion (TI) 12 configured destroyers as well as TI 12 and TI 08 configured cruisers. Work will be performed in Moorestown, New Jersey (97 percent); and Johnstown, Pennsylvania (3 percent), and is expected to be completed by April 2019. Fiscal 2018 research, development, test and evaluation (Navy) funding in the amount of $484,532 will be obligated at time of award and will not expire at the end of the current fiscal year. The Naval Sea Systems Command, Washington, District of Columbia, is the contracting activity.
May 2018: Lockheed Martin, Rotary and Mission Systems, Moorestown, New Jersey, is being awarded a $34,633,650 cost-plus-incentive-fee modification to a previously awarded contract (N00024-16-C-5102) to exercise options for Baseline 9 integration and delivery, capability improvements, Navy integrated fire control-counter air collateral and Baseline 9 engineering. Work will be performed in Moorestown, New Jersey, and is expected to be completed by July 2019. Fiscal 2018 research, development, test and evaluation (Navy); and fiscal 2018 weapon procurement (Navy) funding in the amount of $5,391,451 will be obligated at time of award and will not expire at the end of the current fiscal year. The Naval Sea Systems Command, Washington, District of Columbia, is the contracting activity.
Jun 2018: Lockheed Martin, Rotary and Mission Systems, Moorestown, New Jersey, is awarded an $18,921,481 cost-plus-incentive-fee modification to a previously awarded contract (N00024-16-C-5102) to exercise options for Aegis Baseline 9 capability development, studies, initiatives and support and Technical Insertion-08 CG upgrade. The contract provides for the completion of the development and fielding of the Aegis Baseline 9 Aegis weapon system and integrated Aegis combat system on the remaining Aegis TI 12 configured destroyers as well as TI 12 and TI 08 configured cruisers. Work will be performed in Moorestown, New Jersey, and is expected to be completed by July 2019. Fiscal 2018 research, development, test & evaluation (Navy); and fiscal 2018 operations and maintenance (Navy) funding in the amount of $3,229,000 will be obligated at time of award and will not expire at the end of the current fiscal year. The Naval Sea Systems Command, Washington, District of Columbia, is the contracting activity.
Jan 2019: Lockheed Martin, Rotary and Mission Systems, Moorestown, New Jersey, is awarded a $28,882,337 cost-plus-incentive-fee modification to previously awarded contract N00024-16-C-5102 for AEGIS Baseline 9 Integration and Delivery, TI-08 CG Upgrade, AEGIS Baseline 9 Capability Development, Capability Improvements, Baseline 9 Sea Based Non-Cooperative Target Recognition Development and Radar Engineering. Work will be performed in Moorestown, New Jersey, and is expected to be complete by July 2019. Fiscal 2019 research, development, test and evaluation (Navy); fiscal 2013 shipbuilding and conversion (Navy); fiscal 2019 other procurement (Navy); 2019 operations and maintenance (Navy); and 2019 weapons procurement (Navy), funding in the amount of $28,882,337 will be obligated at time of award and funds in the amount of $1,530,764 will expire at the end of the current fiscal year. The Naval Sea Systems Command, Washington, District of Columbia, is the contracting activity.
Apr 2019: Lockheed Martin, Rotary and Mission Systems, Moorestown, New Jersey, is awarded a $13,908,052 cost-plus-incentive-fee modification to previously awarded contract N00024-16-C-5102 to exercise an option for AEGIS Speed to Capability Development. The contract provides for systems engineering, modeling and simulation, and design for AEGIS Speed to Capability cycles as well as the completion of the development and fielding of the AEGIS Baseline 9 AEGIS Weapon System and integrated AEGIS Combat System on AEGIS Technical Insertion (TI) 12 configured destroyers as well as TI 12 and TI 08 configured cruisers. Work will be performed in Moorestown, New Jersey (97 percent) and Johnstown, Pennsylvania (3 percent) and is expected to be complete by May 2020. Fiscal 2019 research, development, test & evaluation (Navy) funding in the amount of $1,938,130 will be obligated at time of award and will not expire at the end of the current fiscal year. The Naval Sea Systems Command, Washington, District of Columbia, is the contracting activity.
Jul 2019: Lockheed Martin, Rotary and Mission Systems, Moorestown, New Jersey, is awarded a $22,558,157 cost-plus-incentive-fee modification to previously awarded contract N00024-16-C-5102 to exercise options for AEGIS Baseline 9 integration and delivery, Aegis Baseline 5.4 and 9A2A post-certification support. This contract provides for the completion of the development and fielding of the AEGIS Baseline 9 AEGIS Weapon System and integrated AEGIS Combat System on the remaining AEGIS Technical Insertion (TI) 12 configured destroyers as well as TI 12 and TI 08 configured cruisers. Work will be performed in Moorestown, New Jersey, and is expected to be completed by July 2020. Fiscal 2018 other procurement (Navy); fiscal 2019 operations and maintenance (Navy); fiscal 2019 research, development, test and evaluation (Navy); fiscal 2019 research, development, test and evaluation (Missile Defense Agency); and fiscal 2014 shipbuilding and conversion (Navy) funds in the amount of $8,925,765 will be obligated at time of award and funding in the amount of $2,456,011 will expire at the end of the current fiscal year. The Naval Sea Systems Command, Washington, District of Columbia, is the contracting activity.
Jul 2020: Lockheed Martin, Rotary and Mission Systems, Moorestown, New Jersey, is awarded a $7,344,470 cost-plus-incentive-fee modification to previously awarded contract N00024-16-C-5102 to exercise an option for AEGIS Platform Systems Engineering Agent efforts for the integration and delivery of AEGIS Baseline 9 capabilities. Work will be performed in Moorestown, New Jersey. The contract provides for the completion of the development and fielding of the AEGIS Baseline 9 AEGIS Weapon System and integrated AEGIS Combat System on the remaining AEGIS Technical Insertion (TI) 12 configured destroyers as well as TI 12 and TI 08 configured cruisers. Work is expected to be completed by July 2021. Fiscal 2013 shipbuilding and conversion (Navy); fiscal 2020 operations and maintenance (Navy); fiscal 2020 other procurement (Navy); and fiscal 2020 research, development, test and evaluation funding in the amount of $7,344,470 will be obligated at time of award and funding in the amount of $1,380,964 will expire at the end of the current fiscal year. The Naval Sea Systems Command, Washington, D.C., is the contracting activity.
Status
(Complete)
Last Modified 7/10/24
Period of Performance
9/16/16
Start Date
9/29/23
Current End Date
9/29/23
Potential End Date
Obligations and Backlog
$406.0M
Total Obligated
$440.7M
Current Award
$449.8M
Potential Award
$34.7M
Funded Backlog
$43.8M
Total Backlog
Award Hierarchy
Definitive Contract
N0002416C5102
Subcontracts
Activity Timeline
Transaction History
Modifications to N0002416C5102
People
Suggested agency contacts for N0002416C5102
Competition
Number of Bidders
1
Solicitation Procedures
Sole Source
Other Than Full and Open Competition
Only One Source - Other
Evaluated Preference
None
Commercial Item Acquisition
Commercial Item Procedures Not Used
Simplified Procedures for Commercial Items
No
Other Categorizations
Subcontracting Plan
DOD Comprehensive Subcontract Plan
Cost Accounting Standards
Yes
Business Size Determination
Large Business
Defense Program
None
DoD Claimant Code
Weapons
IT Commercial Item Category
Not Applicable
Awardee UEI
CWM4UN76ZQW8
Awardee CAGE
02769
Agency Detail
Awarding Office
N00024 NAVSEA HQ
Funding Office
N00024
Created By
joseph.r.strain@navy.mil
Last Modified By
sysorig@sa1700.navsea.ent
Approved By
sysorig@sa1700.navsea.ent
Legislative
Legislative Mandates
Materials, Supplies, Articles & Equipment
Performance District
NJ-03
Senators
Robert Menendez
Cory Booker
Cory Booker
Representative
Andy Kim
Budget Funding
Federal Account | Budget Subfunction | Object Class | Total | Percentage |
---|---|---|---|---|
Research, Development, Test, and Evaluation, Navy (017-1319) | Department of Defense-Military | Research and development contracts (25.5) | $28,633,588 | 33% |
Research, Development, Test, and Evaluation, Navy (017-1319) | Department of Defense-Military | Advisory and assistance services (25.1) | $23,594,701 | 28% |
Other Procurement, Navy (017-1810) | Department of Defense-Military | Advisory and assistance services (25.1) | $15,726,656 | 18% |
Operation and Maintenance, Navy (017-1804) | Department of Defense-Military | Advisory and assistance services (25.1) | $14,109,593 | 16% |
Shipbuilding and Conversion, Navy (017-1611) | Department of Defense-Military | Advisory and assistance services (25.1) | $6,129,033 | 7% |
Modified: 7/10/24